Reactor Protection Sys Trip Setpoint Drift Characterization
ML20210F682
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 10/17/1986
From: Hill B, Reynolds J
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML20210F657 List:
References
NP-982, NUDOCS 8702110136
Download: ML20210F682 (40)


Text

Enclosure A i

VIRGINIA PO99fER l

i l -

l l

l ENGINEERING &

l CONSTRUCTION l

TYPE 1 REPORT NP-982 REACTOR PROTECTION SYSTEN TRIP SETPOINT DRIFT CHARACTERIZATION NORTH ANNA POWER STATION 3 8 h ADO P

REACTOR PROTECTION SYSTEM TRIP SETPOINT DRIFT CHARACTERIZATION TYPE 1 REPORT

~

NORTH ANNA POWER STATION UNITS 1 AND 2 , , ,

NP-982 ,

I&C ENGINEERING ENGINEERING & CONSTRUCTION OCTOBER 17, 1986 Prepared By: .

e Technical Review:

Supervisor-

] i

___45_-BFH-22438-1 _ _ _ __

INTRODUCTION In 1983, the Westinghouse Owners Group (WOG) submitted a licensing topical t'

report WCAP-10271, " Evaluation of Surveillance Frequencies and Out of Service Times for the Reactor Protection Instrumentation Systems," to the NRC for approval. Upon acceptance by the NRC, the WOG utilities would use this document as a reference in a request for an increase of the surveillance interval from monthly to quarterly testing and an increase in the amount of time a channel could be in the bypass mode for maintenance on the Reactor Protection System ,

instrumentation channels.

4 The NRC was able to use WCAP-10271 as the basis for accepting the -

proposed changes in surveillance testing and bypass mode of operation for the instrumentation channels. Based on previous WOG submittals which do not

.specifically address quarterly surveillance testing and the increased time interval for a channel to be in the bypass mode, the NRC placed some stipulations upon their acceptance of the proposed changes. These stipulations are: 1) the less frequent surveillance testing should be based on the implementation of a staggered test plan; 2) the practice of performing evaluations to identify common causes when Reactor Protection System channel failures occur should be shown to be fonnalized in plant procedures; 3) in order l to perform routine channel testing in the bypass mode, plant design shall allow testing in bypass without lifting leads or installing temporary jumpers; 4) the utility shall confirm that the instrument setpoint methodology includes sufficient adjustments to offset the drift anticipated as a result of less frequent surveillance testing; and 5) channels that provide input to the Reactor l' .

Protection System and the Engineered Safety Features Actuation System should be j addressed such that there is no confusion over the frequency of surveillance l

testing required by the Technical Specifications for each system.

l 45

.,-BFH-22438-2

Engineering has been reauested to provide justification for increased surveillance interval in light of contingency number four. The Westinghouse setpoint methodology allowance for drift is chosen to conservatively bound any anticipated drift over a one month surveillance interval and does not address any anticipated drift over a quarterly surveillance interval. The parameters addressed in this study are the Reactor Protection System analog trip functions that have input only to the Reactor Protection System and do not provide an input to the Engineered Safety Features Actuation System. The list of the parameters is shown on Attachment 1. ,

' ~

METHODOLOGY The monthly surveillance test procedures for the analog trip channels associated with inputs only to the Reactor Protection System (See Attachment 2.)

were reviewed for the two year period between August,1984 and August,1986.

A review of the "as found" and "as left" data of the trip comparator setpoints over the twenty-four month period was performed to determine the equipment performance. This review provided information as to the adequacy of the existing' setpoints as related to the allowable values.

RESULTS l

The performance of the sixty-four trip comparators associated with the list on Attachment 1 (thirty-two from each unit) was reviewed. Overall, the bistable equipment is stable and showed good performance. Over the two year period only two comparators were replaced when they drifted out of tolerance. The surveillance testing results are presented in Attachment 3.

I l

l 45-BFH-22438-3 _ _ , _ _ _ _ _ _ _ _ _ _ ___

h Of the two comparators that were replaced, one was replaced before it drifted outside the tolerance for the module and the other one was replaced after it drifted out of tolerance in a one month period.

CONCLUSION A review of the surveillance test data indicates that if the testing were performed on a quarterly basis rather than a monthly basis, there would be no greater incidence of comparator setpoints drifting out of tolerance. This ,

confirms that the instrument setpoint methodology includes sufficient adjustments to offset the drift anticipated as a result of the less frequent surveillance testing. The data supports the proposed change from monthly '

surveillance to quarterly surveillance.

45-BFH-2243B-4 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

ATTACHMENT 1 ANALOG PROTECTION CHANNELS TRIP FUNCTIONS

1. Power Range - Neutron Flux High Setpoint
2. Power Range - Neutron Flux High Positive Rate
3. Power Range - Neutron Flux High Negative Rate
4. Source Range - Neutron Flux
5. Overtemperature Differential Temperature
6. Overpower Differential Temperature ,
7. Pressurizer Water Level - High

~ "

8. Loss of Reactor Coolant Flow - Single Loop

~

l l

ATTACHMENT 2 PERIODIC TEST LIST Test No. Title 1-PT-30.1 NIS Channel Functional Test Prior to Startup 1-PT-30.2.1 NIS Power Range Channel I (N41) Functional Test 1-PT-30.2.2 NIS Power Range Channel II (N42) Functional Test 1-PT-30.2.3 NIS Power Range Channel III (N43) Functional Test 1-PT-30.2.4 NIS Power Range Channel IV (N44) Functional Test 1-PT-31.1.1 T/TAVG Protection Channel I (T-412) Functional Test 1-PT-31.1.2 T/TAVG Protection Channel II (T-422) Functional Test 1-PT-31.1.3 T/TAVG Protection Channel III (T-432) Functional Test ,

1-PT-31.3.1 Loop 1 Reactor Coolant Flow Channel .I (F-414) Functional Test 1-PT-31.3.2 Leop 2 Reactor Coolant Flow Channel I (F-424) Functional 1-PT-31.3.3 Loop 3 Reactor Coolant Flow Channel I (F-434) FunctionalTestTes.t 1-PT-31.3.4 Loop 1 Reacter Coolant Flow Channel II F-415) Functional _ Test 1-PT-31.3.5 Loop 2 Reactor Coolant Flow Channel II F-425) Functional Test 1-PT-31.3.6 Loop 3 Reactor Coolant Flow Channel II F-435) Functional Test 1-PT-31.3.7 Loop 1 Reactor Coolant Flow Channel III (F-416) Functional Test 1-PT-31.3.8 Loop 2 Reactor Coolant Flow Channel III (F-426) Functional Test 1-PT-31.3.9 Loop 3 Reactor Coolant Flow Channel III (F-436) Functional Test 1-PT-31.7.1 Pressurizer Level Channel I (L-459) Functional Test 1-PT-31.7.2 Fressurizer Level Channel II (L-460) Functional Test 1-PT-31.7.3 Pressurizer Level Channel III (L-461) Functional Test NOTEt The Unit 2 periodic tests are the same with the exception of the prefix number which is "2" rather than "1".

~

l l

l i

f- ,

l l

i

.45-BFH-22438-6 _ ,_ , _ _ . _ _ _ _ _ _

PCD9W 3 PERIO:::: 'IST 0 TEST EESCRIPTION DATE RANGE UNITS SET PCINT T.ASURE3 ERROR % ERRCR AC7ICN TAKEN iPT20,1 SOURCE RMi Rlj! N31 08-97-84 77000 - 123000 CPS 120000 90000 -10000 10 08-14-84 77000 - 130000 CPS 100000 100000 0 0 08-22-84 77000 - 133000 CPS 100000 100000 0 0 08-29-84 77000 - 130000 CPS 100000 100000 3 0 09-64-84 77000 - 130000 CPS 100000 100000 0 0 09-11-84 77000 - 120000 CPS 100000 100000 0 0 09-18-84 77000 - 132000 CPS 100000 100000 0 0 39-24-84 77000 - 120000 CPS 130000 100000 3 0 10-02-84 77000 - 120000 CPS 100000 130000 0 0 10-09-84 77000 - 130000 CPS 130003 100000 0 0 10-16-84 77000 - 130000 CPS 100000 100000 0 0 10-23-84 77000 - 130000 CPS 130000 100000 0 0 10-31-84 77000 - 130000 CPS 100000 100000 0 0 11-06-84 77000 - 132000 CPS 100000 100000 8 0 11-14-84 77000 - 120000 CPS 100000 100000 0 3 11-20-84 77000 - 133000 CPS 100000 100000 0 0 12-21-84 77000 - 120000 CPS 100000 100000 0 0

!2-31-84 77000 - 130000 CPS 180000 100000 0 0 22-31-85 77000 - 130300 CPS 100000 97000 -3230 3%

03-84-85 77300 - 130000 CPS 130000 100000 0 0%

04-02-85 77000 - 122000 CPS 120000 100000 3 0%

~

05-03-85 77000 - 132200 CPS 100000 10P900 0 0%

06-03-85 77000 - 130000 CPS 100000 100000 0 01 07-03-85 77000 - 120020 CPS 190000 100000 0 0% -

08-07-85 77000 - 123000 CPS 100000 "A000 -10000 10 %

38-15-85 77000 - 123000 CPS 100000 100000 0 3%

89-13-85 77000 - 120000 CPS 100000 130000 0 0%

39-22-85 77000 - 120200 CPS 10?e00 120000 e 0%

10-02-85 77 M - 133000 CPS 100000 100000 0 0%

10-14-85 77200 - 132000 CPS 100000 !20000 0 0%

10-24-85 77200 - 122300 CPS 103000 100000 0 01 12-14-85 77200 - 122000 CPS 123000 S3000 -22?3 2%

12-23-85 77000 - 122000 CPS IN030 9'200 - 220 5%

12-31-85 77300 - 122000 CPS 120000 91200 -9000 9%

31-06-86 77300 - 130000 CPS 100000 100000 0 01 01-15-86 77200 - 133000 CPS 100000 90000 -12??2 la %

