Forwards Special Repts for Two Valid Esg Test Failures
ML20099L747
Person / Time
Site: Limerick  
Issue date: 12/28/1995
From: Boyce R
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20099L751 List:
References
NUDOCS 9601020291
Download: ML20099L747 (2)


Text

.

.=

Robert W. Ccyce 4.

Plant Manager 3

Limerick Generating Station PECO ENERGY.

if32";gTg"Ln PO Box 2300.

Sanatoga, PA 19464-0920 215 3271200 ExL 2000 t

T.S.'6.9.2 December 28, 1995 Docket Nos. 50-352-50 353 License Nos. NPF-39 NPF-85 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

Limerick Generating Station, Units 1 and 2 Special Reports for Two Valid Emergency Diedel Generator Test Failures

REFERENCE:

Technical Specifications Sections 4.8.1.1.3 and 6.9.2 Attached are two Special Reports being submitted pursuant to the requirements of Technical Specifications (TS) Section 6.9.2 as required by TS Surveillance Requirement 4.8.1.1.3.

TS Surveillance Requirement 4.8.1.1.3 requires reporting of all diesel generator failures, whether valid or non-valid, within 30 days.

The reports are required to include the information recommended in Regulatory Position ~ C.3.b of Regulatory Guide (RG) 1.108, " Periodic Testing of Diesel' Generator Units as On-site Electric Power Systems at Nuclear Power Plants," Revision 1, August 1977.

-Attachments 1 and 2 provide our responses to the valid failures of the Unit 1 D14 Emergency Diesel Generator (EDG) and the Unit 2 D21 EDG respectively.

Both EDG failures resulted from crankcase pressurization transients.

If there are any questions, please do not hesitate to contact Mr.

James'L. Kantner at (610) 718-3400.

Very truly yours, N

SMM\\DMS

. Attachments

.cc:

T..T. Martin, Administrator-Region I, USNRC (w/ attachments) lN. S.-Perry, USNRC Senior Resident Inspector, LGS

(")

9601020291 951228-gDR ADOCK 05000352

/'7 4

-PDR.

UMUU uu,

4

+

k

' December 28 1995

- Page 2 i

bec: 'D.'M. Smith-

-.63C-3 D. Fetters - 63C-3 W. G. MacFarland

.SMB1-1 M.-P.-Gallagher - SSB3-1 J. L.. Kantner - SMB3-1 G'.- A. Hunger /NRB

'63C-5 J.

B. Cotton 53A-1 a-C. A. Mengerr - SSB4-3 C. B.-~Anders - SMB3 '

. Commitment Coordinator - 62A-1 DER.BRP Inspector SMB3-1

. Correspondence Release Point - SMB1-2 1

.i 4

1 4

7' i

w