Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198A762 + (17:06:44, 10 December 2024)
- ML20198A757 + (17:06:45, 10 December 2024)
- ML20198A760 + (17:06:45, 10 December 2024)
- 05000245/LER-1985-008-01, :on 850114,after Return to Full power,5% Increase in Recirculation Flow Required to Attain Same Core Thermal Power.Caused by Injection of Oxides from Condensate Booster Pump Into RCS + (17:06:47, 10 December 2024)
- ML20198A754 + (17:06:48, 10 December 2024)
- ML20198A753 + (17:06:49, 10 December 2024)
- ML20198A751 + (17:06:49, 10 December 2024)
- ML20198A749 + (17:06:50, 10 December 2024)
- 05000280/LER-1983-030-03, /03l-0:on 830707,at 100% Power,Breaker for Heat Tracing Circuit 26A on Panel 9 Found Open.Breaker Closed. Circuit Verified Operational + (17:06:52, 10 December 2024)
- ML20198A744 + (17:06:54, 10 December 2024)
- ML20198A742 + (17:06:58, 10 December 2024)
- 05000247/LER-1985-012, :on 850928,reactor Trip Occurred Due to Power Range High flux-low Level Trip Signal.Caused by Operator Failure to Block Trip Signal Although Permissive for Blocking Trip Existed.Condition Stabilized + (17:07:00, 10 December 2024)
- ML20198A735 + (17:07:01, 10 December 2024)
- ML20198A727 + (17:07:04, 10 December 2024)
- ML20198A719 + (17:07:05, 10 December 2024)
- ML20198A720 + (17:07:05, 10 December 2024)
- ML20198A718 + (17:07:06, 10 December 2024)
- ML20198A714 + (17:07:15, 10 December 2024)
- RC-98-0226, Forwards Amend 42 to Psp.Changes Do Not Degrade Safeguards Effectiveness in PSP or Safeguards Contingency Plan,As Described in 10CFR50.54(p).Without Encl + (17:07:15, 10 December 2024)
- ML20198A712 + (17:07:16, 10 December 2024)
- ML20198A711 + (17:07:17, 10 December 2024)
- IR 05000331/1997015 + (17:07:18, 10 December 2024)
- ML20198A708 + (17:07:18, 10 December 2024)
- IR 05000424/1985027 + (17:07:30, 10 December 2024)
- ML20198A706 + (17:07:30, 10 December 2024)
- ML20198A705 + (17:07:32, 10 December 2024)
- ML20198A700 + (17:07:33, 10 December 2024)
- ML20198A699 + (17:07:33, 10 December 2024)
- IR 05000456/1997310 + (17:07:35, 10 December 2024)
- 05000285/LER-1985-006, :on 850928,three Main Steam Safety Valves Failed to Lift within 1% of Setpoint Valves During Test. Caused by Normal Drift + (17:07:37, 10 December 2024)
- 05000327/LER-1998-003-04, :on 981109,automatic Reactor Trip Occurred. Caused by Component in Bridge Circuit of Vital Inverter Failed.Inverter Bridge Circuit Replaced + (17:07:40, 10 December 2024)
- ML20198A690 + (17:07:41, 10 December 2024)
- ML20198A688 + (17:07:41, 10 December 2024)
- ML20198A686 + (17:07:42, 10 December 2024)
- 05000237/LER-1985-035-03, :on 850929,scram Occurred Due to Low Condenser Vacuum.Caused by Air in-leakage Through Ruptured Expansion Joint on Seal Steam Relief Valve Discharge Line.Bellows on Discharge Line Replaced + (17:07:48, 10 December 2024)
- ML20198A679 + (17:07:49, 10 December 2024)
- ML20198A676 + (17:07:50, 10 December 2024)
- ML20198A673 + (17:07:51, 10 December 2024)
- ML20198A675 + (17:07:51, 10 December 2024)
- ML20198A672 + (17:07:52, 10 December 2024)
- IR 05000424/1985030 + (17:07:56, 10 December 2024)
- ML20198A669 + (17:07:58, 10 December 2024)
- ML20198A667 + (17:07:58, 10 December 2024)
- ML20198A665 + (17:08:02, 10 December 2024)
- ML20198A666 + (17:08:02, 10 December 2024)
- ML20198A662 + (17:08:03, 10 December 2024)
- B16940, Forwards Revised Schedule for Completion of Commitment Re Corrective Action Plan for Training + (17:08:04, 10 December 2024)
- ML20198A659 + (17:08:04, 10 December 2024)
- ML20198A658 + (17:08:05, 10 December 2024)
- ML20198A657 + (17:08:06, 10 December 2024)
- ML20198A655 + (17:08:07, 10 December 2024)
- ML20198A652 + (17:08:08, 10 December 2024)