02-13-86 77000 - 122000 CPS 100000 95000 -5000 5%

02-25-86 77030 - 120000 CPS 130000 120000 0 3%

03-27-86 77200 - 130000 CPS 100020 100000 0 0%

04-25-86 77000 - 120200 CPS 122300 100000 0 0$

05-20-86 77000 - 120020 CPS 100000 100000 0 2%

06-01-86 77300 - 120000 CPS 120000 122000 3 0%

06-30-86 77300 - 122020 CPS 120003 100000 0 0%

08-31-86 77300 - 120000 C?S 100000 102000 3 3%

50'JR'E .tS R'.:X N32 08-07-34 77000 - 123000 CPS IN000 92300 -12220 10 23-14-84 772f8 - 122000 CPS 122300 100000 3 3 03-22-84 77003 - lN000 CPS 120020 100000 0 0 23 S4 77200 - 122220 CPS IN230 120000 3 3 09-04-84 77000 - 120000 CPS ;00003 100000 0 0 39-11-84 77000 - 120t00 CPS  !?2000 123000 2 0 29-:8-84 77 NO - 120000 CPS IN200 IN000 3 3 29-24-84 77000 - 12200 CPS 10?000 920?0 -12000 10 10-02-84 77020 - ;33300 CPS 0Nf3 100N0 2 3 13-29-84 77000 - 122000 CPS 10NtB 122000 0 3 12-15-84 '7000 - 122020 CPS ;00000 ;N?30 2 3

%c.ct3

ATTAC E T 3 PERICD!C TES7 i TEST CESCRIPTICN DATE RANGE UNITS SET R)!NT PEASURED E7@a % ERROR ACTION TAKEN 19T30.1 SOURCE RN6 FLUX N32 10-23-84 77000 - 130000 CPS 100000 100000 0 0 10-31-84 77000 - 130000 CPS 100000 100000 0 0 11-06-84 77000 - 130800 CPS 100000 100000 0 0 11-14-84 77000 - 130000 CPS 100000 100000 0 0 11-20-84 77000 - 130000 CPS 183000 100000 0 0 12-21-84 77000 - 130000 CPS 100000 100000 0 0 12-31-84 77000 - 130000 CPS 100008 100000 0 0 02-01-85 77000 - 130000 CPS 100000 100000 0 05 03-04-85 77000 - 130000 CPS 100000 100000 0 01 04-02-85 77000 - 130000 CPS 100000 100000 0 0%

25-03-85 77000 - 130000 CPS 100000 100000 0 0%

06-03-85 77000 - 130000 CPS 100000 100000 0 0%

07-03-85 77000 - 130000 CPS 100000 100000 0 05 08-07-85 77000 - 130000 CPS 100000 95000 -5000 5%

08-15-85 77000 - 130000 CPS 100000 100000 0 01 09-13-85 77000 - 130000 CPS 100000 100000 0 01 09-22-85 77NO - 130000 CPS 100000 100000 0 05 10-02-85 77000 - 130000 CPS 100000 100000 0 0%

10-14-85 77000 - 130000 CPS 100000 100000 0 0%

10-24-85 77000 - 132000 CPS 100000 100000 0 0%

12-14-85 77000 - 130000 CPS 100000 98000 -2000 2% -

12-23-85 77000 - 130000 CPS 100000 100000 0 0%

12-31-85 77000 - 130000 CPS 100000 100000 0 05 01-06-86 77000 - 130000 CPS 100008 100000 0 0%

01-15-86 7'200 - 133300 CPS 100000 100000 0 01 02-18-86 77000 - 130000 CPS 100000 100000 0 0%

02-25-86 77200 - 130000 CPS 100000 100000 0 0%

23-27-86 77220 - 132000 CPS 100008 100000 0 01 04-25-66 77000 - 130000 CPS 100000 100000 0 0%

05-20-86 77000 - 132000 CPS 100000 100000 0 0%

06-01-86 77000 - 130000 CPS 100000 100000 0 01 26-30-86 77200 - 132000 C?S 130000 100000 C 0%

23-01-86 77000 - 130000 CPS 100000 100000 0 01 l

l l

1T730. 2.

  • HI F:1.!I TRIP 09-11-84 (= 110 % Full Power 109 % 20 -89 31.5 PHYSICS TEST 3 09-24-84 (= 110 1 Full Pcwer 109 % 20 -89 S1. 6  ?'f(SIC r 3 23TS 10-29-84 (= 110 % Full Power 139 % 109 0 0%

12-03-84 (= 110 % Full Power 109 % 109 0 0%

12-30-84 (= !!O % Full P;wer 109 % 109.1 .1 .09 01-31-85 (= 110 % Full Power !M % 109.2 .2 .18 03-01-85 (= 110 % Full Power 129 % 103 0 0%

24-02-35 (= l10 % Fall Pemer 109 % 103 0 0%

25-02-35 (= !!0 % Full Pc*er 139 1 109 3 0%

( 05-32-85 (= 1:0 % Full Power  !?? % 129 0 0%

05-30-85 (= 110 1 Full Pcwer 109 1 109 0 01 03-01-85 (= !!0 1 Full Pcaer 103 % 109 0 0%

i 38-29-85 (= !!0 1 Full ?cwer 129 1 109 0 0%

I 29-33-85 (= 1:0 % Full Pener 109 % 109 0 0%

! 12-1S-35 (= !!O % Full Pcaer 109 % 30 -83 3:.5 PHYS::S TE5TS 12-23-S5 (= 1:0 % Ful; Pc.er 129 % 20 -o3 81.6 ~hYSICS TEST 3 31-23-26 (= 1:0 % Fall pcwer 139 % 129 0 0%

02-27-86 (= 113 % Full ? >er 129 % 129.25 .25 .23 02-23-26 (= 110 % Full Pcwer 109 % 129.25 .25 .25 i

L %ge t **

ATT;D E NT 3 PERICDIC 'E3T I TEST DESCRIPTI(N DATE RANGE UNITS SET POINT EASURED ERRCR % ERROR ACTICN TAKEN

.=

1PT38.2.1 HI FLUX TRIP 83-29-86 (= 110 % Full Power 109 % 109 0 0%

84-25-86 (= 118 % Full Power 109 5 189 8 3%

95-23-86 (= 110 % Full Power 109 % 133 9 8%

86-23-86 (= 118 % Full Power 109 % 129 9 0$

87-25-86 (= 110 % Full Power 109 % 109 0 8%

TSATIVE RATE TRIP 39-11-84 (= 5.5 % Full Power 51 4.9 .1 2%

09-24-84 (= 5.5 % Full Power 51 5 0 01 18-29-84 (= 5.5 % Full Pcmer 5% 4. 8 .2 4%

12-43-84 (= 5.5 % Full P m r 5% 5 0 0%

12-38-84 (= 5.5 % Full Power 5% 5 8 0$

01-31-85 (= 5.5 % Full Pcwer 5% 4.5 .5 10 1 03-81-85 (= 5.5 % Full Pcuer 5% 5 0 0$

04-02-85 (= 5.5 % Full Pcwer 51 4.9 .1 2%

05-32-85 (= 5.5 % Full Power 5% 5 8 35 05-38-85 (= 5.5 % Full Power 5% 5 0 01 86-38-85 (= 5.5 % Full Power 5% 5 0 0%

08-01-85 (= 5.5 % Full Power 5% 5 0 01 08-29-85 (= 5.5 % Full Power 55 5 0 8%

09-30-85 (= 5.5 1 Full Pcuer 5% 5 0 81 12-19-85 (* 5.5 % Full Power 51 4. 5 .4 8% ~

12-23-E5 (= 5.5 % Full Powcr 5% 5 0 01 01-23-86 (= 5.5 % Full Power 5% 4. 5 .5 18 %

02-27-86 (= 5.5 % Full Power 5% 5 0 01 02-28-86 (= 5.5 % Full Power 51 5 0 01 03-29-86 (= 5.5 % Full Power 5% 4.9 .1 2%

04-25-86 (= 5.5 % Full Pcuer 55 5 8 0%

05-23-86 (= 5.5 % Full Power 5% 5 0 0%

26-23-86 (= 5.5 % Full Pcwer 5% 5 0 3%

07-25-86 (= 3.5 % Full Pcaer 5% 5 0 0%

POSIT M RATI TRIP 39-11-84 (= 5.5 % Fall Power 5% 5 0 3%

29-24-84 (= 5.5 % Full Power 5% 5 0 0%

10-29-84 (= 5.5 % Fall Pcuer 5% 4. 5 .5 la %

12-33-84 (= 5.5 % Full Pcwer 5% 4. 9 .1 2%

12-30-84 (= 5.5 % Full Pcwer 55 5 3 0%

01-31-85 (= 5.5 % Full Power 5% 4. 6 .4 8%

83-81-85 (= 5.5 % Full Power 5% 5 0 0%

04-02-85 (= 5.5 % Fall P:wer 5% 4. 6 .4 8%

85-82-85 (= 5.5 % Fall Power 5% 4. 8 .2 4%

25-30-85 (= 5.5 % Full Power 5% 5. 4 .4 8%

36-30-85 (= 5.5 % Full Pcwer 5% 5 3 0%

88-01-85 (= 5.5 1 Fall Power 5% 4. 9 .1 21 28-29-85 (= 5.5 % Full Pcwer 5% 4.98 .02 .4 %

29-30-35 (= 5.5 % Full Pcwer 5% 4. 8 .2 4%

12-18-85 (= 5.5 % Fall Powe- 5% 5. 5 .5 13 $

12-23-85 (= 5.5 % Full Pc er 5% 4.9 .1 2%

31-23-86 (= 5.5 % Full Power 51 4.75 .25 5%

22-27-86 (- 5.5 % Full Pcwer 5% 5 3 0%

22-28-86 (= 5.5 % Full Pcwer 5% 5.05 .05 1%

03-29-S6 (= 5.5 % Full Power 5% 4. 8 .2 4%

04-25-86 (= 5.5 % Fall Po er  !% 5 2 3%

i 25-23-26 (= 5.5 % Full Pcwer 5% 5 2 0%

26-23-86 (= 5.5 % Full Pcwer 51 5 3 3$

27-25-86 (= 5.5 % Full Pcwer 5% 5 0 2%

L- Ism)

ATTACHMENT 3 PERICDIC 'IST I TEST DESCRIPTI31 CATE R!NiE UNITS SET POINT MEASURED ERROR % ERROR ACTION Ta(EN

!PT38.2.2 HI FL111 TRIP 09-47-84 (= 110 1 Fall Power 109 % 20 -89 81.6 PHYSICS TESTS 99-24-84 (= 118 % Full Pcwer 189 % 28 -89 81.6 PHYSICS TESTS 18-29-84 (= 118 % Full Power 109 % 189 0 0%

12-83-84 (= !!8 % Full Power 189 % 189 8 9%

12-38-84 (= 110 % Full Power 189 % 109 9 0%

81-31-85 (= 118 % Full Power 189 189.2 .2 .18 83-01-85 (= !!O % Full Power 189 109 8 81 04-92-85 (= 116 % Full Power 189 189 8 01 85-02-85 (= !!B % Full Pcwer 109 109.1 .1 .89 05-38-85 (= 118 % Full Power 189 189 8 9%

06-30-85 (= 118 % Full Power 109 189 0 01 08-81-85 (= 110 $ Full Power 189 109.3 .3 .28 08-28-85 (= 110 % Full Power 109 109.1 .1 .89 09-38-85 (= 110 % rull Power 139 189 0 85 12-18-85 (= !!0 % Full Power 109 20 -89 81.6 PHYSICS 'ISTS 12-23-85 (= 118 % Full Power 189 28 -89 81.6 PHYSICS TESTS 12-24-85 (= 110 1 Full Power 109 20.1 88.9 81.5 PHYSICS TESTS 81-30-86 (= !!8 % Full Power 189 1 109 8 8%

02-28-86 (= !!8 % Full Dower 189 % 189 0 0%

03-29-86 (= 110 % Full N er 189 % 189 0 01 04-25-86 (= 110 % Full Power 189 % 109 0 05 05-23-86 (= 110 % Full Power 189 % 139 0 8%

06-23-86 (= 110 % Full Power 189 % 109 0 0%

07-25-86 (= 110 $ Full Power 189 % 109 0 0%

NE3ATIVE RATE TRIP 09-07-84 (= 5.5 % Full Power 5% 5 0 01 09-24-84 (= 5.5 % Full Power 5% 5 0 0%

10-29-84 (= 5.5 % Full Pc'er w 5% 5 0 0%

12-03-84 (= 5.5 % Full Pcwer 5% 5 0 0%

12-30-84 (= 5.5 % Full Power 5% 5 0 0%

21-31-85 (= 5.5 % Full Pcwer 51 4. 9 .1 2%

03-01-85 (= 5.5 % Full h er 5% 5 0 01 34-02-85 (= 5.5 % Full Power 5% 4. 0 .2 4%

05-32-85 (= 5.5 % Full Power 5% 5 0 0%

05-30-85 (= 5.5 % Full Power 5% 5 0 0%

05-30-85 (= 5.5 % Full Power 5% 4. 9 .1 25 08-01-85 (= 5.5 % Full her 5% 5 0 0% '

08-28-85 (= 5.5 % Full Power S% 5 0 0% '

09-38-85 (= 5.5 % Full h er 51 5 0 3%

12-18-85 (= 5.5 % Full Power 5% 4.75 .25 51 12-24-85 (= 5.5 % Full Power 5% 5 0 01 01-30-86 (= 5.5 % Full Power 5% 5 0 0%

02-28-86 (= 5.5 % Full Po er 5% 5 0 0%

03-29-86 (= 5.5 % Full Power 5% 5 0 0%

34-25-86 (= 5.5 % Full Pcwer 5% 5 3 0$

05-23-86 (= 5.5 % Full ?cwer 5% 5 0 05 05-23-86 (= 5.5 % Full Pcaer 5% 5 3 0%

07-25-86 (= 5.5 % Full Power 5% 5 0 0%

~.'SITIVE RA'E TRIP 09-07-84 (= 5.5 % Fall Power 5% 5.1 .1 2%

09-24-34 (= 5.3 % Full b ar 51 5 0 01 13-29-34 (= 5.5 % Full her 5% 5. 2 .2 4%

12-33-84 (= 5.5 % F d! Power 5% 5.1 .1 21

2-30-34 (= 5.5 % Full h er 55 5 0 01 01-31-85 (= 5.5 % Full b er 5% 5 0 0%

m

ATTACR O T 3 FERICDIC TEST 4 TEST DESCRIPTION CATE MNGE LMITS SET POINT EASURED ERRCR % ERRCR ACTICN TAKEN 1PT38.2.2 POSITIVE MTE TRIP 03-01-85 (= 5.5 1 Full Power 5% 5 0 8%

84-02-85 (= 5.5 % Full Power 5% 4. 8 .2 4%

05-42-85 (= 5.5 % Full Power 5% 5 8 8%

85-3F85 (= 5.5 % Full Power 51 5. 2 .2 45 86-38-85 (= 5.5 % Full Power 5% 5 9 05 08-81-85 (= 5.5 % Full Power 55 5.1 .1 2%

88-28-85 (= 5.5 % Full Power 5% 5 8 9%

09-30-85 (= 5.5 % Full Pcwer 55 4. 9 .1 2%

12-18-85 (= 5.5 % Full Power 51 5.1 .1 25 12-23-85 (= 5.5 % Full Power 5% 5 8 8$

12-24-85 (= 5.5 % Full Power 5% 5 0 8%

91-38-86 (= 5.5 % Full Power 55 5.1 .1 25 02-28-86 (= 5.5 % Full Power 5% 5 0 01 93-29-86 (= 5.5 % Full Power 55 4. 9 .1 2%

24-25-86 (= 5.5 % Full Power 5% 5 8 0%

85-23-86 (= 5.5 % Full Power 5% 5 0 9%

06-23-86 (= 3.5 5 Full Power 55 5 0 0%

97-25-86 (= 5.5 % Full Power 5% 5 0 8%

IPT30.2.3 HI FLUX TRIP 09-11-84 (= 110 % Full Pcuer 199 % 20 -89 81.6 PHYSICS TESTS 99-24-84 (= 110 % Full Power 109 5 20 -89 81.6 PHYSICS TESTS 10-29-84 (= 110 % Full Power 109 % 109 8 8%

12-03-84 (= lia % Full Power 199 % 109.1 .1 .09 12-30-84 (= 110 % Full Power 109 % 109.2 .2 .13 01-31-85 (= 110 % Full Pcwer 109 % 109.5 .5 .46 63-01-85 (= !!0 % Full Power 109 % 199.5 .5 46 04-82-85 (= 110 % Full Power 109 % 109.5 .5 46 05-02-85 (= 110 % Full Pcwer 109 % 109 0 01 05-30-85 (= 110 % Full Power 189 % 199 0 0%

06-30-35 (= 110 % Full Power 109 % 109 0 0%

08-01-85 (= 110 % Full Power 109 % 109 0 0%

08-28-85 (= 110 % Full Pc*er 109 % 109 0 0%

11-08-85 (= 110 % Full Power 129 % 109 0 0%

12-18-85 (= !!0 % Full Pcwer 109 % 20 -89 81.6 M SICS *ESTS 12-22-85 (= 110 % Full Pcwer 109 % 29 -89 81.6 ?HYS:CS TESTS 12-23-85 (= 110 % Fu!! Power 109 % 20 -89 81.6 PHYSICS TESTS 81-29-86 (= !!0 % Full Pcwer 109 % 109 0 0%

22-28-86 (= 110 % Fu!! Pcwer 109 % 103 0 01 03-29-86 (= 110 % Full Powr 109 % 109 0 0%

04-25-86 (= !!0 % Fall Power 109 % 103 0 0%

05-23-86 (= 110 % Full Pc*er 109 % 109 0 0%

06-23-B6 (= 110 $ Full Pcwer 109 % 108.8 .2 .18 07-25-86 (= 110 % Full Power 109 % 109 0 0$

NEGATIVE RATE TRIP 09-11-84 (= 5.5 % Full Pcwer 5% 4. 8 .2 4%

09-24-84 (= 5.5 i Full Poner 5% 5 0 0%

10-29-84 (= 5.5 % Full Power 51 4.8 .2 4%

2-03-34 (= 5.5 % Fall Power 5% 4. 8 .2 4%

12-20-S4 (= 5.5 % Full Pc.er 5% 5 0 0%

01-31-35 (' 5.5 % Full Pcaer 5% 5 0 0%

03-2:-85 (= 5.5 % Full Pcwer 51 4. 9 .1 21 04-02-S5 (= 5.5 % Full Pcwer 5% 4. 7 .3 6%

ATTTO?ENT 3 PERICDIC TIST I TEST DESCRIPTION DATE RANGE LNITS SET POINT NEA!L~dED .ERRCR 1 ERRCR ACTION !TJEN

!PT30,2,3 EGATIVE RATE TRIP e5-02-85 (= 5.5 % Full Powe 5% 5 0 01 05-36-85 (= 5.5 % Full Power 5% 5 0 0%

06-30-85 (= 5.5 % Full Pow r 5% 5 0 0%

38-01-85 (= 5.5 % Full Power 5% 4.1 .9 18 %

08-28-85 (= 5.5 % Full Po ur 5% 5 1 3%

11-46-85 (= 5.5 % Full Powe 55 4. 8 .2 4%

12-18-85 . (= 5.5 % Full Powr 55 4.75 .25 5%

12-22-85 (= 5.5 % Full Pcuer 5% 4. 9 .1 2%

12-23-85 (= 5.5 $ Fu!! Pcw e 5% 4. 8 .2 4%

01-29-86 (= 5.5 % Full Po w e 5% 4. 9 .1 2%.

02-28-86 (= 5.5 5 Full Power 5% 5 0- 1%

83-29-86 (= 5.5 % Full Power 5% 4.9 .1 '2 %

04-25-86 (= 5.5 % Full Power 5% 5 3 01 05-23-86 (= 5.5 % Full her 5% 5 0 01 36-23-86 (= 5.5 1 Full Power 5% 5 0 0%

07-25-86 (= 5.5 % Full Power 5% 4. 7 .3 6%

POSITIVE RATE TRIP 03-11-84 (= 3.5 % Full Power 5% 5 0 01 09-24-84 (= 5.5 % Full Power 5% 5 0 0%

10-29-84 (= 5.5 % Full Power 5% 5 0 01 12-03-84 (= 5.5 % Full Pcwer 5% 4. 9 .1 21 '

12-30-84 (= 5.5 % Full Pcwer 5% 5 0 0$

01-31-85 (= 5.5 % Full Power 5% 5 0 0%

03-01-85 (= 5.5 % Full Power 5% 5 0 01 24-02-85 (= 5.5 % Full Power 5% 4. 7 .3 6%

05-02-85 (= 5.5 % Full Pcwer 5% 5 3 8%

25-30-85 (= 5.5 % Full Power 5% 5.1 .1 2%

06-30-35 (= 5.5 % Full Pcwer 5% 5 0 01 08-01-85 (= 5.5 % Fall Pe=er 5% 5.1 .1 2%

23-28-85 (= 5.5 % Full Power 5% 5 0 0%

11-08-85 (= 5.5 % Full Pcwer 5% 5 3 05 12-18-85 (= 5.5 % Full Power 5% 5.25 .25 5%

12-22-85 (= 5.5 % Full Pcuer 5% 5 0 3%

12-23-85 (= 5.5 % Full Pcwer 5% 5 0 01 31-29-86 (= 5.5 % Full Pcwer 5% 4. 8 .2 4%

02-28-86 (= 5.5 1 Full Pcwer 5% 5 0 0%

03-29-86 (= 5.5 % Full Pcwer 5% 4. 9 .1 2%

04-25-86 (= 5.5 % Full Power 5% 5 2 3%

05-23-86 (= 5.5 % Full Pcwer 5% 5 6 0$

06-23-86 (= 5.5 % Full Pcwer 5% 5 0 01 07-25-86 (= 5.5 % Fall Pca r 5% 5 0 0%

PT32. 2. 4 H: FLUX TR:P 0?-!!-84 (= 110 % Full Pcwer 103 % 20 -83 81.8 PHYS:CS 2 3!3 29-26-84 (= 110 % Full Power 139 % 103 3 3 13-23-84 (= 110 % Full b er 103 5 10 0 0

'2-33-84 (= 113 % Full ?c.er 123 % 139 3 3 12-30-84 (= 113 % Full Power 109 % 109 0 3 31-31-35 (= 1 3 % Fall b er 123 123 3 3%

, 03-04-85 (= 112 % Fall h er 109 % l09 3 2%

l 34-02-85 (= 113 % Full h er 123 % 139 3 0f 25-?2-85 (= 112 % Full b er 123 % 103 0 21 25-33-85 (= !!3 % Fall Pcwer 129 % 139 2 2%

x- *

  • M' (

,'{

~!TPCIG 3 i

PERIO:IC *EST 4 TEST DESCRIPTI m - DATE RANT *E UNITS SET POINI2 !)EASURED ' ERROR 41 ERP.0( ACTI(N TiE 19738 4 4 HI FLUX TRIP 86-36-85 . (= 118 % Full Power 189 % - 109 0 ,8% Y' 88-81-85 \ (= die $ Full Pcwe 189 % 189 ' 8 85 88-29-85 (* !!0 % Full Power 189 % 109 0 01 89-3 H 5 (= 118 % Full Power 189 1 189 0 8%

12-19-85 (= !!8 % Full Pcuer 109 % 20 -89 81.6 PHYSICS TESTS 12-22 (= 118 % Full Power 189 % 28 -89 81.6 PHYSICS TESTS 12-23-85 (= 110 1 Full Power 109 % 20 -89 81.6 PHYSICS TESTS 01-29-86 (= 118 % Full Power 139 % 109 8 8%

82-28-86 (= 110 % Full Power 189 % 189 0 -a %

33-29 (= 118 % Full Power 189 % 189 0 8%

04-25-86 (= 118 % Full Power 189 % 109 3 8%

25-27-86 (= 118 % Full Pcwer .129 % 189 2 0$ ,

.m 06-23-86 (= 118 % Full Pcwer 189 % 109 0 0%

07-25-86 ,' (= 118 % Full Power 189 % 109 8 8%

Q

~

lEGCTIVE RATE TRIP 09-11-84 (= 5.5 % Full Power 5k 5 '

18 0%

09-25-04 (= 5.5 % Full Pee r 55 5 , Id 8

.' 18-29-84 (= 5.5 % Full Power 5%, 5 ,, 8 8 12-83-84 (= 5.5 % Full Pee - 5%' 5 '

8 8 12-38-84 (= 5.5 % Full N wer 5%- 5 8 8 -

~2 31-31-85 55 2%

(= 5.5 % Fu!! Power l 4. 9 .!

/ *. ' 03-04-85 '

(= 15 % Full Pid

  • 5% 5 0 0%

l' 24-02-85 (= 5.5 % Full Pcwer ' 5% 4. 8 .2 4%

25-02-85 s (= 5.5 % Full Pcuer ,,I 5%, 5 8 8% '

85-30-85 (= 5.5 % Full Power 5%  ; 5 8 2% ,,

\

26-30-85 (=5.5%FullPower\ 5% 5 0 03 38-31-85 (=5.5% Full?cuerf, ~5 % 4. 9 .1 21 23-29-85 (= 5.5 % Full Powerc - 5% 5 0 0%

29-33-85 (= 5.5 % Full Pcwer 5% 5 0 0%

12-19-85 (= 5.5 % Full Power 5% 4.75 .25 5%

12-22-85 (= 5.5 % Full Power 5% 4. 9 .1 21 12-23-85 (= 5.5 % Full Pcwer 5% 4. 9 .1 2%

31-29-86 (= 5.5 % Full Pcwer 55 4. 9 .1 2%

22-28-86 (= 5.5 % Full Pcwer , 5% 5 0 0%

23-29-86 (= 5.5 % Fu!! Power 5% , 5 0 9%

04-25-86 (= 5.5 % Full Power 5% [5 0 01 05-27-86 (= 5.5 % Fa!! Power 5% 4.9 .1 2%

26 23-86 (= 5.5 % Full Power 5% 5 0 0%

97-25-86 (= 5.5 % Full Pcwer '5% 4. 8 .2 4%

s V

."CSITIVE RATE TRIP 09-11-84 (= 5.5 % Full Po e 5% 5.1 .1 2%

09-26-84 (= 5.5 % F211.73k 55 5 0 0 10-29-84 (= 5.5 % Full Power 5% 5.1 .1 2 12-03-84 (= 5.5 % Full Power 55 4. 9 .1 2 12-22-84 (= 5.5 % Full Pc=er 5% 5 0 2

[ 21-31-85 (= 5.5 % Full Power 55 4. 9. .! 2%

l 03-04-85 (- 5.5 % Full ?cwer 5% 5 3 31

. 24-32-85 f= 5.5 % Full Pcmer 5% 4. 9 .! 2%

l 25-02-85 (= 5.5 4 Jull Power 5% 5.2 .2 4%

05-33-85 (= 5.5 % Full Power s 5% 5 3 0%

^ '

