Forwards Final Evacuation Time Estimates for Clinton Power Station Plume Exposure Pathway Emergency Planning Zone. Estimates Revised to Reflect Comments Received from State & Local Agencies
ML20113D773
Person / Time
Site: Clinton Constellation icon.png
Issue date: 01/18/1985
From: Spangenberg F
ILLINOIS POWER CO.
To: Schwencer A
Office of Nuclear Reactor Regulation
Shared Package
ML20113D779 List:
References
U-0789, U-789, NUDOCS 8501230228
Download: ML20113D773 (1)


Text

--

U- 0789 054-84 01-18 )L 1A.120

\

ILLINDIS POWER 00MPANY IP CLINToN POWER STATION. P.o. BOX 678. CLINToN. ILLINOIS 61727 January 18, 1985 Docket No. 50-461 Director of Nuclear Reactor Regulation Attention: Mr. A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Subj ect: Clinton Power Station Unit 1 Clinton Power Station Evacuation Time Estimates

Dear Mr. Schwencer:

Enclosed are 10 copics of the final " Evacuation Time Estimates for the Clinton Power Station Plume Exposure Pathway Emergency Planning Zone" dated December 1984. These evacuation time estimates have been revised to reflect comments received from state and local agencies.

Sin er yours, t , www -

F. A. . pang berg i Director - Nuclear Licensing and Configuration Nuclear Station Engineering TLG/cm cc: B.L. Siegel, NRC Clinton Licensing Project Manager D. Rohrer, Division of Emergency Preparedness and Engineering Responses NRC Resident Office Regional Administrator, Region III USNRC Illinois Department of Nuclear Safety Enclosures F

DR 0 k1 pop ai