Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20115F255 + (04:21:12, 13 December 2024)
- ML20115F247 + (04:21:13, 13 December 2024)
- 05000301/LER-1992-003-02, :on 920918,abnormal Noise Heard Emanating from Containment Spray Pump P-14A During Test IT-06 Due to Pump Impeller Being Blocked.Pump Disassembled & Foam Rubber Plug Removed.Pump Reassembled & Declared Operable + (04:21:20, 13 December 2024)
- ML20115F239 + (04:21:22, 13 December 2024)
- ML20115F244 + (04:21:22, 13 December 2024)
- ML20115F237 + (04:21:23, 13 December 2024)
- ML20115F229 + (04:21:24, 13 December 2024)
- ML20115F228 + (04:21:24, 13 December 2024)
- ML20115F227 + (04:21:25, 13 December 2024)
- ML20115F214 + (04:21:26, 13 December 2024)
- ML20115F221 + (04:21:26, 13 December 2024)
- L-85-155, Responds to Notice of Violation & Proposed Imposition of Civil Penalty Identified in Insp Repts 50-250/84-29 & 50-251/84-30.Corrective Actions:Min Equipment List Posted at Each Operating Station + (04:21:27, 13 December 2024)
- ML20115F178 + (04:21:28, 13 December 2024)
- ML20115F191 + (04:21:28, 13 December 2024)
- ML20115F167 + (04:21:29, 13 December 2024)
- ML20115F159 + (04:21:30, 13 December 2024)
- ML20115F144 + (04:21:31, 13 December 2024)
- ML20115F140 + (04:21:32, 13 December 2024)
- ML20115F143 + (04:21:32, 13 December 2024)
- ML20115F139 + (04:21:33, 13 December 2024)
- ML20115F131 + (04:21:34, 13 December 2024)
- ML20115F125 + (04:21:34, 13 December 2024)
- ML20115F121 + (04:21:35, 13 December 2024)
- ST-HL-AE-1232, Forwards Colorado River Entrainment & Impingement Monitoring Program Phase Two Studies - Jul-Dec 1984, Rept 2.Rept Describes Progress of Entrainment & Impingement Programs During Cooling Reservoir Filling Operations + (04:21:35, 13 December 2024)
- RBG-20643, Informs of Delay in Submission of Addl Info Re IE Bulletin 84-02,per Util 850201 Commitment.Interim or Final Status Rept Will Be Submitted by 850531,upon Obtaining List of Hfa Relays Discussed in + (04:21:36, 13 December 2024)
- ML20115F115 + (04:21:37, 13 December 2024)
- ML20115F110 + (04:21:38, 13 December 2024)
- ML20115F111 + (04:21:38, 13 December 2024)
- ML20115F104 + (04:21:40, 13 December 2024)
- ML20115F103 + (04:21:41, 13 December 2024)
- ML20115F099 + (04:21:42, 13 December 2024)
- ML20115F102 + (04:21:42, 13 December 2024)
- 05000293/LER-1992-012, :on 920916,noted That Recirculation Flow Converters May Not Have Been Calibr During Period 900724- 920916.Caused by Personnel Error.Recirculation Flow Converters Calibr Completed on 920916 + (04:21:49, 13 December 2024)
- ML20115F062 + (04:21:51, 13 December 2024)
- ML20115F047 + (04:21:52, 13 December 2024)
- 05000289/LER-1992-002-01, :on 920918,reactor Tripped as Result of Inadequate Review for Removal of Circulation Water Pump Trip on High Condenser Inlet Water Box Pressure.Procedures Will Be Revised to Provide Addl Guidance + (04:21:58, 13 December 2024)
- ML20115F042 + (04:21:59, 13 December 2024)
- ML20115F030 + (04:22:00, 13 December 2024)
- ML20115F024 + (04:22:01, 13 December 2024)
- ML20115F011 + (04:22:02, 13 December 2024)
- 05000324/LER-1992-005, :on 920528,MCC 2-2XB-2 Declared Inoperable Due to Seismic Support & Anchorage Deficiencies.Root Cause Analysis in Progress.Subj MCC Repaired & Engineering Evaluation Procedure ENP-12 Will Be Revised + (04:22:08, 13 December 2024)
- ML20115E999 + (04:22:09, 13 December 2024)
- ML20115E995 + (04:22:10, 13 December 2024)
- ML20115E982 + (04:22:11, 13 December 2024)
- ML20115E974 + (04:22:11, 13 December 2024)
- ML20115E973 + (04:22:12, 13 December 2024)
- JAFP-96-0275, Monthly Operating Rept for June 1996 for Ja FitzPatrick Nuclear Power Plant + (04:22:13, 13 December 2024)
- ML20115E971 + (04:22:13, 13 December 2024)
- 3F0485-05, Forwards Rev 4 to Modified Amended Security Plan.Rev Withheld (Ref 10CFR73.21) + (04:22:14, 13 December 2024)
- 1CAN048503, Discusses Inspectability of Sleeved once-through Steam Generator Tubes,Per 850228 Request.Addl Time Necessary for Complete Response.Info Will Be Provided by 850510 + (04:22:15, 13 December 2024)
- ST-HL-AE-5425, Submits Change to Distribution List for Transmittals Re Facility + (04:22:15, 13 December 2024)
- ML20115E915 + (04:22:16, 13 December 2024)