Requests 830708 Confirmatory Order Re Existing Cracks in Recirculation Sys Pipe Welds Be Rescinded.Recirculation Sys Piping Replaced,Negating Need for Provisions of Order
ML20113D732
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 01/10/1985
From: Gucwa L
GEORGIA POWER CO.
To: Stolz J
Office of Nuclear Reactor Regulation
References
1338N, NED-85-014, NED-85-14, TAC-57339, NUDOCS 8501230210
Download: ML20113D732 (2)


Text

.

~

Georgia Power Company W

333 Piedmont Avenue -

Atlanta, Georgia 30308 Telephone 404 5264526 Mailing Address:

Post Of hce Box 4545 Avanta. Georgia 30302 Georgia Power t.. T. Gucwa the sout%m electnc system Managet Nuclear Engineenng and Chief Nuclear Eng;neer NED-85-014 1338N January 10, 1985 Director of Nuclear Reactor Regulation

. Attention:

Mr.. John F. Stolz, Chief Operating Reactors Branch No. 4 Division of Licensing U. S. Nuclear Regulatory Commission

-Washington, D. C.

20555 NRC' DOCKET 50-366 OPERATING LICENSE.NPF-5 EDWIN-I. HATCH NUCLEAR PLANT. UNIT-2 RECmCULATION SYSTEM PIPING CONFIRMATORY ORDER

' Gentlemen:

The Nuclear 1 Regulatory Commission (NRC) on July 8, -1983, issued.a Confirmatory' Order which required augmentation. of reactor _ coolant leak

' detection because - of then - existing cracks L in' certain Plant ; Hatch ' Unit 2 recirculation. system pipe welds.

The subject piping has since been replaced, thereby eliminating the welds -in question' and negating the need for the_ provisions of that order.

Georgia Power Company (GPC) hereby

. requests that ycu, therefore, rescind the July 8; 1983 Confirmatory Order.

The augmented: leak detection was proposed by GPC-in 'our letters NED-83-322, NED-83-332, and NED-83-341 dated May 25, 1983, June 2, 1983, and June 8,1983, respectively, as part of corrective.and. compensatory actions to permit ~ plant - operations with known pipe flaws for an -interim period.

During the last scheduled outage for~ Plant Hatch Unit 2, the recirculation

system piping and certain other. piping were replaced due'to the finding of a number-of-unacceptable flaws (i.e.,,intergranular stress corrosion cracking).

The actions Lwe have taken in - this regard. were reported and discussed on several occasions with members of.the NRC staff; y

~

V}0 y ~ b210 850110*'***?M c

8501 is

~

i

,s Georgia Power k

. Director.'of Nuclear Reactor Regulation U. S.. Nuclear Regulatory Commission l

Washington, D. C.

20555 January 10, 1985

-P. age 2

. Since we have replaced all the Hatch 2 flawed piping as of restart of that unit in September 1984 and since our commitments were made and the NRC

Confirmatory Order was issued based on the presence of detectable flaws in the original piping, we have determined that continued augmented reactor coolant-leakage limits and surveillance requirements, beyond those existing in the Tech'nical Specifications, are unnecessary.

Hence, we request that

.you-rescind the July 8, 1983 confirmatory order.

Yours very truly, c/' C d(b -

L. T. Gucwa LTG/mb xc:

H. C.~ Nix, Jr.

l

'J. P. O'Reilly-(NRC-Region II)

Senior Resident Inspector-t

(

u' W '

'g.

.,h trans