ML20113D783

From kanterella
Jump to navigation Jump to search
Forwards Changes to Final Draft Version of Tech Specs Discussed During 850117 Meeting
ML20113D783
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 01/18/1985
From: Petrick N
STANDARDIZED NUCLEAR UNIT POWER PLANT SYSTEM
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20113D788 List:
References
SLNRC-85-2, NUDOCS 8501230232
Download: ML20113D783 (1)


Text

d i

SNUPPS Standardized Nuclear Unit Power Plant System 5 Choke Cherry Road Nicholas A. Petrick R ville rytend 20850 Executive Director January 18, 1985 SLNRC 85-2 FILE: 0543 SUBJ: Wolf Creek Technical Specifications 0lMr. Harold R. Denton, Director l

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Comission Washington, D.C.

20555 Docket No. STN 50-482

(

Refs:

1) KGE (G. L. Koester) letter to NRC (H. R. Denton), dated 12/10/84, Same Subject
2) NRC (D. G. Eisenhut) letter to KGE (G. L. Koester), dated 11/7/84, Same Subject

Dear Mr. Denton:

Referance 1 forwarded KGE's comments on the Final Draft version of Wolf Creek's Technical Specifications as issued by reference 2.

Since reference 1, several other changes have been identified which are forwarded with this letter.

These changes were discussed with members of your staff during meetings on January 17, 1985.

Very truly yours,

\\<ku Nicholas A. Petric(k JHR/bds/6a4 Attachments cc:

G. L. Koester KGE J. M. Evans KCPL D. F. Schnell UE J. Neisler/B. Little USNRC/ CAL pI H. Bundy USNRC/WC 0

W. L. Forney USNPC/RIII 8

D. R. Hunter USNRC/RIV j

8501230232 850118 PDR ADOCK 05000482 A

PDR

_ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _