Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20113E054 + (05:16:47, 13 December 2024)
- ML20113E051 + (05:16:48, 13 December 2024)
- ML20113E049 + (05:16:49, 13 December 2024)
- ML20113E047 + (05:16:50, 13 December 2024)
- ML20113E045 + (05:16:50, 13 December 2024)
- ML20113E044 + (05:16:51, 13 December 2024)
- ML20113E027 + (05:16:51, 13 December 2024)
- ML20113E024 + (05:16:52, 13 December 2024)
- ML20113E019 + (05:16:53, 13 December 2024)
- ML20113E013 + (05:16:53, 13 December 2024)
- ML20113E011 + (05:16:54, 13 December 2024)
- ML20113D983 + (05:16:55, 13 December 2024)
- 05000373/LER-1985-009, :on 850122,no Assigned Calibr or Functional Test Procedure for Calibr RHR Shutdown Cooling Suction Pressure Switch.Caused by Improper Identification on Tech Spec Surveillance Matrix.Procedure Drafted + (05:16:56, 13 December 2024)
- ML20113D980 + (05:16:58, 13 December 2024)
- ML20113D972 + (05:16:59, 13 December 2024)
- ML20113D960 + (05:16:59, 13 December 2024)
- ML20113D950 + (05:17:00, 13 December 2024)
- ML20113D945 + (05:17:01, 13 December 2024)
- ML20113D949 + (05:17:01, 13 December 2024)
- ML20113D939 + (05:17:02, 13 December 2024)
- ML20113D937 + (05:17:03, 13 December 2024)
- ML20113D931 + (05:17:06, 13 December 2024)
- ML20113D925 + (05:17:07, 13 December 2024)
- RBG-19-890, Forwards Draft Status of Const Completion & Testing Items to Be Completed After Fuel Load.Areas Include Normal Cooling Water,Solid Radwaste Sys,Fuel Bldg Sampling Sys, Elevators & Safe/Alternate Shutdown (SER Issue 3) + (05:17:08, 13 December 2024)
- ML20113D915 + (05:17:08, 13 December 2024)
- ML20113D863 + (05:17:09, 13 December 2024)
- ML20113D833 + (05:17:10, 13 December 2024)
- ML20113D849 + (05:17:10, 13 December 2024)
- ML20113D823 + (05:17:11, 13 December 2024)
- ML20113D814 + (05:17:12, 13 December 2024)
- ML20113D816 + (05:17:12, 13 December 2024)
- ML20113D807 + (05:17:13, 13 December 2024)
- ML20113D806 + (05:17:14, 13 December 2024)
- ML20113D802 + (05:17:15, 13 December 2024)
- ML20113D801 + (05:17:16, 13 December 2024)
- ML20113D783 + (05:17:18, 13 December 2024)
- ML20113D786 + (05:17:18, 13 December 2024)
- ML20113D773 + (05:17:19, 13 December 2024)
- ML20113D777 + (05:17:19, 13 December 2024)
- ML20113D768 + (05:17:20, 13 December 2024)
- ML20113D767 + (05:17:23, 13 December 2024)
- W3P84-3236, Responds to NRC Re Violations Noted in Insp Rept 50-382/84-39.Corrective Actions:Condition Identification & Work Authorization (Ciwa) 008402 Removed from Control Room Ciwa Files + (05:17:24, 13 December 2024)
- ML20113D760 + (05:17:24, 13 December 2024)
- ML20113D732 + (05:17:25, 13 December 2024)
- L-85-109, Responds to Violations Noted in Insp Repts 50-250/84-39 & 50-251/84-40.Corrective Actions:Operating Procedure 7304.1 Re Periodic Test of Auxiliary Feedwater Sys & Tech Spec 3.8 Revised to Clarify Limiting Conditions for Operation + (05:17:26, 13 December 2024)
- ML20113D719 + (05:17:26, 13 December 2024)
- ML20113D710 + (05:17:27, 13 December 2024)
- ML20113D706 + (05:17:28, 13 December 2024)
- ML20113D701 + (05:17:28, 13 December 2024)
- ML20113D697 + (05:17:29, 13 December 2024)
- ML20113D695 + (05:17:30, 13 December 2024)
- ML20113D696 + (05:17:30, 13 December 2024)