p_
Gecrg*a Power Corrpar'y Route 2 Bcx 299A W3ynesboro Georg a 30630 Te'ephore 404 SS4 9'M1, Ext 3360 U S,",' R ( :
o 404 724 8114. Ert 3360 4 T( g,.gy[
,-[ili,;
' c ORGIs L
'!0V 9 P l, 4 3 Georgia Power D. o. Foster
$ne$[a$gN#
November 12, 1984
"""""*"A*"
Vogue Pro;ect United States Nuclear Regulatory Commission Office of Inspection and Enforcement File:
X7BG03-M59 Region II - Suite 2900 Log:
GN-441 101 Marietta Street, Northwest Atlanta, eeorgia 30323
Reference:
Vogtle Electric Generating Plant-Units 1 and 2, 50-424, 50-425; Transamerica Delaval Diesel Generator Thrust Bearings; GN-398, Dated August 1, 1984.
Attention:
Mr. James P. O'Reilly In previous correspondence on this subject, Georgia Power Company indicated that the proposed corrective action would be submitted to the NRC by November 16, 1984.
Enclosed is the proposed corrective action to resolve this subject.
This response completes Georgia Power Company's reporting requirements to the USNRC.
This response contains no proprietary information and may be placed in the NRC Public Document Room.
Yours truly /
t D. O. Foster REF/DOF/ tom xc:
U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C.
20555 R. J. Kelly J. A. Bailey G. Bockhold R. E. Conway
- 0. Batum P. D. Rice G. F. Head H. H. Gergory C. S. McCall (OPC)
J. T. Beckham W. T. Nickerson E. L. Blake, Jr. (Shaw, et. al. )
R. A. Thomas D. R. Altman J. E. Joiner D. E. Dutton D. L. Kinnsch (BPC)
(Troutman, et. al. )
W. F. Sanders (NRC)
J. L. Vota (W)
D. C. Teper (GANE)
R. H. Pinson L. T. Gucwa L. Fowler (LEAF)
B. M. Guthrie C. E. Belflower T. Johnson (ECPG)
E. D. Groover M. Malcom (BPC)
OWICIAL COPY
$$k2h 00 0 000
( d' l[t s
w
- =;
- ,7 i
CORRECTIVE ACTION STATEENT TRANSAE RICA DELAVAL DIESEL GENERATOR-THRUST BEARINGS Corrective Action:
Because of 'the different piping arrangements used for each diesel, Transamerica Delaval, Inc. (TDI) intends to perform a plant unique analysis after the engine and the associated equipment has been installed.
Where the lube oil piping system is being flushed, TDI will install temporary drip lube oil piping for the turbocharger thrust L
bearing to determine the actual size and arrangement of the permanent drip lube oil piping for the turbocharger thrust bearing.
The TDI service personnel assigned to the Vogtle site will perform the above activities.
Georgia Power Company is responsible for ensuring the corrective action is properly performed.
Georgia Power Company expects to have the corrective action completed by June 1, 1985.
L _.