'o Pubhc Service Electric and Gas Company Louis F. Storz Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-5700 Senor Vce President Nuclear Operatons LR-N95255 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
HOPE CREEK GENERATING STATION FACILITY OPERATING LICENSE NPF-57 DOCKET NO. 50-354 EXTENSION OF CORRECTIVE ACTION COMPLETION DATE Due to the augmentation of Hope Creek's sixth refueling outage scope, a corrective action completion date is being extended as indicated in Attachment 1 of this letter.
These corrective actions are associated with a Notice of Violation response for j
NRC Inspection Report No. 50-354/95-10.
Should you have any questions or comments on this transmittal, do not hesitate to contact us.
Sincerely, 0W
/EA bevos f Srch'?-
Attachment 9601020248 951228 PDR ADOCK 05000354 G
pyg U201gp r
g e,,nieoon i
-.... ~ -.
-... - ~. - -. -..
s I
s Document Control Desk DEC 2 81995 LR-N95255 C
Mr.
T. T. Martin, Administrator - Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King'of Prussia, PA 19406 Mr. D.
Jaffe, Licensing Project Manager - Hope Creek U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 14E21 11555 Rockville Pike Rockville, MD 20852 Mr. R. Summers USNRC Senior Resident Inspector (SO9)
Mr. K. Tosch, Manager, IV Bureau of Nuclear Engineering 33 Arctic Parkway CN 415 Trenton, NJ 08625 s
95-4913
u.. <
ATTACHMENT 1 Violation Response for Inspection Report No. 354/95-10:
Submitted to the NRC via PSE&G letter LR-N95139, dated September 11, 1995.
The completion dated for corrective action II.A.2.iv.a is being extended from December 31, 1995 to the end of the current refueling outage.
This corrective action concerns the implementation of Hiller-actuated valve modifications described in the violation response.
-