, sy 05-20-85 = 5.5 % Full Pc a r 5% 5 0 0%

25-32-85 (= 5.5'% Fall Pd.er 5% 5 2 3%

08-21-85 C-!.51Fu!!P$er 5% 5.1 .1 2%

08-2 % 35 (* 5. E % Fall 6.er 5% 5 0 0%

Jil, s W32-35 (= !.3 % Full "c er 51 5 0 0%

,M -

hoe

~ , . _ . _

T*;UfENT 3 PERICDC ~EST 3 TE3T DESCRIPT1CN " ATE TMGE UNITS 32T PCINT MEASURED ERRCR % ERROR i;CTICN TrKEN 1PT38.2,4 POSITIVE RATE TRIP 12-19-85 (= 5.5 % Full Pow r 5% 5.25 .25 5%

12-22-85 (= 5.5 % Full Pce r 5% 4. 9 .1 2%

12-23-85 (= 5.5 % Full Pce r 5% 5.1 .1 2%

81-29-86 (= 5.5 % Full Pe e r 5% 4. 9 .1 2%

82-28-86 (= 5.5 % Full Pow e 5% 5 9 0%

83-29-86 (= 5.5 % Full Poo r 51 5.1 .1 2%

84-25-86 (= 5.5 % Full Powr 5% 5 0 0%

95-27-86 (= 5.5 % Full Pc w r 5% 5 0 8%

86-23-86 (= 5.5 % Full Pcer 5% 5 9 2%

87-25-86 (= 5.5 % Full Pce r 5% 5 0 0%

IPT31.;,1 CVEWR ^T TR*P 29-07-84 (= 7.473 VDC 7.273 7.275 .082 .33 18-15-84 (= 7.473 VDC 7.273 7.274 .081 .91 11-13-84 (= 7.473 VDC 7.273 7.277 .004 .85 12-14-84 (= 7.473 VDC 7.273 7.381 .028 .38 01-14-35 (= 7.473 VDC 7.273 7.28 .007 .1 %

82-13-85 (= 7.473 VDC 7.273 7.275 .882 .83 03-28-85 (= 7.473 VDC 7.273 7.27 .883 .84 -

04-17-85 (= 7.473 VDC 7.273 7.27 .883 .84 05-14-85 (= 7.473 VDC 7.273 7.274 .001 .01 06-12-85 (= 7.473 VDC 7.273 7.275 .382 .33 97-15-85 (= 7.473 WC 7.273 7.276 . 303 .04 08-12-85 (= 7.473 VDC 7.273 7.274 .001 .21 09-18-85 (= 7.473 VDC 7.273 7.273 0 0%

13-15-85 (= 7.473 VDC 7.273 7,275 .002 .03 12-16-35 (= 7.473 VDC 7.273 7.275 .302 .03 31-13-86 (= 7.473 VDC 7.273 7.273 3 0%

02-11-S6 (= 7.473 VOC 7.273 7.275 .002 .23 03-13-86 (= 7.473 VDC 7.273 7.272 .001 .01 04-15-36 (= 7.473 VDC 7,273 7.274 .001 .31 35-12-86 (= 7.473 VDC 7.273 7.271 .002 .03 05-09-86 (= 7.473 VDC 7.273 7.27 .003 .24 27-09-55 (= 7.473 VDC 7.273 7.275 .002 .03 03-19-56 (= 7.473 VDC 7.273 7.274 .021 .21 CVERTEMP ^T TRIP 09-87-84 (= 7.433 VDC 7.233 7.235 .002 . 33 10-15-84 (= 7.433 VDC 7.233 7.235 . 002 .23 11-13-84 (= 7.433 VDC 7.233 7.239 .006 .03 12-14-84 (= 7.433 VDC 7.233 7.229 .006 .23 31-14-85 (= 7.433 VDC 7.233 7.235 .002 .03 02-13-85 (= 7.4:3 WC 7. 23'; 7.223 .005 .07 23-20-85 (= 7.433 VDC 7.233 7.229 .004 .26 04-17-85 (= 7.433 VDC 7.233 7.225 . 003 .11 05-14-35 (= 7.433 WC 7.233 7.231 .032 .23 06-12-85 (= 7.433 VDC 7.233 7.234 .001 .21 37-!!-55 (= 7.4 3 WC 7.233 7.241 .008 .!!

08-12-85 (= 7.433 VD" 7.233 7.240 .007 .1 %

29-13-85 (= 7.433 VDC 7.233 7.246 .0:3 .8 10-15-55 (= 7.433 VDC 7.233 7.234 .001 .0:

12-15-35 (= 7.4:3 VDC 7.233 7.232 .02 .3:

21-12-25 (= 7.433 G C 7.233 7.24 .007 .1 %

02-11-36 (= 7.433 VDC 7.233 7.2;5 .002 .03 d

A4HIa . _ _

A"A00ENT 3 PERIODIC TES~ 4 TEST DESCRIPTIDN DATE RANGE IMITS SET POINT EASulED ERRGR % ERRCR ACTIDN TAKEN 19T31.1.1 CVERTDP ^T TRIP 13-86 (= 7.433 VDC 7.233 7.235 802 .03 04-15-86 (= 7.433 VDC 7.233 7.233 0 01 05-12-86 (= 7.433 VDC 7.233 7.212 .021 .29 06-09-86 (= 7.433 VDC 7.233 7.224' .009 .12 07-09-86 (= 7.433 VDC 7.233 7.233 0 01 00-19-86 (= 7.433 VDC 7.233 7.235 .002 .03 IPT31.1.2 DVE R R ^T TRIP 09-13-84 (= 7.473 VDC 7.273 7.263 .01 .14 18-15-84 (= 7.473 VDC 7.273 7.264 .309 .12 11-20-84 (= 7.473 VDC 7.273 7.27'5 .002 .03 12-18-84 (= 7.473 VDC 7.273 -7.283 .01 .14 01-14-83 (= 7.473 VDC 7.273 7.265 .008- .11 02-13-85 (= 7.473 VDC 7.273. 7.275 .002 .03 33-19-85 (= 7.473 VDC 7.273 7.277 .004 .06 34-18-85 (= 7.473 VDC 7.273 7.273 0 0$'

25-15-85 (= 7.473 V I 7.273 7.267 .006 .08 06-12-85 (= 7.473 VDC 7.273 7.264 .009 .12 I

~

07-15-85 (= 7.473 VDC 7.273 7.269 .004 .05 08-13-85 (= 7.473 VDC 7.273 7.268 .305 .07 09-18-85 (= 7.473 VDC 7.273 7.256 .017 .23 -

18-16-85 (= 7.473 VDC 7.273 7.272 .001 .01 12-19-85 (= 7.473 VDC 7.273 7.272 .301 .01 01-13-86 (= 7.473 VDC 7.273 7.276 .303 .04 02-11-86 (= 7.473 VDC 7.273 7.273 0 01 03-13-86 (= 7.473 VDC 7.273 7.274 . 001 .01 04-15-86 (= 7.473 VDC 7.273 7.275 .002 .03 05-12-86 (= 7.473 VDC 7.273 7.272 .001 .01 36-09-86 (= 7.473 VDC 7.273 7.274 .001 .01 37-10-86 (= 7.473 VDC 7.273 7.274 .231 .01 CVERTEMP ^T TRIP 09-13-84 (= 7.433 VDC 7.233 7.235 .302 .03 18-15-84 (= 7.433 VDC 7.233 7.234 . 301 .01 11-20-84 (= 7.433 VDC 7.233 7.229 .004 .06 12-18-84 (= 7.433 VDC 7.233 7.247 .014 .19 01-14-85 (= 7.433 VDC 7.233 7.255 .022 .3 %

02-13-85 (= 7.433 VDC 7.233 7.23 .003 .24 03-19-85 (= 7.433 VDC 7.233 7.24 .007 .1 %

34-18-85 (= 7.433 VDC 7.233 7.239 .006 .28 05-15-85 (= 7.433 VDC 7.233 7.24 .007 .1 %

26-12-85 (= 7.433 VDC 7.233 7.22 .013 .18 07-15-85 (= 7.433 VDC 7.233 7.232 .001 .01 38-13-85 (= 7.433 VDC 7.233 7.226 .007 .1 %

09-18-85 (= 7.433 VDC 7.233 7.237 .004 .06 10-16-85 (= 7.433 VDC 7.233 7.233 0 0%

12-19-85 (= 7.433 VDC 7.233 7.232 .001 .01 21-13-86 (= 7.433 (T4 ~.233 7.226 .307 .1 %

C2-11-86 (= 7.433 VDC 7.233 7.234 .001 .01 23-13-86 (= 7.433 VDC 7.233 7.239 . 006 .38 04-15-86 (= 7.432 VDC 7.233 7.235 .002 .03 25-12-56 (= 7.433 VDC 7.233 7.233 0 0%

25-09-85 (= 7.433 VDC 7.233 7.232 .J01 .01 37-13-36 (= 7.433 *CC 7.233 7.237 .204 .05 N

ATTACHOT 3 PERIODIC TEST I TEST DESCRIPTI31 DA'E RANGE tmITS SET POINT EASURED ERRCR % ERRCR ACTION TAl'IN 1PT31.1.3 CVEENR ^T TRIP 09-14-84 (= 7.473 VDC 7.273 7.28 .007 .1 10-16-84 (= 7.473 VDC 7.273 7.278 .005 .87 11-20-84 (= 7.473 VDC 7.273 7.278 .005 .07 12-18-84 (= 7.473 VDC 7.273 7.277 .304 .05 01-23-85 (= 7.473 VDC 7.273 7.27 .003 .94 02-14-85 (= 7.473 VDC 7.273 7.273 9 05 03-19-85 (= 7.473 VDC 7.273 7.279 .006 .08 94-18-85 (= 7.473 VDC 7.273 7.275 .802 .33 25-16-85 (= 7.473 VDC 7.273 7.279 .006 .98 86-18-85 (= 7.473 VDC 7.273 7.269 .004 .85 87-16-85 (= 7.473 VDC 7.273 7.265 .008 .11 38-13-85 (= 7.473 VDC 7.273 7.275 .002 .83 09-18-85 (= 7.473 VDC 7.273 7.275 .302 .03 10-16-85 (= 7.473 VDC 7.273 7.276 .283 .24 12-18-85 (= 7.473 VDC 7.273 7.28 .007 .1 %

