Provides Proposed Action Plan Description Per Commitment Re Asco Solenoid Valves Environ Qualification.Raychem/Chico Seals Installed on Environmentally Qualified Namco EA-180 Limit Switches Replaced W/Namco EC-210 Connectors
ML20195B823
Person / Time
Site: Farley  
Issue date: 10/17/1988
From: Hairston W
ALABAMA POWER CO.
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 8811020228
Download: ML20195B823 (6)


Text

'

l 'Y, Alabam: Pcwer Comp:ny 600 Nceth 18th Street Post Off <e Box 2641 B tmingha;n, Alabama 352914400 Tetephone 205 2 >0-1837 W. G. Hairston,IH

_ g, ng a.U.

Senior Vice President

~

4 Nucleat Operations Alabama Power Docket Nos. 50-348 50-364 Dr. J. H. Grace U. S. Nuclear Regulatory Commission Region II 101 Marietta Street Northwest i

Suite 2900 Atlanta, Georgia 30323

Dear Dr. Grace:

Joseph H. Farley Nuclear Plants Units 1 and 2 ASC0/NAHC0 Environmental Seals Commitments During the Environmental Qualification (EO) inspection at Farley Nuclear I

Plant, the NRC Staff expressed a concern about the lack of cable entrance seals on ASCO solenoid valves (SOVs).

Alabama Power Company has conferred with tne NRC Staff on several occasions to discuss its position that the as-found configuration of the ASCO valves was (and remains) envitonmentally qualified. The Staff has requested, and Alabama Power Company has agreed by letter dated May ll, 1988, that the Company vill submit a letter by October 24, 1988, to the Staff which describes the Company's proposed future action.

Since the February 4, 1988 inspection report, the environmental qualification of ASCO solenoid valves without cable entrance seals has been considered a technically unresolved item.

During the same inspection, concern was expressed by the NRC Staff that APCo's qualification documentation of the Chico A/Raychem seals for NAHC0 limit switches was incomplete. This concern was later escalated to a regulatory violation and made a part of a proposed imposition of civil penalty dated August 15, 1988.

The proposed civil penalty cited Alabama Power Company with failure to establish qualification for moisture intrusion seals on the reactor head vent solenoid valves and the limit svitches (both inside and outside containment).

In compliance with its earlier commitment regarding ASCO solenoid valves, and as a further explanation of its position regarding Chico A/Raychem seals, Alabana Pover Company provides the following:

Alabama Power Company continues to consider ASCO solenoid valves environmentally qualified without cable entrance seals and Raychem/ Chico seals environmentally qualified on NANCO limit svitchec. Alabama Power Company is currently preparing responses to the alleged violations contal:ed in the Notice ci Violation and Proposed Imposition of Civil Penalty dated August 15, 1988, which includen the alleged violation regarding NANCO environmeMal seals.

U.S. NRC REGION 2

,Ph

[

00jojy OFFIC!AL COPY Q

050003 0 PN l(

I-Eof

r#

Dr. J. N. Grace October 17, 1988 U. S. Nuclear Regulatory Commission Page 2 Vithout vaiving this position, however, Alabama Power Company, as it has previously committed, has replaced Raychem/ Chico seals that vere installed on environmentally qualified NAHC0 EA-180 limit switches inside the Unit 1 Containment with NAHC0 EC-210 connectors.

Alabama Pover Company vill similarly upgrade all environmentally qualified NANCO EA-180 limit switches inside Unit 2 Containment (which are listed in Attachment 1) no later than startup from the Unit 2 sixth refueling outage. Additionally, Alabama Pover Company hereby commits to install NAHC0 EC-210 connectors qualified to the requirements of 10CFR50.49 on those environmentally qualified NAHC0 limit switches in the main steam valve roo.e, (which are listed in Attachment 2) during the Unit I ninth and Unit 2 sixth refueling outages unless NRC concurrence with Alabama Power Company's position can be obtained prior to installation.

In addition Alabama Power Company vill add fuses to the electrical circuitry of certain limit switches and therefore the third item of the May 11, 1988 letter with regard to expediting investigation and resolution of identified ground conditions on the 125VDC Auxiliary Building battery system vill no longer apply.

Further, and again without vaiving the above position, it is Alabama Power Company's plan to install Conax ECSA cable entrance seals qualified to the requirements of 10CFR50.49 on those ASCOs listed in Attachment 3 during the Unit I ninth and Unit 2 sixth refueling outages, unless NRC concurrence with Alabama Power Company's position can be obtained prior to installation.

