Forwards Insp Repts 50-338/85-28 & 50-339/85-28 on 851028-1101 & Notice of Violation.Civil Penalty Not Proposed Due to Extensive Corrective Actions & Prior Good Performance
ML20154D047
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 02/21/1986
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML20154D050 List:
References
EA-86-011, EA-86-11, NUDOCS 8603050478
Download: ML20154D047 (2)


See also: IR 05000338/1985028

Text

{{#Wiki_filter:_

         .
      .
             -
           .
    *
                                                    FEB 211986                                       l
           Docket Nos. 50-338 and 50-339
           License Nos. NFP-4 and NPF-7
           EA 86-11
           Virginia Electric and Power Company
         4TTN: Mr. W. L. Stewart, Vice President,

, '

                     Nuclear Operations
           P. O. Box 26666
           Richmond, VA 23261
           Gentlemen:
           SUBJECT:   NOTICE OF VIOLATION
                      (NRC INSPECTION REPORT NOS. 50-338/85-28 AND 50-339/85-28)
           This refers to the inspection conducted at the North Anna facility of activities
           authorized by NRC Operating License Nos. NPF-4 and NPF-7 on October 28 through
           November 1, 1985.    The findings were discussed with those members of your staff
           identified in the enclosed inspection report and at the enforcement conference
           held in the NRC Region II Office on December 18, 1985.
           The violations involve the service water intake structure for Units 3 and 4

l which when completed will also be used as a backup to the Unit 1 and 2 Service

Water Systems. The first Category I concrete pour took place on June 17, 1985.

l The NRC conducted a routine inspection of construction activities on October 28

           through November 1, 1985, and identified several deficiencies in the quality
assurance program for testing of soil compaction and concrete used in modifications

! of the service water intake structure. The root cause of these deficiencies

           appears to have been a lack of management involvement and control of the quality
           assurance program.

, In accordance with the " General Statement of Policy and Procedure for NRC '

           Enforcement Actions," 10 CFR Part 2, Appendix C (1985), the violations                    '
           described in the enclosed Notice have collectively been categorized in

i the aggregate as a Severity Level III problem. Normally, a civil penalty l is considered for a Severity Level III problem. However, after consultation

           with the Of rector, Office of Inspection and Enforcement, I have decided that

i a civil penalty will not be proposed in this case due to your extensive

           corrective actions and prior good performance.

l You are required to respond to this letter and should follow the instructions ' l specified in the enclosed Notice when preparing your response. In your response, l l you should document the specific actions taken and any additional actions you l

plan to prevent recurrence. After reviewing your response to this Notice, <
           including your proposed corrective actions, the NRC will determine whether

! further NRC enforcement action is necessary to ensure compliance with NRC

           regulatory requirements.
           CERTIFIED MAIL
           RETURN RECEIPT REQUESTED
                     8603050478 86022130
                                                                                   *
                                                                                           n
                            ADOCK 050
                     gDR
                                                  .                             ..    .

\ u__ _____ ZEot

                                                                                     -
                    p~.w a .         ,             g .,           p             (              y.,    l
            -
 ,
          *

.

                . py, o y
     Virginia Electric and Power Company                -3-                  f{gg y         gg
     bec w/encis:
   vitRC Restdent inspector
     PDR
   JECY
    TA
   eJTaylor, EC
   ,RVollmer, 1E
    sJAAxelrad. IE
    JPoindexter. IE
   WLieberman. ELD
   ,,FIngram, PA
      JMGrace, RII
      Enforcement Coordinators /
          RI. RII. RIII, RIV, RIV
    ,GEdles, CIA
      BHayes. 01
    E)enton, NRR
     ,JCrooks, AE00
   .EJordan. IE
     -JPartlow. IE
    *BGrimes. IE
      Resident Inspector
      Project N nager, MRR
       IE:EA
        [E:ES
      E00 ROG File
      DCS
      Comonwalth of Virginia
                                                                                                   b*
                                                                                          /
                 _
         RIL                 RI g
                                                        7
                                g                (
         AEG son          t G1         s     RNal er                                                  )
                             2/2c/86         2/X /86
         2/[[/86
        IE                               9kARIT[
                                                W+[                 3
                                                                               (1, 1
                   ter       L'   -
                                                           xe rad       leer    )
        2/jyB6              2/            2/f /86 race
                                          JNG[           g/B6       2p/86       [[ ff)86 lor
                                                                      1
      .

}}