91-14-86 (= 7.473 VDC 7.273 7.274 .N1 .81 02-12-86 (= 7.473 VDC 7.273 7.268 .005 .07 23-14-86 (= 7.473 VDC 7.273 7.271 .002 .83 04-15-86 (= 7.473 VDC 7.273 7.268 .805 .07 05-12-86 (= 7.473 VDC 7.273 7.269 .004 .05 06-10 4 (= 7.473 VDC 7.273 7.269 .004 .05 37-18-86 (= 7.473 VDC 7.273 7.252 .821 .29 08-11-86 (= 7.473 VDC 7.273 7.27 .003 .04 CVERTEMP ^T TRIP 99-14-84 (= 7.433 W C 7.233 7.237 .304 .96 12-16-84 (= 7.433 VDC 7.233 7.23 .003 .04

!!-23-84 (= 7.433 VDC 7.233 7.236 .003 .84 12-18-64 (= 7.433 VDC 7.233 7.262 .023 .4 01-23-85 (= 7.433 WC 7.233 7.234 .001 .81 22-14-85 (= 7.433 VDC 7.233 7.219 .014 .19 33-19-85 (= 7.433 VDC 7.233 7.23 .003 .04 24-18-85 (= 7.433 VDC 7.233 7.239 .006 .08 05-16-85 (= 7.433 VDC 7.233 7.244 .311 .15 06-18-85 (= 7.433 VDC 7.233 7.232 .001 .01 37-16-85 (= 7.433 VDC 7.233 7.24 .007 .1 %

03-13-65 (= 7.433 VDC 7.233 7.249 .216 .22 39-18-85 (= 7.433 VDC 7.233 7.235 .302 .03 10-16-85 (= 7.433 VDC 7.223 7.237 .004 .06 12-18-85 (= 7.433 VDC 7.233 7.24 .007 .1 %

01-14-86 (= 7.433 VDC 7.233 7.232 .001 .01 02-12-86 (= 7.433 VDC 7.233 7.235 .002 .33 03-14-86 (= 7.433 VDC 7.233 7.229 .004 .06 04-15-86 (= 7.433 WC 7.233 7.237 .004 .06 05-12-86 (= 7.433 VDC 7.233 7.234 .001 .01 06-!3-86 (= 7.433 W C 7.233 7.233 3 0%

07-10-86 (= 7.433 W C 7.233 7.234 .001 .01 03-11-26 (= 7.433 VDC 7.233 7.234 .021 .01 D*31. 3.1 Q P.C'.i 10-13-24 )= 5.521 VDC 5.625 5.617 .003 .14 11-13-84 )= 5.501 VDC 5.623 5.626 . *21 . 22 12-14-84 >= 5.501 VDC 5.625 5.625 3 0 01-14-85 >= 5.521 WC 5.625 5.626 .301 . 02

e AT*TLET 3 GIICDIC TE57 0 TEST DESCRIPTION DATE RANGE WITS SET POINT MEASWED ERROR 5 ERROR ACTION iMEN iPT31.3.1 LOW R0W 02-13-85 >= 5.501 VDC 5.625 5.621 .004 .07 03-19-85 >= 5.501 VDC 5.625 5.621 .004 .07 04-17-85 )= 5.501 VDC 5.625 5.626 .001 .32 05-14-85 )= 5.501 VDC 5.625 5.621 .004 .07 06-12-85 )= 5.501 VDC 5.625 1 626 .001 .02 07-15-85 >= 5.501 VDC 5.625 5.619 .006 .!!

08-12-85 >= 5.501 VDC E625 5.62 .005 .09 09-11-85 >= 5.501 VDC 5.625 5.629 .304 .87 10-15-85 >= 5.501 VDC 5.625 5.623 .002 .04 12-16-85 >= 5.501 VDC 5.625 5.62 .025 .09 01-13-86 )= 5.501 VDC 5.625 5.618 .007 .12 02-11-86 )= 5.501 VDC 5.625 5.622 .003 .25 03-13-86 >= 5.501 VDC 1 625 5.628 .003 .25 84-14-86 )= 5.501 VDC 5.625 5.623 .302 .34 05-12-86 )= 1 3 1 VDC 5.625 5.623 .002 .24 36-09-86 )= 5.501 VDC 5.625 5.626 .001 .02 07-09-86 >= 5.501 VDC 5.625 5.626 .001 .02 38-19-86 )= 5.501 VDC 5.625 5.626 .001 .02 IPT31.3.2 LCW R0W 10-13-84 >= 5.501 VDC 5.625 1 619 .006 .11 11-13-84 )= 5. 21 VDC 5.625 5.630 .005 .99 12-14-84 >= 1 501 VDC 5.625 5.629 .004 .07 01-14-85 >= 5.501 VDC 5.625 5.628 .003 .85 02-13-85 >= 5.501 VDC 5.625 5.626 .001 .22 03-19-35 >= 5.581 VDC 5.625 5.622 . 3C .05 25-15-65 >= 5.501 VDC 5.625 5.621 .304 .07 06-12-85 )= 5.531 VDC 5.625 5.628 .303 .05 07-15-85 >= 5. 3 1 VDC 5.625 5.628 .003 .25 28-12-85 )= 5.501 VDC 5.625 5.627 .002 .04 39-11-65 )= E 501 VDC 5.625 L625 2 3%

10-15-85 )= 5.501 VDC 5.525 5.629 .004 .07 12-16-85 >= 5.501 VDC 5.6:S E615 .01 .13 31-13-86 >= 5. 2 1 VDC 5.625 5.621 .004 .07 22-11-86 )= 5.501 VDC 5.625 5.621 .??4 .27 23-13-86 >= 5.531 VDC 5.625 5.612 .213 .23 04-14-86 >= 5.501 VDC 5.625 1621 .004 .27 05-12-86 )= 5.501 VDC 5.62: 5.618 .007 .2 06-39-86 )= 5.501 VDC 5.625 5.621 .004 .07 37-09-86 )= 5.501 VDC L625 5.622 .223 .35 08-11-86 )= 5.501 VDC 5.625 5.622 .N3 .25

!?'31. 3. 3 LOW R34 10-13-84 >= 5.501 VDC 5.625 5.624 .001 .22 11-13-84 )= 5.531 VDC 5.625 5.628 .003 .C5 12-14-84 >= 5.521 VDC 5.625 5.629 .224 .27 21-14-85 >= 5.501 VD 5. C5 1 628 .003 .25 22-13-85 i= 5.501 VDC 5.625 5.63 . 005 .09 23-19-85 >= 5.501 VDC 5.625 5.628 .003 .05 04-17-35 )= 5.521 VDC 5.625 1634 .039 .16 25-;5-85 >= 5. 21 VDC 5.625 5.C9 .204 .27 wn

AT7C-ENT 3 FERICDI:

  • 5T I TEST D2SCRIPTIDN TATE RANGE UNITS SET PCINT MEASURED ERRCR % ERRDR ACTIM TWIN 1PT31.323 LOW RW 86-12-85 )= 5.581 VDC 5.525 5.63 .085 .39 87-15-85 >= 5.581 VDC 5.625 5.629 .084 .87 88-12-85 )= 5.581 VDC 5.625 5.622 .003 .85 09-11-85 )= 1 2 1 VDC 5.625 5.629 .884 .87 10-15-85 >= 5.581 VDC 5.625 5.632 .007 .12 12-16-85 >= 5. 2 1 VDC 5.625 5.62 .885 .89 01-13-86 >= 5.581 VDC 5.625 5.626 .881 .82 82-11-86 >= 5.581 VDC 5.625 5.621 . 384 .87 03-13-86 )= 5.501 VDC 5.625 5.525 8 81 84-14-86 >= 5.581 VDC 5.625 5.627 .882 .34 85-12-86 )= 5.581 VDC 5.625 5.624 .001 .02 06-09-86 )= 5.581 VDC 5.525 5.623 .382 .04 07-09-86 >= 5.581 VDC 5.525 5.627 .002 .94 08-18-86 )= 5. 21 VDC 5.625 5.626 .001 .82 IPT3.3.4 LDW RCW 13-15-84 >= 5.*31 VDC 5.625 1 626 .001 .82 11-15-84 > = 5. 21 VDC L525 5.622 .883 .85 '

12-17-84 > = 5.21 VDC 5.525 5.522 .003 .35 31-14-85 >= 5. 2 1 CC 5.625 5.623 .002 .84 02-13-85 )= 5.581 VDC 5.625 5.623 .002 .84 93-28-85 >= 5.581 VDC 5.625 5.52 .305 .09 04-18-85 >= 5.501 VDC 1625 1 623 .082 .04 05-15-85 )= 5.581 VDC 5.525 5.519 .006 .11 06-12-85 )= 5.501 VDC 5.625 5.521 .004 .37 07-15-85 )= L 21 VDC 5.625 5.619 . 306 .!!

