Final Deficiency Repts NCR 2975 & NCR 3063 Re Receipt Insps W/O Verification of Corrections.Intially Reported on 840328.All Inspectors Involved Retrained & Tested.Qc Procedure 1.1, Receiving Insp, Revised
ML20113E045
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 03/11/1985
From: Hufham J
TENNESSEE VALLEY AUTHORITY
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NCR-2975, NCR-3063, NUDOCS 8504160153
Download: ML20113E045 (2)


Text

~

TENNESSEE VALLEY AUTHORITY 3

$0"Ches$NhStreeYYowerYI

^"

5 g g P 2

  • 48 March 11,1985

~_

BLRD-50-438/84-27; BLRD-50-439/84-26 U.S. Nuclear Regulatory Commission Region II Attn:

Dr. J. Nelson Grace, Regional Administrator 101~Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Dese Dr. Grace:

BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - DEFICIENCIES IN RECEIPT INSPECTION BLRD-50-438/84-27, BLRD-50-439/84 FINAL REPORT The subject deficiency was initially reported to NRC-0IE Inspector P. E. Fredrickson on March 28, 1984 in accordance with 10 CFR 50.55(e) as NCR 2975. A similar deficiency was later documented and reported to inspector D. M. Vercelli on April 17, 1984 as NCR 3063 This was followed by our interim report dated April 25 and September 4 1984. Enclosed is our final report on both' NCRs.

If you have any questions, please get in touch with R. H. Shell at FTS 858-2688.

Very truly yours, TENNESSEE VALLEY AUTHORITY 1

. W. Hufh N N M Loensing an Regulations Enclosure V

cc:

Mr. James Taylor, Director (Enclosure)

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Records Center (Enclosure)

Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 8504160153 850311 PDR ADOCK 05000430 g

PDR fsg

-., o,_ g,,,,

ENCLOSURE

/

BELLEFONTE NUCLEAR PLANTS UNITS 1 AND 2 DEFICIENCIES IN RECEIPT INSPECTION BLRD-50-438/84-27, BLRD-50-439/84-26 NCR 2975 AND 3063 10 CFR 50.55(e)

FINAL INTERIM REPORT Description of Deficiency NCR 2975 TVA's Quality Engineering Branch (QEB) released contracts with open deficiency reports, and receiving inspectors accepted material without verification of corrections or initiating a nonconformance report (NCR).

Also, receiving inspectors failed to perform required inspections or document such inspections. The cause of this deficiency was inadequate training of

+

the inspection personnel.

NCR 3063 The deficiencies described in NCR 2975 pertain to QEB-related contracts. The deficiencies in this NCR pertain to other contracts for which Bellefonte Nuclear Plant (BLN) site personnel have receipt inspection responsibility.

The deficiencies described in both NCRs are the same in nature.

Safety Implications Due to the deficiencies described above, it -is possible to have defective equipment installed and used in safety-related systems whose failure to perform its safety function would adversely affect the safety of the plant.

Corrective Action A review of receiving inspection checklists (RICs) that required source inspection has been completed. TVA's Office of Construction (OC) is verifying that site inspections were performed as required by QEB instructions for site inspections. A list of discrepancies that originated from the review has been categorized referencing material / equipment and the contract number. The discrepancies found have been evaluated and all corrective actions have been completed according to site procedures.

To prevent recurrence of this deficiency, all inspectors in rolved in receiving inspection were retrained and tested by supervisory personnel to assure adequate comprehension of the receiving inspection function.

In addition, BLN quality control procedure (QCP) 1.1, " Receiving Inspection,"

has undergone two major revisions to be more explicit for receipt inspection and inspection personnel.

~