Mr. Jrmis M. Taggtrt October 2, 1998 194 Int:;t AvInus Minihawkin, NJ 08050
Dear Mr. Taggert:
I have been asked to respond to your letter to the New Jersey Board of Public Utilities, dated August 28,1998, regarding the possible closure of Oyster Creek Nuclear Generating Station (OCNGS) and the possible impact that closure may have on the economy of the community.
Primarily because of the established economic regulatory process, the U.S. Nuclear Regulatory Commission (NRC) has exercised limited financial oversight of electric utility licensees. The electric industry's move away from traditional rate-based regulation toward increased competition in a deregulated marketplace could have an adverse impact on the long-term ability of utilities to adequately finance safe operation and decommissioning of their nuclear power plants.
Although the NRC is not usually involved in economic or rate regulation, over the years the agency has recognized a possible relationship between adequate financing and safe operations, i
Licensees' efforts to reduce spending could result in smaller, less-experienced workforces; i
reductions in maintenance and capital budgets; shorter refueling outages, during which certain maintenance is performed; and a decline in training resources. The NRC must ensure that economic pressures do not result in reduced safety margins at opceting nuclear plants and do not impair a licensee's ability to fully finance decommissioning at a plant after it is shut down.
It also should be noted that the staff has historically not found a strong correlation between levels of operation and maintenance (O&M) and capital additions expenditure and measures of safety performance. Many plants have increased capacity factors and reduced O&M costs and continue to demonstrate excellent safety performance. The NRC will continue to monitor OCNGS through the inspection process and other plant performance indicators used to assess j
safe plant operation.
With respect to some other issues you raised, and as indicated by your 9th District representatives in a letter to you dated August 31,1998, there is considerable activity at the State level to develop long-term strategies to address the socioeconomic and environmental
. issues surrounding the OCNGS facility.
I hope this letter is responsive to your concems regarding the safe operation of OCNGS until a final decision is made regarding the future operation of the facility.
Sincerely, I
Original signed by 9810070113 981002 O
PDR ADOCK 05000219 Samuel J. Collins, Director H
PDR Office of Nuclear Reactor Regulation g g{ ((
DISTRIBUTION:
See next page DOCUMENT NAME: G:\\ EAT 0N\\g980537.wpd
- SEE PREVIOUS CONCURRENCE To receive a copy of this document, indicate in the box:
"C" - Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N" - No copy 0FFICE PDI 3/PM, I' n l
PDI 3/LA, pn 10 TECH ED*
l PDI-3JD PDI-3/(A p f l
NAME REaton l b '"
TClark
)W RSanders CTdfoes6" /
J3 pot (IT!!kd/
DATE LV 14 /98
'l / 4t /A 09/28/98 9 /- b /98 W3 /98
)
0FFICE ADP/A d"
l MRR//[ U b
l l
l NAME BBoger /'
@ColLIV DATE
/7 / /
/98 f t/ / W /98 OFFICIAL RECORD COPY
- 1 GPU Nuclear Corporation Oyster Creek Nuclear Generating Station ec:
Ernest L. Blake, Jr., Esquire State of New Jersey Shaw, Pittman, Potts & Trowbridge 9th District Legislative Offices 2300 N Street, NW 620 West Lacey Road Washington, DC 20037 Forked River, NJ 08731 Regional Administrator, Region l U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 4
4 BWR Licensing Manager GPU Nuclear Corporation i Upper Pond Road Parsippany, NJ 07054 1
Mayor Lacey Township 4
818 West Lacey Road Forked River, NJ 08731 Licensing Manager i
Oyster Creek Nuclear Generating Statior, Mail Stop: Site Emergency Bldg.
P.O. Box 388 Forked River, NJ 08731 Resident inspector
- c/o U.S. Nuclear Regulatory Commission P.O. Box 445 Forked River, NJ 08731 Kent Tosch, Chief New Jersey Department of Environmental Protection Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625 Mr. Michael B. Roche Vice President and Director GPU Nuclear Corporation Oyster Creek Nuclear Generating Station P. O. Box 388 Forked River, NJ 08731 i
- ;. L' DISTRIBUTION
. Docket F.2(50-219 w/ orig, Inc.)
'PUBLIC (w/inc.) -
PDI-3 w/inc.
LCallan HThompson AThadani-PNorry JBlaha SCollins/FMiraglia BBoger JZwolinski RZimmerman-BSheron JRoe LCox (e-mail LCC)
OGC OPA OCM-SECY #98-0889 NRR Mail Room (EDO#G980589 w/inc.).
NOlson REaton TClark CHehl, R1 MMiller, Rl SBums, OGC RBangart WTravers
. KCyr, OGC
.