08-13-85 >= 5.501 VDC 5.525 5.623 .202 .24 09-18-85 ) = 5.21 VDC 5.525 5.622 .003 .85 10-15-85 >= 5.501 VDC 5.525 5.623 .002 .24 12-17-85 )= 5. 21 C C 5.625 5.622 .223 .05 01-13-86 )= 5. 2 1 VDC 5.625 5.621 .204 .27 32-11-86 >= 5.21 VDC 5.525 5.E24 .001 . 22 33-14-86 >= 5. 2 1 VDC 5.525 5.623 . 002 .24 34-15-86 >= ". 2 1 VDC 5.625 5.624 . 201 . 02 05-12-86 >= 5. 2 1 VDC 5.625 5.521 .004 .27 06-10-86 )= 5. 2 1 VDC 5.625 5.523 .022 .04 07-19-86 )= 5.581 VDC 5.525 5.523 .002 .24 38-11-85 )= 1 53 VDC 5.625 5.622 .003 .25

PT3
.2.0 LCW RCW 09-13-34 >= 3.21'!C 5.525 5.625 0 0 10-15-84 >= 5.531 VDC 5.625 5.627 .002 .24 11-15-84 )= 5.521 C 5.525  !.528 .003 .05 12-17-84 >= 5.531 VDC 5.525 5.629 . 004 .07 01- 4-65 >= 5.501 VCC 5.625 5.627 .002 .34 02-13-85 >= 5.581 VDC 5.525 1628 .003 .35 03-19-55 ) = 1501 CC 1 625 5.628 .003 .25 04-13-35 >= 5.531 VDC  !.525 5.63 .025 .33 05-15-85 >= 5.501 VD" * "5 5.523 .002 .24 36-12-35 )= !.501 C 5.525 5.522 .003 .25 27-15-35 )= 5.531 C C 5.525 5.63 .005 .09

ATTX MIE'i' 3 PERI 3DIC 'EST 4 TEST CESCRIPTION DATE RANGE LEITS SET ECINT MEASURED ERROR % ERROR ACTION TAKEN 19T31.3,5 LCW RSI 88-13-85 >= 5.581 VDC L625 5.623 .882 .34 89-18-85 )= 5. 2 1 VDC 5.625 5.629 .384 .87 18-16-85 )= 5.581 VDC 5.625 5.628 .883 .35 12-17-85 )= 5.',31 VDC L 625 5.629 .884 .27 81-13-86 )= 5.581 VDC 5.625 5.6P8 .883 .85 82-!!-86 >= 5.581 VDC 5.625 5.63 .885 .89 83-14-86 >= 5.581 VDC 5.625 5.628 .883 .35 84-15-86 >= 5.581 VDC 5.625 5.63 .885 .89 85-12-86 >= 5.581 VDC E625 5.629 .884 .87 86-19-86 )= 5.21 WC 5.625 5.628 303 .85 87-18-86 )= 5.581 VDC 5.625 5.625 8 8%

37-18-86 >= 5.581 VDC E625 4.747 .878 15.6 CCMPARITOR EPLACED 88-11-86 >= 5.581 VDC 5.625 5.626 .001 .32 19731.3.5 LCW RDW 89-87-84 )= 5.581 VDC 5.625 5.618 .887 .12 18-15-84 >= *.581 VDC 5.625 5.619 .886 .11 11-15-84 >= 5.541 VDC 5.625 5.621 .884 .87

~'

12-17-84 )= 1 581 VDC 5.625 5.622 .003 .85 81-14-85 >= 5. 21 VDC 5.625 5.621 . 884 .87 82-13-85 >= 1 581 VDC 5.625 5.62 .885 .89 33-19-85 )= 1 581 VDC 5.625 ' 62 . 825 .89 24-18-85 >= 5. 2 1 VDC 5.625 5.62 .085 .83 25-15-85 >= 5.*81 C C 5.625 5.617 .008 .14 06-12-85 >= 5.581 VDC 5.625 5.619 .086 .11 97-15-85 )= 5.581 VDC 5.625 5.618 .007 .12 28-13-85 )= 5.581 VDC E 625 E62 .885 .09 09-18-85 > = 5.21 WC 5.625 5.623 .382 .24 10-16-85 >= 5. 2 1 VDC 5625 5.623 .232 .24 12-17-85 >= 5.581 VDC 4625 5.627 .882 .24 21-13-86 )= 5.581 VDC 5;625 5.627 .002 .84 32-11-86 )= 5.21 CC 5.625 5.628 .003 .25 22-:4-86 )= 5.581 VDC ' 62*

. 5.626 .00: .02 04-15-86 )= 5. 3 1 VDC 5.625 5.628 .303 .25 05-12-86 >= 5.581 VDC 5.605 5.62" 0 01 06-18-86 >= 5.521 VDC 5.625 5.624 .221 .32 1 87-18-86 >= 5.581 E C 1 625 5.626 .281 .22 08-!!-86 )= 1 9 1 VDC 5.625 5. 628 . 203 .25 19T31.2.T LA RCW 09-27-84 >= 5.581 VDC 5.625 5.622 .223 .25 13-16-S4 ) = 5. 91 GC 5.625 5.621 .204 .27

!!-16-84 )= 5.581 C C 5.625 5.624 .221 .22 12-18-84 )= 5. 31 VDC 5.625 5.624 .221 .22 21-23-65 )= 5.501 VDC 5.E25 1 623 .002 .24 02-:4-85 ) = 5. 91 CC 5.625 5.624 .081 .22 23-;3-35 ): L 21 Z C '" ' 626 .001 .22 24-18-85 )= 5.",21 VDC 5.625 5.624 .231 .02 05-16-35 >= 5.52: EC 5.625 5.619 .006 .1 26-17-85 > = 5. 21 WC 5.625 5.625 0 3%

27-15-85 )= 5. U: VD: 5.625 5.623 .002 .24

__ _ _ a

ATTAC-ET 3 PER!DDIC TEST 0 TEST DE3CRIPTI N DATE RANGE LHITS SET POINT MEASL' RED ERROR % ERROR ACTI N Tff,Di IPT31.3.7 LCW FLOW 08-13-85 )= 5.501 VDC 5.625 5.626 .201 .32 09-18-85 >= 5.501 VDC 5.625 1623 .302 .04 10-17-85 )= 5.501 VDC 5.625 1613 .012 .21 12-18-85 >= 5.501 VDC 5.625 5.623 .002 .04 01-15-06 . )= 5.501 VDC 1 625 5.625 0 01 02-12 >= 5.501 VDC 5.625 5.626 .301 .02 03-14-86 >= 5.501 VDC 5.625 1 623 .002 .04 04-16-86 >= 5. 21 VDC 5.625 5.625 0 01 05-12-86 >= 5.501 VDC 5.625 5.622 .003 .05 06-10-86 )= 5.501 VDC 5.625 5.626 .301 .02 07-10-86 )= 5. 21 VDC 5.625 5.624 .001 .32 38-11-86 >= E 501 VDC 5.625 5.626 . 801 .32

!PT31.3.8 LalFLOW 09-13-84 >= 5. 2 1 VDC 5.625 5.622 .003 .f5 10-16-84 >= 5.501 VDC 5.625 5.627 .002 . 34 11-16-84 >= 5.501 VDC' 5.625 1625 0 0 12-18-84  != 5.501 VDC 5.625 5.622 .003 .35 01-23-85 )= 5.501 VDC 1 625 5.626 .001 .02 -

32-14-85 >= 5.501 G C 5.625 5.629 .004 .07 23-19-85 )= L SI VDC 5.625 5.622 .003 .35 -

34-18-85 >= E 531 VDC 5.625 5.626 .301 .02 05-16-85 > = 5.21 WC 5.625 5.624 .001 .02 06-17-85 >= 5.501 VDC 5.625 5.627 .202 .04 97-15-85 >= 5.521 VDC 5.625 5.629 .004 .07 08-13-85 >= 5.501 VDC 5.625 5.632 .007 .12 09-18-85 )= 5.521 VDC 5.625 5.629 .004 .27 10-17-85 )= 5. 21 W C 5.625 5.625 0 2%

12-13-35 > = 5.21 VDC 5.625 1 629 .004 .97 31-15-86 >= 5."31 VDC 5.625 5.628 .203 .25 22-12-86 )= 5.21 WC F.625 5.61- 1005 .??