This proposed action plan received verbal concurrence from Mr. D. H.

Verrelli of the NRC Region II staff during a telephone conversation on October 14, 1988.

If you have any questions related to the above please advise.

Respectfully submitted, ALABAHA POVER COMPANY h.

V. G. Hairston III VGH,III/RVSimV.2.107 Attachments cc:

Mr. L. B. Long Mr. E. A. Reeves Mr. G. F. Maxwe)'

o ATTACHMENT 1 JOSEPH M.

FARLEY NUCLEAR PLANT r'-

UNIT 2 NAMCO LIMIT SVITCHES INSIDE CONTAINMENT COMPONENT EQUIPMENT FUNCTj01 LOCATION Q2B13252034-B Pressurizer Safety Valve Position CTMT Q2B13252035-B Pressurizer, Safety Valve Position CTMT Q2B13ZS2036-B Pressurizer Safety Valve Position CTNT N2B312SO444B-B Pressurizer PORY Position CTMT N2B312SO445A-A Pressurizer PORY Position CTMT N2B31258047-B WPS to PRT CTMT Q2E12253999A-A Reactor Cavity Cooling System CTMT 02E12ZS3999B-B Reactor Cavity Cooling System CTMT N2E21258149A-A Regen HX Shell Discharge CTMT N2E21258149B-A Regen HX Shell Discharge CTMT N2E21258149C-A Regen HX Shell Discharge CTMT Q2E21ZS8808AB-A Accum Tank Discharge Valve CTNT 02E21258808BB-B Accum Tank Discharge Valve CiMT Q2E21258808CB-A Accum Tank Discharge Yalve CTMT N2E212S8871-A Accum Test Line Isolation CTMT N2G212S1003-A Reac Cooling Drain Tank Discharge CTMT 02G21253376-B CTMT Sump Pump Discharge CTNT N2G21257126-A Reactor Cooling Drain Tank Outlet CTMT 02P13ZS28660-B CTMT Minipurge Supply CTMT Q2P132528670-B CTMT Minipurge Exhaust CTMT Q2P13ZS3196-8 CTHT Purge Exhaust CTMT 02P13ZS3197-B CTMT Purge Supply CTMT Q2P15ZS3101-B RCS Loop-2 Hotleg Sample CTMT Q2P15ZS3102-B RCS Loop-3 Hotleg Sample CTMT 02P15ZS3179A-A SG 2A Lower Blowdown Sample CTMT l

Q2P15ZS3179B-A SG 2A Upper Blowdown Sample CTMT l

Q2P15253179C-B SG 2A Blowdown Sample CTMT Q2P15253180A-A SG 2B Lower Blowdown Sample CTMT Q2P152.53180B-A SG 2B Upper Blowdown Sample CTMT l

Q2P15253180C-B SG 2B Blowdown Sample CTMT Q2P15253181A-A SG 2C Lower Blowdown Sample CTMT Q2P15ZS3181B-A SG 2C Upper Blowdown Sample CTMT 02P15ZS3181C-B SG 2C Blowdown Sample CTNT r

Q2P17ZS3184-B RCP CCW CTMT 02P17253443-A Excess Letdown HX Discharge CTNT Q2P15ZS3103-A Pressurizer Liquid Sagle CTNT Q2P15253104-A Pressurizer Steam Sample CTMT Q2P15ZS3765-A RCS Hot Leg Sample CTMT Q2P15ZS3766-A Accumulator Sample CTMT

ATTACHMENT 2

. ~.

ALABAMA POVER COMPANY FARLEY NUCLEAR PLANT' UNITS 1 & 2 NAMCO LIMIT SVITCHES s.

LOCATION COMP 0h'ENT

  • EQUIPMDh TUNCTION ROOM N1(2)C22250478-N SG1(2)A TO VTR TLOV CONTROL MSR N1(2)C22250479-N SG1(2)A TD YTR BYPASS MSR N1(2)C22ZSO488-N SG1(2)B PD VTR TLOV C0hTROL MSR i

N1(2)C22250489-M SG1(2)B FD VTR BYPASS MSR N1(2)C22ZSO498-N SG1(2)C TD VTR TLOV CohTROL MSR N1(2)C22ZS0199-N SB1(2)C TD VTR BYPASS MSR Q1(2)N1125336BA-A MAIN STEAM BYPASS MSR 01(2)N112S336BB-A MAIN STEAM BYPASS MSR ol(2)N112S336BC-A MAIN STEAM BYPASS MSR 01(2)N112$3369A-A MAIN STEAM ISOL.

