Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20195B851 + (00:57:38, 11 December 2024)
- ML20195B850 + (00:57:39, 11 December 2024)
- 05000498/LER-1988-032, :on 880512,feedwater Pump Failed Performance Test.Caused by Stress Corrosion Cracking/Hydrogen Embrittlement of Sleeve Matl.Pump Sleeve Matl Will Be Replaced W/Softer Stainless Steel + (00:57:41, 11 December 2024)
- ML20195B848 + (00:57:42, 11 December 2024)
- ML20195B847 + (00:57:42, 11 December 2024)
- ML20195B846 + (00:57:43, 11 December 2024)
- A07182, Informs That Listing of All nonsafety-related Suppliers & Matl Specs Required in Response to NRC Bulletin 87-002,Suppl 1, Fastener Testing to Determine Conformance W/Applicable Matl Specs, Would Consume Many Man Hours & Not Feasible + (00:57:44, 11 December 2024)
- ML20195B843 + (00:57:44, 11 December 2024)
- ML20195B841 + (00:57:45, 11 December 2024)
- ML20195B842 + (00:57:45, 11 December 2024)
- ST-HL-AE-2691, Monthly Operating Rept for May 1988 for South Texas Project Electric Generating Station,Unit 1 + (00:57:46, 11 December 2024)
- ML20195B838 + (00:57:47, 11 December 2024)
- ML20195B836 + (00:57:50, 11 December 2024)
- ML20195B835 + (00:57:51, 11 December 2024)
- ML20195B834 + (00:57:51, 11 December 2024)
- ML20195B832 + (00:57:52, 11 December 2024)
- ML20195B833 + (00:57:52, 11 December 2024)
- ML20195B829 + (00:57:53, 11 December 2024)
- ML20195B831 + (00:57:53, 11 December 2024)
- IR 05000482/1988023 + (00:58:25, 11 December 2024)
- ML20195B827 + (00:58:25, 11 December 2024)
- ML20195B825 + (00:58:26, 11 December 2024)
- ML20195B826 + (00:58:26, 11 December 2024)
- ML20195B823 + (00:58:30, 11 December 2024)
- ML20195B818 + (00:58:31, 11 December 2024)
- ML20195B819 + (00:58:31, 11 December 2024)
- ML20195B816 + (00:58:32, 11 December 2024)
- ML20195B817 + (00:58:32, 11 December 2024)
- ML20195B815 + (00:58:33, 11 December 2024)
- ML20195B814 + (00:58:33, 11 December 2024)
- ML20195B813 + (00:58:35, 11 December 2024)
- ML20195B811 + (00:58:36, 11 December 2024)
- ML20195B809 + (00:58:37, 11 December 2024)
- ML20195B804 + (00:58:38, 11 December 2024)
- ML20195B802 + (00:58:40, 11 December 2024)
- 3F0599-10, Submits Changes Made to Crystal River,Unit 3 Its,As Required by ITS 5.6.2.17.Encl Provides Revs to Plant ITS Bases That Will Update NRC Copies of Its.Instructions for Updating ITS, Encl + (00:58:44, 11 December 2024)
- ML20195B799 + (00:58:44, 11 December 2024)
- ML20195B798 + (00:58:45, 11 December 2024)
- 05000324/LER-1999-004-02, :on 990502,noted That Reactor Recirculation Sys Pump Discharge Bypass Valve 2-B32-F032B Was Inoperable. Caused by Valve Internal Component Tolerances & Missing Wedge Spring.Subject Valve Was Rebuilt.With + (00:58:47, 11 December 2024)
- ML20195B795 + (00:58:48, 11 December 2024)
- ML20195B794 + (00:58:49, 11 December 2024)
- PNO-IV-88-085, on 881022,plant Shutdown to Determine Source of Noise in Steam Generator 2.Source Believed to Be in Feed Flow Nozzle Area of Check Valve.Licensee Continuing Investigation of Problem + (00:58:49, 11 December 2024)
- ML20195B788 + (00:58:50, 11 December 2024)
- ML20195B789 + (00:58:50, 11 December 2024)
- ML20195B787 + (00:58:51, 11 December 2024)
- ML20195B786 + (00:58:52, 11 December 2024)
- ML20195B785 + (00:58:53, 11 December 2024)
- ML20195B784 + (00:58:54, 11 December 2024)
- ML20195B782 + (00:58:55, 11 December 2024)
- ML20195B778 + (00:58:58, 11 December 2024)
- ML20195B779 + (00:58:58, 11 December 2024)
- ML20195B777 + (00:59:00, 11 December 2024)