Informs That Staff Has Completed Review of Final Remediation Action Plan & Site Design & Remedial Action Insp Plan,Rev 1 for Uranium Mill Tailings Disposal Site at Naturita,Co.Nrc Ter,Documenting Review,Encl
ML20195B779
Person / Time
Issue date: 05/21/1999
From: Stablein N
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Rael G
ENERGY, DEPT. OF
Shared Package
ML20195B783 List:
References
REF-WM-66 NUDOCS 9906030023
Download: ML20195B779 (69)


Text

.

w a- Mr. George Rael, Direct:r May 21, 1999 U.S. Dep rtment of Energy Environment:1 Restorati:n Division -

Albuquerque Operations Office .

ERD /UMTRA P.O. Box 5400 Albuquerque, NM 87185-5400

SUBJECT:

FINAL TECHNICAL EVALUATION REPORT FOR THE NATURITA, COLORADO, URANIUM MILL TAILINGS SITE

Dear Mr. Rael:

The U.S. Nuclear Regulatory Commission (NRC) staff has completed its review of the final Remedial Action Plan and Site Design (RAP) and the RemecUal Action Inspection Plan (RAIP),

Revision 1, for the uranium mill tailings disposal site at Naturita, Colorado. The staff's review is documented in the enclosed final Technical Evaluation Report (TER).

Based on this review, the NRC staff concurs in the Naturita RAP and RAIP, and the signature pages are Enclosure 2. In its review of the preliminary final RAP for the Naturita processing and disposal sites, the NRC staff identified 26 open issues. Those issues have been satisfactorily addressed by the U.S. Department of Energy (DOE) in the final RAP, with the exception of several groundwater issues that have been deferred until a later phase of the Uranium Mill Tailings Remedial Action (UMTRA) Project.

If you have any questions concerning this subject, please contact the NRC Project Manager, Robert Carlson, at (301) 415-8165.

Sincerely, Original Signed By N. King Stablein, Acting Chief Uranium Recovery and Low-Level Waste Branch Division of Waste Management Office of Nuclear Material Safety and Safeguards

Enclosures:

As stated Il Bo ie ac bO Al ~~

I' E. Artiglia, TAC Alb R. Edge, DOE GRJ L#' ! ]

DISTRIBUTION wlEncl.: File Center NMSS r/f URLL r/f PUBLIC ACNW RCarlson w/o Encl.: JHolonich RWeller 77-f'7 DOCUMENT NAME: S:\DWM\URLLUSC\NATURITA\NEWTER\NATLTR.WPD 1 and S:\DWM\URLLUSC\NATURITA\NAT FTER.WPD  !

  • Please see previous concurrence.

OFC URLL* URLL , URll ,

NAME PSobel:cc CAbr[nh [SIaIhn DATE 04/23/99 05/[1 /99 05//./ /99 9906030023 990521

'FFICIAL RECORD COPY j PDR WASTE j WM-66 PDR _

J

.. . Mr. George Rrl, Director

. U.S. D p:rtment of En:rgy Env' nm:ntil R:stor tion Division .

Albuq que Operations Office F7D/UM A P.O. Box 54 Albuquerque, 87185-5400

SUBJECT:

FINAL 'ECHNICAL. EVALUATION REPORT FOR THE NATURITA, COLOR O, URANIUM MILL TAILINGS SITE

Dear Mr. Rael:

The U.S. Nuclear Regulatory Co mission (NRC) staff has completed its review of the final Remedial Action Plan and Site Des n (RAP) and the Remedial Action inspection Plan (RAIP),

Revision 1, for the uranium mill tailin disposal site at Naturita, Colorado. The staff's review is documented in the enclosed final Techn al Evaluation Report (TER).

- Based on this review, the NRC staff concurs ' the Naturita RAP and RAIP. In its review of the prehminary final RAP for the Naturita processi and disposal sites, the NRC staff identified 26 open issues. Those issues have been satisfacto ' addressed by the U.S. Department of Energy (DOE) in the final RAP, with the exception several groundwater issues that have been deferred until a later phase of the Uranium Mill ilings Remedial Action (UMTRA)

Project. As a result of the staff's concurrence, NRC is epared to sign the signature pages for the Naturita RAP, following their submittal by DOE.

If you have any questions concerning this subject, please con et the NRC Project Manager, Robert Carlson, at (301) 415-8165.

Sincerely, N. King Stablein, Acting Chi Uranium Recovery and Low-Level Waste Branch Division of Waste Management Office of Nuclear Material Safety and Safeguards D

Enclosure As stated cc: W.Woodworth, DOE Alb F. Bosilievac, DOE Alb E. Artiglia, TAC Alb R. Edge, DOE GRJ DISTRIBUTION w/Enci : File Center NMSS r/f URLL r/f PUBLIC ACNW 9MWM% -RWeisen deusesly-RCarlson --lim 4em T:2naramm stuuleer yy/o Encl.: 4hiehnson- JHolonich -%IEend RIMeines-DOCUMENT NAME. S:\DWM\UR$USC\NATURITA\NEWTER\NATLTR.WPD and S:\DWM\U R BUSC\N ATU RITA\N AT_ FTER.WPD OFC URLL URLL URLL NAME PSobedIb' CAbrams NStablein DATE 04/.d/99 04/ /99 04I /99 OFFICIAL RECORD COPY L a

ec l 1

.pn nw f n%

7 7 UNITED STATES l

h. L[ 't.j p

NUCLEAR REGULATORY COMMISSION WASHINGTON. D.C. 20%HKm gv j May 21, 1999 Mr. George Rael, Director U.S. Department of Energy Environmental Restoration Division Albuquerque Operations Office ERD /UMTRA P.O. Box 5400 Albuquerque, NM 87185-5400

SUBJECT:

FINAL- TECHNICAL EVALUATION REPORT FOR THE NATURITA, COLORADO, URANIUM MILL TAILINGS SITE

Dear Mr. Rael:

The U.S. Nuclear Regulatory Commission (NRC) staff has completed its review of the final Remedial Action Plan and Site Design (RAP) and the Rerledial Action inspection Plan (RAIP),

Revision 1, for the uranium mill tailings disposal site at Naturita, Colorado. The staff's review is documented in the enclosed final Technical Evaluation Report (TER).

Based on this review, the NRC staff concurs in the Naturita RAP and RAIP, and the signature pages are Enclosure 2. In its review of the preliminary final RAP for the Naturita processing and disposal sites, the NRC staff identified 26 open issues. Those issues have been satisfactorily addressed by the U.S. Department of Energy (DOE) in the final RAP, with the exception of

. several groundwater issues that have been deferred until a later phase of the Uranium Mill Tailings Remedial Action (UMTRA) Project.

If you have any questions concerning this subject, please contact the NRC Project Manager, Robert Carlson, at (301) 415-8165.

Sincerely, k )

N. ing Stablein, Acting Chief Uranium Recovery and Low-Level Waste Branch Division of Waste Management Office of Nuclear Material Safety and Safeguards

Enclosures:

As stated cc: W. Woodworth, DOE Alb F. Bosilievac, DOE Alb E. Artiglia, TAC Alb R. Edge, DOE GRJ L a