Text
.
OPERATING DATA REPORT J
4 50-247 DOCKET NO.
DATE 11/1/84 COhlPLETI'.D itY M-Rin+e TELEPil0NE (9141 s26-5127
};
OPERATING STATUS Indian Point Unit #2 Notes Unit was returned
~
i
- 1. Unit Name:
to service on 10-21 October 1984
- 2. Reporting Period:
follow 2.ng the Cycle.6/7 779R
- 3. Licensed Thermal Power (hlWt):
ggg ggg 10I3
- 4. Nameplate Rating (Gros > SIWE):
g 873 "i
- 5. Design Electrical Rating (Net SIWE):
900
(
- 6. Maximum Dependable Capacity (Gross MWe):
864 j
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
Items 6 and 7 changed to winter ratings effective 0200 10/28/84 t
None
- 9. Power LevelTo Which Restricted.If Any (Net MWe);
No"e
- 10. Reasons For Restrictions.If Any:
5, e
i Cumihtive f!,
' Tids Month ~
Yr to-Date '
Q
- ..4 74 5 7320
'906251 i
II. Hours In Reporting Period 317.82 3546.50 59491.77 5
- 12. Number Of Hours Reactor Was Critical 18.72 18.72 2138.45 N
- 13. Reactor Reserve Shutdown Hours 3429.60 57625.30 224.88 5
- 14. Hours Generator On-Line 0
0 0
- 25. Unit Resene Shutdown Hours 415487 9AA171s 149676114
- 16. Gross Thermal Energy Generated (MWH)
I18840 2608370 46355946
- 17. Gross Electrical Energy Generated (5tWH) 101637 2565854 44192946 4
- 18. Net Electrical Energy Generated (MWH) 30.2 46.9' 63.6 3}'
- 19. Unit Senice Factor
- 30.2 46.9 63.6
- 20. Unit Availability Factor 16.0 4I.0 s6.9
- 21. Unit Cspacity Factor IUsing MDC Net)
_ 15.6 40.2 55.9 h
- 22. Unit Capacity FactorIUning DER Net) 13.8 12.8 9.4 f.)
,3. Unit Forced Outage Rate 2
'4. Shutdowns Seheduled Oser Next 6 Months (Type. Date.and Duration of Eacht:
9 2
NONE Q
n a
j
- 25. If Shut Doun At End Of Report Period. Estimated Date of Startup:
d
- 26. Units In Test Status tPrior o Commercial Operationi:
Forecast Achieved 1
t INITI AL CRITICALITY
\\
Iy
\\
N/A l)
INITITI. El.FCTRICITY
\\
\\
COM\\ll RCIAL Ort RATION
-r
'J l -I
- September 1984 Net Electrical Fa rgy Generated was revised to lo27)
~
g E 2.-
B412010169 841031 PDR ADOCK 05000247 R
pon 1
- 1. i......_
AVERAGE DAILY UNIT POWER LEVEL s
50-247 DOCKET NO.
I. P. UNIT # 2 i
11/2/84 DATE M. B!att COMPLETED BY
.y (914) 526-5127 TELEPHONE
-I
.i-li
?" -
OCTOBER 1984 ll MONTil
.e
-3 DAY AVEJtAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL R
(MWe Net)
(Mwe. Net)
'N I
37 O
'O 0
0 is d
2 w-
' h.;.
0 L --
3
.g, ;
O 0
- d 4
0 20
. r,., -
~0'~--
5 0
21 0
'8 6
0 22 y _-
(h :
_. s 7... ~ '.. '.
0 4
....23 s-
.. :.2.. 5 ].
- 53h ~
g s,
- }h 8.
