Interim Deficiency Rept DER 84-06 Re Defects in Absolute & Deviation Alarm Modules Supplied by Foxboro.Initially Reported on 840216.Due to Extensive Investigation & Evaluation Required,Final Rept Delayed Until 841130
ML20099L538
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 11/16/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-31164-TDS, DER-84-06, DER-84-6, NUDOCS 8412010164
Download: ML20099L538 (1)


Text

-

n r

Arizona Nuclear Power Project h (17 l 9 % l: lg P.O. BOX 5?034 e PHOENIX, ARIZONA 85072-2034 November 16,1984!Gigg p e ANPP-31164-TDS /TRB U. S. Nuclear Regulatory Commission Region V 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention: Mr. D. F. Kirsch Time Extension For Report - DER 84-06

Subject:

A 50.55(e) Potentially Reportable Deficiency Relating To Possible Deficiencies In Absolute And Deviation Alarm Modules Supplied By Foxboro.

File: 84-019-026; D.4.33.2 (A) Telephone conversation between P. Narbut and T. Bradish on

Reference:

February 16, 1984 (B) ANPP-29030, dated March 9,1984 (Interim Report)

(C) ANPP-29665, dated June 5,1984 (Time Extension)

(D) ANPP-30305, dated August 23, 1984 (Time Extension)

(E) ANPP-30563, dated September 19, 1984 (Time Extension)

(F) ANPP-31011, dated October 30, 1984 (Time Extension)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), an Interim Report was transmitted by Reference (B),

and Time Extensions were requested by References (C), (D), (E), and (F).

it was estimated that a Final Report would be available by At that time, November 16, 1984 Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by November 30,1984, at which time a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very tru17your,

~

EE.6 J E. E. Van Brunt, Jr.

APS Vice President Nuclear Production ANPP Project Director EEVB/TRB/nj cc: See Page Two 8412010164 841116 1 0 PDR ADOCK 05000528 S

PDR EW

I 4

p.

4 J

f v

' Mr. D. F. Kirsch DER 84-06

' Page.Two ec:

Richard DeYoung,' Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 T. G. Woods, Jr.

D.. B. Karne r W. E. Ide D.

.. Fasnacht A. C. Rogers L. A. Souza D. E. Fowler T. D. Shriver C. N. Russo B. S. Kaplan J. R. Bynum J. M. Allen

~

A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson R. P. Zimmerman L. Clyde M. Woods T. J. Bloom Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, GA 30339 i.

r 1

O e

.* -