Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20154N340 + (04:46:38, 11 December 2024)
- ML20154N337 + (04:46:39, 11 December 2024)
- ML20154N330 + (04:46:40, 11 December 2024)
- ML20154N327 + (04:46:40, 11 December 2024)
- ML20154N322 + (04:46:41, 11 December 2024)
- ML20154N324 + (04:46:41, 11 December 2024)
- ML20154N320 + (04:46:42, 11 December 2024)
- ML20154N318 + (04:46:42, 11 December 2024)
- ML20154N317 + (04:46:43, 11 December 2024)
- ML20154N316 + (04:46:44, 11 December 2024)
- ML20154N315 + (04:46:44, 11 December 2024)
- 05000440/LER-1988-014, :on 880428,reactor Protection Sys (RPS) Actuation Occurred on Reactor Vessel High Level.Caused by Failure of Contacts to Close in Bypass Relay for RPS Channel A.Relay Replaced & Tested & Old Relay Returned for Analysis + (04:46:46, 11 December 2024)
- 05000483/LER-1988-009, :on 880823,discovered That Excore Neutron Monitoring Sys Power Range Channels Not Surveilled Before Late Finish Time.Caused by Operator Error.Missed Surveillance Completed & Event Reviewed + (04:46:49, 11 December 2024)
- ML20154N311 + (04:46:50, 11 December 2024)
- ML20154N310 + (04:46:50, 11 December 2024)
- ML20154N309 + (04:46:51, 11 December 2024)
- ML20154N307 + (04:46:52, 11 December 2024)
- ML20154N305 + (04:46:52, 11 December 2024)
- IR 05000498/1988037 + (04:46:53, 11 December 2024)
- ML20154N304 + (04:46:53, 11 December 2024)
- ML20154N301 + (04:46:54, 11 December 2024)
- B12015, Forwards Changes to Initial Test Program,Per License Condition 2.C(10).Requirement for Reactor Trip Test at 50% Plateau & Ref to pseudo-ejected Rod Test Deleted & Note to Test 25 Added.Changes Will Be Included in FSAR Amend + (04:46:55, 11 December 2024)
- ML20154N299 + (04:46:56, 11 December 2024)
- ML20154N298 + (04:46:56, 11 December 2024)
- DCL-86-062, Updates 850222 Response to Allegation 1544 Re silver-brazed Fittings on Capillary Sys.Unit 1 Vol Control Tank Level Instrument (LT-112) Upgraded to Design Class 1B.Conclusions from Destructive Exam Apply + (04:46:57, 11 December 2024)
- ML20154N291 + (04:47:00, 11 December 2024)
- ML20154N290 + (04:47:01, 11 December 2024)
- ML20154N288 + (04:47:03, 11 December 2024)
- ML20154N289 + (04:47:03, 11 December 2024)
- ML20154N286 + (04:47:04, 11 December 2024)
- ML20154N284 + (04:47:05, 11 December 2024)
- ML20154N283 + (04:47:06, 11 December 2024)
- IR 05000354/1986002 + (04:47:13, 11 December 2024)
- ML20154N280 + (04:47:13, 11 December 2024)
- HL-5686, Informs That Corrective Actions Relative to Thermo-Lag 330-1 Issues Are Complete + (04:47:14, 11 December 2024)
- ML20154N278 + (04:47:15, 11 December 2024)
- DD-86-02, Advises That Time for Commission to Review DD-86-02 Expired. Commission Declined Review.Decision Became Final Agency Action on 860307.Served on 860313 + (04:47:16, 11 December 2024)
- ML20154N277 + (04:47:16, 11 December 2024)
- ML20154N275 + (04:47:23, 11 December 2024)
- ML20154N272 + (04:47:23, 11 December 2024)
- ML20154N270 + (04:47:24, 11 December 2024)
- ML20154N269 + (04:47:26, 11 December 2024)
- ML20154N268 + (04:47:26, 11 December 2024)
- ML20154N266 + (04:47:27, 11 December 2024)
- ML20154N267 + (04:47:27, 11 December 2024)
- ML20154N265 + (04:47:28, 11 December 2024)
- ML20154N264 + (04:47:28, 11 December 2024)
- ML20154N261 + (04:47:29, 11 December 2024)
- ML20154N260 + (04:47:30, 11 December 2024)
- ML20154N259 + (04:47:31, 11 December 2024)
- 05000259/LER-1988-024-02, :on 880828,refueling Zone Isolation Occurred Due to Rupture of Diaphram Damper Actuator.Preventive Maint Frequency for Secondary Containment Isolation Dampers Will Be Increased to Once Every 24 Months + (04:47:32, 11 December 2024)