-_ re 0
. 24
~299 0
342-
~~
i,'
9 ld 25 349 0 10 26 II 0 525 { ff2 t 27 s
- j.9 12 28 74_3 0
O .1 13 29 733 .t. 0 30 705 g{- 15 , 3, 14 0 -740 Q. 9 16 w ' it; s 11 d0 y{f INSTRUCTIONS ' gf On this fqrmat. fist the average daily unit power level in MWe Net for each day in the reporting month. Compute to y the nearest whole megawait. ,U I h-(9/77) I-b l ib <s t a -.....:_. : :.~ T. T 'T:
.~. ,'m .e a (, ' i 50-247 DOCKET NO. UNIT SHUTDOWNS AND %. REDUCTIONS i- ,r UNIT NAME I. P. #2 DATE 11/2/84 ",g 0^ fOCTOBER 1984 COMPLETED BY M-Blatt REPORT MONTH TELEPHONE (914)526-.5127 j B + g 5 3 an 3 Lkensee o" Eg' v1. Cause & Currective e es 3.s Xg& .E E E Action to
- pte
}- Date [ dj z g Event i Prevent Recurrence H al jdi g Report # 6 1 4 840602 S 484.18 C 1 N/A 'XX; XXXXXXX Cycle 6/7' Refueling Outage continued from September ir 5 841022. F 35.93 H 2 N/A !!J '. Turbin Fire on H.P. Turbine logging L 4 l t i i. }. ~ 't i 2 3 4 i F: Forced Reason: - Methent: Enliibit G. Instructions ~ 'j. I. Manual for Prepararion of Dara i 5: S(heduled A liquipment Failure (Explain)
- 8. Maintenance of Test t ' 2 Manual Scram.
Entry Shects for Lkensee O Refueling
- g. 3.Autosnatic Scrasa.
Event Repor ILERIFileiNUREG. D-Regulatory Restriction 3 40 lwr (Emplain). 0161) E-Operator Training & Ucenw Examinallun S. i F. Administrative r G-Operational Error (Explain) Esl@it l.Same Source i r8/77) ItOlier(Explain) -ja s t 5 t1 .s ..;;,,. a.,.._....,.., f.. ;..- c ...y, g,.,., r. - r-........-r g.
)
SUMMARY
OF OPEPATING EXPERIENCE Following completion of the Cycle 6/7 refueling and maintenance outage, the Indian Point Unit No. 2 reactor was brought critical on October 17, 1984. The Unit was synchronized to the bus on October 21, 1984 and reactor power gradually increased to 50% for further testing. On October 27, 1984, reactor power was brought up to 90% and conditions stabilized at this level for further physics testing and instrument calibrations. On October 16, premature lifting of two steam generator safety valves while the reactor was suberitical resulted in a safety injection actuation and reactor trip. Peactor trips occurred on October 20 from 10% and 5% reactor power due to, re spectively, a turbine trip during a mock turbine overspeed test and steam generator No. 22 low level mismatch while manually shifting from auxiliary to main feedwater. On October 22, reactor power was manually -decreased from 50% to 64 and a manual turbine-reactor trip initiated due to a fire in oil soaked insulation at the No. 1 main bearing of the Unit 2 main generator. Damage was minimal and the Unit was returned to service the following day. 4 4
- r 0~*
MAJOR SAFETY PELATED CORRECTIVE MAINTENANCE MWR NO. SYSTEM COMPONENT DATE WORK PERFORMED 14204 ELEC 24 SW Pump Breaker 7/16 Cleaned contacts and ( Alternate Feed) renewed burnt coil. 14205 ELEC 23 SW Pump Breaker 7/16 Cleaned contacts, in-(Alternate Feed) stalled new coil and adjusted breaker. 14616 VC 95' Airlock Inner 7/06 Aligned door. Door 14638 RVI Lifting Rig 7/25 Modified and adjusted lifting rig to fit reactor lower internals.
r 3 ,t-John D. O'Toob - i '7 vice Pres,oent. J Consondated Edison Company of New York, Inc. 4 Irving Place, New York. NY 10003 Telepnone (212) 460-2533 November 15, 1984 Re: Indian Point Unit No. 2 Docket No. 50-247 Mr. William G. Mcdonald, Director Office of Management Information and Program control c/o Distribution Services Branch, DDC, ADM U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Dear Mr. Mcdonald s Enclosed you will find two copies of the Monthly Operating Report for Indian Point Unit No. 2 for the month of October 1984. trulyyourg, Ve a Encl. cc Mr. Richard DeYoung, Director (40 copies) Office of Inspection and Enforcement c/o Distribution Services Branch, DDC, ADM U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Dr. Thomas E. Murley, Regional Administrator Region I U.S. Nuclear Regulatory Commission 631 Park Ave. King of Prussia, Pa. 19406 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 38 Buchanan, New York 10511 6 4 _}}