Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20210F583 + (ML20210F583)
- JAFP-86-0747, Responds to NRC Re Violations Noted in Insp Rept 50-333/86-11.Corrective Actions:Interim Procedure Will Be Upgraded to Address Direct Turnover Purchases by 861201 & Storage Maint Administrative Program Will Be Developed + (ML20210F586)
- ML20210F588 + (ML20210F588)
- ML20210F589 + (ML20210F589)
- 05000298/LER-1986-006, :on 860227,reactor Trip Occurred During Special Procedure on Reactor Feedwater Control Sys.Caused by Removal of Pump W/Failed Fuse from Svc.Rev 2 to Special Order 86-01 Issued to Provide Feed Pump Operation Guidance + (ML20210F590)
- ML20210F593 + (ML20210F593)
- ML20210F594 + (ML20210F594)
- ML20210F602 + (ML20210F602)
- HL-5810, Forwards Rev 17B to Ei Hatch FSAR & Rev 14B to Fire Hazards Analysis & Fire Protection Program, for Plant.Encls Reflect Changes Made Since Previous Submittal.With Instructions + (ML20210F603)
- ML20210F604 + (ML20210F604)
- ML20210F607 + (ML20210F607)
- ML20210F612 + (ML20210F612)
- ML20210F613 + (ML20210F613)
- ML20210F616 + (ML20210F616)
- ML20210F619 + (ML20210F619)
- B17803, Discusses Revised Commitment Submitted in Licensee Which Responded to NOV on Design Deficiencies with Abfs. Ltr Removes Engineering Work Request (EWR) 3-93-00114 from List of EWRs Committed to in Subject Ltr + (ML20210F623)
- ML20210F624 + (ML20210F624)
- ML20210F631 + (ML20210F631)
- ML20210F638 + (ML20210F638)
- ML20210F642 + (ML20210F642)
- ML20210F648 + (ML20210F648)
- IR 05000348/1986016 + (ML20210F649)
- ML20210F650 + (ML20210F650)
- ML20210F653 + (ML20210F653)
- ML20210F656 + (ML20210F656)
- ML20210F658 + (ML20210F658)
- ML20210F659 + (ML20210F659)
- L-99-123, NPDES Discharge Monitoring Rept for June 1999 for BVPS, Units 1 & 2. with + (ML20210F662)
- ML20210F664 + (ML20210F664)
- ML20210F665 + (ML20210F665)
- ML20210F668 + (ML20210F668)
- ML20210F673 + (ML20210F673)
- ML20210F676 + (ML20210F676)
- ML20210F682 + (ML20210F682)
- RC-99-0147, Submits Attached Request for Relief from Performing SG PORV Strike Time Testing to Acceptance Criteria of Asme/Ansi OMa-1988 + (ML20210F686)
- ML20210F689 + (ML20210F689)
- ML20210F693 + (ML20210F693)
- ML20210F694 + (ML20210F694)
- ML20210F698 + (ML20210F698)
- ML20210F702 + (ML20210F702)
- 05000219/LER-1987-001, :on 870102,discovered That No Clamp Circuit Exists in APRM Rod Block Circuitry to Limit Recirculation Flow Setpoint to 108%.Caused by Inconsistency Between Tech Specs & Installed Hardware + (ML20210F706)
- 05000255/LER-1986-013, :on 860225,reactor Protection Sys Actuation Occurred from Spike in Nuclear Instrument Channel.Caused by Reenergization of Preferred Ac Bus During Manual Transfer. Procedural Controls Instituted + (ML20210F708)
- ML20210F710 + (ML20210F710)
- ML20210F713 + (ML20210F713)
- 05000315/LER-1987-001, :on 870112,determined That Calibr of Radioactive Liquid Effluent Monitors Did Not Literally Comply W/Tech Spec Surveillance Requirement 4.3.3.9.2.Caused by Misinterpretation of Measurement Range + (ML20210F716)
- 05000348/LER-1987-003, :on 870109,reactor Tripped on lo-lo Steam Generator Level Following Manual Tripping of Main Turbine. Caused by Failure to Monitor Steam Generator Feed Pumps Suction Pressure Adequately.Procedure Revised + (ML20210F719)
- ML20210F722 + (ML20210F722)
- ML20210F724 + (ML20210F724)
- ML20210F727 + (ML20210F727)
- ML20210F732 + (ML20210F732)
- ML20210F735 + (ML20210F735)