ML20154D059

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 880328-31.Violation Noted: Required Fission Density Calculation Not Completed Between 860930 & 870213 or Between 871027 & 880224
ML20154D059
Person / Time
Site: Rhode Island Atomic Energy Commission
Issue date: 05/11/1988
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20154D056 List:
References
50-193-88-01, 50-193-88-1, NUDOCS 8805190034
Download: ML20154D059 (1)


Text

.

APPENDIX A NOTICE OF VIOLATION Rhode Island Atomic Energy Commission Docket No. 50-193 Nuclear Science Center License No. R-95 During NRC inspection from March 28-31, 1988, a violation of NRC requirements was identified.

In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C, that violation is listed be-low:

Technical Specification K.3.e(4)(f)2 requires that the fission density of all fuel elements which have burnup shall be calculated at least quarterly.

Contrary to the above, the required fission density calculation was not com-pleted between 9/30/86 and 2/13/87, or between 10/27/87 and 2/24/88.

This is a Severity level V Violation (Supplement I).

Pursuant to 10 CFR 2.201, Rhode Island Atomic Energy Commission is required to submit to this office, within 30 days of the date of the letter transmitting this Notice, a written reply including: (1) the corrective steps which have been taken and the results achieved, (2) the corrective steps which will be taken to avoid further violations, and (3) the date when full compliance was achieved. Where good cause is shown, consideration will be given to extending the response time.

OFFICIAL RECORD COPY DL50-193/88 0003.0.0 04/14/88 8805190034 880511 PDR ADOCK 05000193 0

DCD

_.