Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20154D068 + (06:20:24, 11 December 2024)
- ML20154D066 + (06:20:24, 11 December 2024)
- ML20154D063 + (06:20:25, 11 December 2024)
- IR 05000193/1988001 + (06:20:28, 11 December 2024)
- ML20154D060 + (06:20:29, 11 December 2024)
- ML20154D061 + (06:20:29, 11 December 2024)
- ML20154D059 + (06:20:30, 11 December 2024)
- ML20154D053 + (06:20:31, 11 December 2024)
- ML20154D057 + (06:20:31, 11 December 2024)
- ML20154D051 + (06:20:32, 11 December 2024)
- ML20154D049 + (06:20:33, 11 December 2024)
- ML20154D047 + (06:20:33, 11 December 2024)
- ML20154D043 + (06:20:34, 11 December 2024)
- ML20154D041 + (06:20:35, 11 December 2024)
- ML20154D040 + (06:20:35, 11 December 2024)
- ML20154D036 + (06:20:36, 11 December 2024)
- ML20154D039 + (06:20:36, 11 December 2024)
- ML20154D035 + (06:20:38, 11 December 2024)
- ML20154D033 + (06:20:38, 11 December 2024)
- ML20154D028 + (06:20:39, 11 December 2024)
- ML20154D030 + (06:20:39, 11 December 2024)
- ML20154D023 + (06:20:41, 11 December 2024)
- ML20154D024 + (06:20:41, 11 December 2024)
- 05000328/LER-1998-001-05, :on 980827,turbine Trip Occurred Followed by Reactor Trip.Caused by Failure of Sudden Pressure Relay on B Phase Main Transformer.Control Room Operators Responded & Removed,Inspected & Replaced Failed Relays + (06:20:43, 11 December 2024)
- ML20154D016 + (06:20:44, 11 December 2024)
- 05000328/LER-1998-001, Forwards LER 98-001-00 Providing Details Re Automatic Turbine & Reactor Trip Due to Failure of Sudden Pressure Relay on B Phase Main Transformer + (06:20:46, 11 December 2024)
- W3P88-1285, Forwards Rept, Actions Completed by Louisianna Power & Light in Response to NRC Bulletin 88-005, in Response to Bulletin Re Piping Supplies,Inc & West Jersey Mfg Co Matls + (06:20:48, 11 December 2024)
- ML20154D013 + (06:20:48, 11 December 2024)
- ML20154D010 + (06:20:49, 11 December 2024)
- 05000414/LER-1988-015-01, :on 880405,steam Generator 2C Blowdown Containment Outside Isolation Valve Not Retested Following Repair Violating Tech Specs.Caused by Personnel Error.Valve Declared Inoperable Pending Retest + (06:20:50, 11 December 2024)
- ML20154D001 + (06:20:52, 11 December 2024)
- ML20154C998 + (06:20:52, 11 December 2024)
- ML20154C997 + (06:20:53, 11 December 2024)
- ML20154C994 + (06:20:54, 11 December 2024)
- ML20154C993 + (06:20:54, 11 December 2024)
- SNRC-1460, Responds to NRC 880407 Request for Addl Info Re IE Bulletin 85-003,Suppl 1.Requested Rev to Table 1A Will Be Sent Under Separate Cover within 90 Days After BWR Owners Group Reevaluation of Valve Differential Pressures + (06:20:55, 11 December 2024)
- ML20154C990 + (06:20:56, 11 December 2024)
- ML20154C991 + (06:20:56, 11 December 2024)
- ML20154C987 + (06:20:57, 11 December 2024)
- ML20154C989 + (06:20:57, 11 December 2024)
- IR 05000456/1984044 + (06:20:58, 11 December 2024)
- ML20154C985 + (06:20:59, 11 December 2024)
- ML20154C984 + (06:20:59, 11 December 2024)
- 05000271/LER-1986-002, :on 860128,Viton & Teflon Components in Containment Hydrogen/Oxygen Analyzer Internal Parts Could Not Survive Design Basis LOCA Exposure for Environ Qualification.Caused by Calculation Error + (06:21:01, 11 December 2024)
- RBG-28760, Forwards Rev 3 to Inservice Insp Plan-First Interval, in Response to Generic Ltrs 88-01 & 88-03 + (06:21:03, 11 December 2024)
- ML20154C976 + (06:21:03, 11 December 2024)
- ML20154C974 + (06:21:04, 11 December 2024)
- ML20154C975 + (06:21:04, 11 December 2024)
- ML20154C971 + (06:21:05, 11 December 2024)
- ML20154C969 + (06:21:06, 11 December 2024)
- ML20154C970 + (06:21:06, 11 December 2024)
- ML20154C965 + (06:21:07, 11 December 2024)