ML20198A719

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-269/85-34,50-270/85-34 & 50-287/85-34 on 850930-1004.No Violation or Deviation Identified
ML20198A719
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 10/25/1985
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
Shared Package
ML20198A724 List:
References
NUDOCS 8511060147
Download: ML20198A719 (1)


See also: IR 05000269/1985034

Text

1%

-

bCT 2 5 1985

Duke Power Company

p4TTN: Mr. H. B. Tucker, Vice President

Nuclear Production Department

422 South Church Street

Charlotte, NC 28242

Gentlemen:

SUBJECT: REPORT NOS. 50-269/85-34, 50-270/85-34, AND 50-287/85-34

On September 30 - October 4, 1985, NRC inspected activities authorized by NRC

Operating License Nos. DPR-33, DPR-47, and DPR-55 for your Oconee facility. At

the conclusion of the inspection, the findings were discussed with those members

of your staff identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

Should you have any questions concerning this letter, please contact us.

Sincerely,

!D

Virgil L. Brownlee, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Enclosure:

Inspection Report Nos. 50-269/85-34,

50-270/85-34, and 50-287/85-34

cc w/ encl:

A.S.Tuckman,StationManager

bec w/ encl:

vf!RC Resident Inspector

vfl. Nicolaras, NRR

4. Stang, NRR/0RB5 Q 10goM $5102529

Document Control Desk y

State of South Carolina

RI RI RII II

WHMil er:ht TEConTon ARHerdt HC

10 85

10/g/85 10/SM85 1/ ce/J[2)

85 f

(i

L.

. LEO)