MSR Q1(2)N11253369B-A MAIN STEAM ISOL.

MSR Q1(2)N11253369C-A MAIN STEAM ISOL.

MSR 01(2)N11253370A-B MAIN STEAM ISOL.

MSR 01(2)N11253370B-B MAIN STEAM ISOL.

MSR Q1(2)N11253370C-B KAIN STEAM ISOL.

MSR 01(2)N112S3976A-B MAIN STEAM BVPASS MSR Q1(2)N11253976B-B

AAIN STEAM BYPASS MSR l

01(2)N11253976C-5 MAIN STEAM BYPASS MSR 01(2)N12253234A-A STMBYPA$$TDATVPUMP MSR 01(.1)N12ZS3234B-3 STM BYPASS TDATV PUMP MSR c1(2JN12ZS3215A-AB STEAM ADM TO TDATV FUMP MSR 01(2)H122h32355-AB STEAM ADM TO TDATV PUMP MSR 01(2)N:2253227A-A MD ATV TLOV C0h' TROL MSR

At' tech $0nt 2 i

A'Iobo'b'Pcvar CocpOny Far*1cy Nucloor Plont Units 1&2 Pogo 2 LOCATION

~

COMPONENT,

EQUIPMENT FUNCTION ROOM Q1(2)N23ZS32278-A MD ATV FLOV C0hTROL MSR Q1(2)N23ZS3227C-A MD ATV FLOV CONTROL MSR Q1(2)N232S3228A-AB TD ATV FLOV CONTROL MSR Q1(2)N23ZS32285-AB TD ATV FLOV CONTROL MSR Q1(2)N23253228C-AB TD ATV FLOV CONTROL MSR Q1(2)N25ZS3772A-A CHEM ADDITION TO SG 2(2)A MSR Q1(2)N252537728-A CHEM ADDITION TO SG 1(2)B MSR Q1(2)N25ZS3772C-A CHEM ADDITION TO.EG 1(2)C MSR 1

s

  • Component TPNS numbers listed above provide unit specific designation as follovs: N1 or 01 designates Unit 1 N2 or Q2 designates Unit 2 NOTE: There are two limit svitches (open and closed) for each of the above listed TPNS nurbers.

l l

RVStV8.28 i

o 6

e ATTACRMENT 3

. ~,

ALABAMA POWER COMPANY TARLEY NUCLEAR PLANT UNITS 1 L 2 ASCO SOLENOID VALVES l

LOCATION COMPONENT

  • EQUIPMEP."' TUNCTION ROOM 01(2)PliSV3184-B RCP CCV CTNT l

l N1(2)B31SVd444B/.-B PZR FORY CTNT N1(2)B31SV0444BB-B PIR FORY CTNT N1(2)B31SV0445AA-A PIR FORY CTMT N1(2)B31SV0445AB-A PIR FORY CTMT 01(2)N11SV3369AC-A MAIN STEAM ISOL.

MSR 01(2)N11SV3369BC-A MAIF STEAM ISOL.

MSR 01(2)N11SV3369CC-A MAIN STEAM ISOL.

MSR 01(2)N11SV3370AC-B MAIN STEAM ISOL.

MSR 01(2)N11SV3370BC-B MAIN STEAM ISOL.

MSR Q1(2)N11SV3370CC-B MAIN STEAM ISOL.

MSR 01(2)N12SV3235A-AB STEAM ADM TO TDATV PUMP MSR 01(2)N12SV32355-AB STEAM ADM TO TDATV PUMP MSR 01(2)N235V3227AA-A MD ATV TLOV C0hTROL MSR 01(2)F235V3227AC-B MD ATV TLOV C0hTROL MSR 01(2)N235V3227BA-A HD ATV TLOV C0hTROL HSR Q1(2)N235V3227BC-B MD ATV TLOV C0hTROL MSR 01(2)NDSV3227CA-A MD ATV TLOV C0!GROL HSR Q1(2)N235V3227CC-B MD ATV TLOV C0}UROL MSR 01(2)N235V3228AA-AB TD ATV TLOV C0hTROL MSR 01(2)N235V3228BA AB TD ATV TLOV C0hTROL HSR 01(2)N235V3228CA-AB TD ATV TLOV C0hTROL MSR

  • C;.penent TPNS nue.bers listed above provide unit specific designation as follovst N1 or 01 designates Unit 1 N2 or 02 designates Unit 2

.