Forwards SE Re 10CFR50,App R,Deviation Request for Fire Area 07.Change to Approved Fire Protection Program Does Not Adversely Affect Ability Ot Achieve & Maintain Safe Shutdown in Event of Fire
ML20154N315
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 10/15/1998
From: Alexion T
NRC (Affiliation Not Assigned)
To: Cottle W
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20154N319 List:
References
TAC-M92177, TAC-M92178, NUDOCS 9810210250
Download: ML20154N315 (3)


Text

-.

Mr. Willi m T. Cottb October 15, 1998 President end Chhf Ex:cutivs Officer STP Nuclear Operating Comp:ny South Texas Project Electric Generating Stelion P. O. Box 269 Wadsworth,TX 77483 j

l

SUBJECT:

10 CFR PART 50, APPENDIX R, DEVIATION REQUEST FOR FIRE AREA 07, SOUTH TEXAS PROJECT, UNITS 1 AND 2 (STP)(TAC NOS. M92177 AND M92178) l

Dear Mr. Cottle:

By letter dated September 14,1995 (superseding a letter dated April 13,1995),

supplemented by letters dated November 6,1996, May 22, and August 4,1997, Houston Lighting and Power submitted a request for deviation from its approved fire protection program as it incorporates Section Ill.G.2.c of Appendix R to 10 CFR Part 50 for fire area 07 to the extent that it specifies that an automatic fire suppression system be provided in the area. The request has been adopted by STP Nuclear Operating Company. The Nuclear Regulatory Commission (NRC) staff has reviewed the request and has concluded that the change to the approved fire protection program does not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire and, therefore, require prior approval of the Commission under Paragraph 2.E of the licenses. Our safety evaluation is enclosed.

Sincerely, ORIGINAL SIGNED BY:

'homas W. Alexion, Project Manager Project Directorate IV-1 Division of Reactor Projects lil/IV Office of Nuclear Reactor Regulation hl Docket Nos. 50-498 and 50-499

Enclosure:

As stated cc w/ encl: See next page DISTRIBUTION:

SeekstFileEd PUBLIC PD4-1 r/f TGwynn, RIV OGC SWest EAdensam (EGA1)

JHannon CHawes TAlexion ACRS Document Name: STP92177.LTR

  • SEE PREVIOUS CONCURRENCE /

D/PD4N OFC PM/P,EFGTh LA/PD4-1 OGC*

SUSPLB*

NAME TAlexionfvw Chaw SHom SWest JHakord DATE l0LI/98',b 1/@ /98 10/05/98 10/05/98 ~

Y//

8 0

fYES/hW YES/NO (INS)NO M NO YES/NO COPY U

OFFICIAL RFCORD COPY 3

<a Y h MS@(D fliML. #9t:WZ"! I"'TW f3 U 1F' M iuaiLLJ k di 9810210250 981015 Bf PDR ADOCK 05000498 u

F PDR

~'

~~

j## *4 g

'A UNITED STATES U"

NUCLEAR REGULATORY COMMISSION t

WASHINGTON, D.C. N October 15, 1998 Mr. William T. Cottle President and Chief Executive Officer STP Nuclear Operating Company South Texas Project Electric Generating Station P. O. Box 289 I

Wadsworth, TX 77483

SUBJECT:

10 CFR PART 50, APPENDIX R, DEVIATION REQUEST FOR FIRE AREA 07, SOUTH TEXAS PROJECT, UNITS 1 AND 2 (STP)(TAC NOS. M92177 AND l

M92178)

Dear Mr. Cottle:

By letter dated September 14,1995 (superseding a letter dated April 13,1995),

supplemented by letters dated November 6,1996, May 22, and August 4,1997, Houston Lighting and Power submitted a request for deviation from its approved fire protection program as it incorporates Section Ill.G.2.c of Appendix R to 10 CFR Part 50 for fire area 07 to the extent that it specifies that an automatic fire suppression system be provided in the area. The request has been adopted by STP Nuclear Operating Company. The Nuclear Regulatory Commission (NRC) staff has reviewed the request and has concluded that the change to the

?

approved fire protection program does not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire and, therefore, does not require prior approval of the Commission under Paragraph 2.E of the licenses. Our safety evaluation !s enclosed.

Sincerely, t

Thomas W. Alexion, Project anager i

Project Directorate IV-1 l~

Divislon of Reactor Projects ill/IV Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499

Enclosure:

As stated cc w/ encl: See next page i

l

.. _. _ _. _ _ _ _ - _. _ _. _ =

i Mr. William T. Cott!s i

STP Nuclear Operating Company South Texas, Units 1 & 2 l

cc:

Mr. David P. Loveless Jack R. Newman, Esq.

Senior Resident inspector Morgan, Lewis & Bockius

- U.S. Nuclea,- Regulatory Commission 1800 M Street, N.W.

P. O. Box 910 Washington, DC 20036-5869 Bay City, TX 77414 '

Mr. Lawrence E. Martin j

A. Ramirez/C. M. Canady Vice President, Nuc. Assurance & Licensing City of Austin STP Nuclear Operating Company Electric Utility Department P. O. Box 289 721 Barton Springs Road Wadsworth,TX 77483 Austin,TX 78704 Office of the Govemor

. Mr. M. T. Hardt ATTN: John Howard, Director Mr. W. C. Gunst Environmental and Natural

. City Public Service Board Resources Policy

. P. O. Box 1771 P. O.' Box 12428

~ San Antonio,TX 78296 Austin,TX 78711 Mr. G. E. Vaughn/C. A. Johnson Jon C. Wood j

- Central Power and Light Company Matthews & Branscomb P. O. Box 289 One Alamo Center -

MailCode: N5012 106 S. St. Mary's Street, Suite 700

~- Wadsworth,TX 74483 San Antonio, TX 78205-3692 INPC Arthur C. Tate, Director Records Center-Division of Compliance & Inspe:: tion

700 Galleria Parkway Bureau of Radiation Control Atlanta, GA 30339-3064-Texas Department of Health 1100 West 49th Street Regional Administrator, Region IV Austin,TX 78756

- U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Jim Calloway Arlington,TX 76011 Public Utility Commission of Texas Electric Industry Analysis

. D. G. Tees /R. L. Balcom P. O. Box 13326 i

Houston Lighting & Power Co.

Austin, TX 78711-3326

= P. O. Box 1700 Houston,TX 77251 I

L Judge, Matagorda County

- Matagorda County Courthouse 1700 Seventh Street Bay City, TX 77414-(.

~

m