23-14-86 >= 5.521 W C 5.625 5.623 .002 .24 04-16-86 > = 5.21 VDC 5.625 5.63 .225 .e9 35-12-96 )= 5.521 VDC 5.625 5.627 .002 .34 06-12 2  % 1 521 VDC 5.625 1631 .006 .11

! 37-10-36 >= 5.*81 VDC 5.625 5.631 .346 .!!

l 98-11-86 )= 5. 2 1 VDC 5.6E5 1 629 .004 .07 l

l i

i 1P!31.2.9 LCW FLOW 29-13-84 > = 5. 501 WC 5.625 " 621

. .234 .37 13-16-84 >= 5. 21 VDC 5.625 5.621 .204 .27 i  !!-16-84 > = 5. '31 WC 5.625 5 623 .205 .29 12-13-84 >= 5. 2 1 VDC 5.625 5.623 .002 .24 31-23-85 ) = ". 531 WC L625 5.622 .003 .25 22-14-85 > = L 501 WC 5.625 ' 621

. .004 .07 03-19-85 > = 5. 501 WC 5.625 5.62 .235 .29 34-19-55 >= 5.521 W C L625 5.624 .001 .22 25-!6-85 >= 5."21 VDC ' 625

. 5.622 .233 .25 26-17-85 )= 121 WC 5.625 5.626 .001 .22 37-15-S5 >= 5.501 V;C 5. 625 5 626 .001 .22 23-!!-35 )= 5.521 VDC 5.625 5.616 .009 .16 m '

ATTTC,ENT 3 PERIODIC TEST I TEST DESCRIPTI N DATE RANGE IMITS SET POINT MEASURED ERRCR 1 eta 0R ECTION TAKDi 1PT31.3.9 L W FL N 89-18-85 )= 5.501 VDC 5.625 5.626 .001 .02 16-17-85 )= 5.581 A C 5.625 5.627 .a82 .94 12-18-85 >= 5.581 VDC 5.625 5.626 .001 .02 81-15-86' >= 5.581 VDC 5.625 5.624 .881 .82 82-12-86 )= M.581 VDC 5.625 5.627 . 882 .84 83-14-86 )= 5.581 VDC 5.625 5.625 8 8%

84-16-86 >= 5.581 VDC 5.625 5.625 0 8%

85-12-86 >= 5.581 VDC 5.625 5.622 .883 .35 96-19-86 )= 5.581 VDC 5.625 5.629 .004 .07 87-19-86 >= 5.581 VDC 5.625 5.626 .801 .82 08-!!-86 >= 5.581 VDC 5.625 5.626 .001 .02 IPT31.7.1 HIGH PRESSURE LEWL 13-13-84 (= 9.3 VDC 9. 2 9.299 .009 .1

!!-13-84 (= 9.3 VDC 9.2 9.198 .002 .82 12-14-84 (= 9.3 VDC 9.2 9.1% .004 .84 01-14-85 (= 9.3 VDC 9.2 9.202 .082 .82 02-13-85 (= 9.3 VDC 9. 2 9.197 .003 .33 83-19-85 (= 9.3 VDC 9. 2 9.283 .003 .83 34-17-85' (= 9.3 VDC 9. 2 9.199 .001 .81 05-15-85 (= 9.3 VDC 9.2 9.191 .003 .15 06-15-85 (= 9.3 W C 9. 2 9. 2 0 8%

08-12-85 (= 9.3 VDC 9. 2 9.194 .036 .37 09-18-85 (= 9.3 VDC 9.2 9.191 .089 .1 %

10-15-85 (= 3.3 VDC 9. 2 9.291 .001 .31 12-!6-85 (= 9.3 VDC 9.2 9. 2 0 3%

01-13-36 (= 3.3 VDC 9.2 9.21 .31 .11 02-1*-56 (= 9.3 VDC 3.2 9.298 .388 .89 J3-!3-66 (= 9.3 VDC 3.2 9.209 .009 .1 %

34-14-26 (= 9.3 VDC 9. 2 9.297 .207 . .28

.C-II 65 u 3.3 V;C L.2 J.2Li .228 .i!

06-39-86 (= 9.3 VDC 9. 2 9.237 .007 .23 l 07-10-36 (= 9.3 VDC 9.2 9.213 .013 .14 08-13-86 (= 9.3 VDC 9. 2 9.295 .005 .35 l

l l

i IPT31.7.2 H:3H FRESSURE LEW1. 99-07-84 (= 3.3 VDC 9.2 9.135 .005 .05 l 10-15-84 (= 9.3 VDC 9. 2 9. 2 0 3 l 11-15-64 (= 9.3 VDC 9. 2 9.198 .002 .02 12-17-84 (= 9.3 VDC 9. 2 9.198 .0J2 .02 01-14-85 (= 9.3 VDC 9.2 9.203 .003 .03 l

02-13-55 (= 9.3 VDC 3. 2 9.201 .031 .31 i 03-19-85 (= 9.3 VDC 9.2 9.205 .005 .35 j 04-18-85 (= 9.3 VDC 9. 2 9.198 .002 .32 25-15-85 (= 3.3 VDC 9.2 9.195 .005 .05 06-12-85 (= 9.3 VDC 9.2 9. 2 0 0 l 07-!!-35 (= 9.3 VDC 9. 2 9.201 .001 .01 08-13-85 (= 9.3 VDC 3.2 9.207 .037 .08 09-18-85 (= 9.3 VDC 3. 2 9.233 .003 .03 10-16-55 (= 9.3 VDC 9. 2 9. 2 0 0 12-17-65 (: 9.3 VDC 9. 2 9.2P6 .006 .07

+

A*TECMN7 3

FCRIEDI; IEST i IES7 i,E5CAIE71:h MTE RANGE 1. NITS SET PC*NT MEASL"ED ERROR % ERRCR f~.TIIN TAKEN 1;i31.7.2 HIGH PRESSUE LEVEL. 81-13-86 (= 9.3 VDC 9. 2 9.211 .011 .12 02-11-86 (= 9.3 VDC 9. 2 9.235 .005 .05 03-14-86 (= 9.3 VDC 9. 2 9.236 .006 .07 04-15-86 (= 9.3 VDC 9. 2 9.207 .307 .88 05-12-86 (= 9.3 VDC 9. 2 9.204 .004 .34 06-! H 6 (= 9.3 VDC 9.2 9.206 .006 .37 07-19-86 (= 9.3 VDC 3.2 9.207 .007 .38 98-11-86 (= 9.3 VDC 9.2 9.205 .005 .35 I?i31.7.3 HIGH FRESSURE LEVEL 10-16-84 (= 9.3 VDC 9.2 9.203 .003 .03 11-16-84 (= 9.3 VDC 9. 2 9.205 .005 .05 12-18-84 (= 9.3 VDC 9.2 9.296 .006 .07 01-23-85 (= 9.3 W C 9.2 9.21 .31 .!!

02-14-85 (= 9.3 VDC 3.2 9.205 .005 .05 03-19-35 (= 9.3 CC 9. 2 9.209 .009 .1 04-18-85 (= 9.3 VDC 9.2 9.209 .009 .1 35-16-85 (= 9.3 VDC 9.2 9.203 .303 .03

, 06-17-85 (= 9.3 VDC 9.2 9.214 .014 .15 37-16-85 (= 9.3 W C 9. 2 9.21 .31 .11 08-13-85 (= 9.3 VDC 3.2 9.219 .019 .21 33-19-85 (= 9.3 VDC 9.2 9.215 .215 .16 10-17-85 (= 9.3 VDC 9. 2 9.21 .01 .11 12-18-85 (= 9.3 VDC 9. 2 9.235 .005 .05 01-14-86 (= 9.3 VDC 9. 2 9.202 . 002 .82 32-!2-36 (= 9.3 VDC 9. 2 9.204 .004 .34 03-14-86 (= 9.3 VDC 9.2 9.C04 .004 .24 04-16-S6 (= 9.3 C C 3.2 9.224 .004 .34 05-13-36 (= 9.3 VDC 9. 2 9.207 .007 .08 06-16-36 (= 9.3 VDC 3.2 9. 2 ' 3 3%

07-13-86 (= 9.3 VDC 9. 2 9.204 .004 .04 03-11-36 (= 9.3 C C 3.2 9. 2 0 0%

l 2"!30.1 C"LRCE RNG FLUX N31 08-07-84 77000 - 130000 CPS 1N0?0 100000 0 0

, 33-14-84 77000 - 12303 CPS 100000 100000 3 3 l 08-22-84 77000 - 1:N00 CPS 100000 100000 0 0 a8-29-84 77a00 - 13a00a CPS :20e03 2n0 -10 m :0 09-25-84 77000 - 130000 CPS :20000 100000 0 0 l 13-33-84 77000 - 130000 CPS 120000 95000 -5000 5 10-09-84 77000 - 130000 CPS IN000 100000 0 2 13-!6-84 77000 - 130000 CPS 102023 100No 0 3 12-29-84 77003 - 12000 CPS 100000 102000 0 3 13-30-84 77300 - 130N 0 CPS 120000 100000 0 0 11-!S-34 77000 - 1 2030 C?S 10N00 96N0 -4000 4

, 12-11-84 77000 - 132000 CPS :20000 200300 0 3 l

01-07-85 77002 - 130003 C75 100N0 100003 3 01 02-07-85 77000 - 133030 C;S 102M3 100000 3 2%

l 23-05-35 77000 - 130003 '.d5 ;00000 90000 - 2 00 2%

l 03-29-63 77000 - 120000 CTS 102000 1000f0 0 0%

04-13-85 770G - 130000 CPS :00000 95NJ -5000 5%

l m _. __ _ __

A'7fCr:s? 3

?ERIC31C 'E57 3 7E3' LESCRIP7 3 CA7E RANGE UNI 7S SET PCIN7 EASUPED ERRCR 1 ERRCR AC7 ION TfEEN 2P730,1 SOURCE IDE FLl!X N31 04-26-85 77000 - 130000 CPS 130000 100000 0 0%

05-07-85 77000 - 130000 GS 100000 120000 0 0%

06-03-85 77000 - 130000 CPS 100000 99000 -1000 11 07-03-85 77000 - 138300 CPS 100000 99000 -1000 1%

07-26-85 77000 - 130000 C?S 100000 100000 0 0%

10-02-85 77000 - 130000 CPS 100000 990 -500 1 10-11-85 77000 - 130000 CPS 108000 36000 -4000 4 11-11-85 77000 - 130000 CPS 100000 95000 -5000 5 12-12-85 77000 - 120000 CPS 100000 96000 -4000 4 21-13-86 77000 - 130000 CPS 100000 100000 0 0%

02-14-86 77000 - 130000 CPS 100000 99000 -1000 12 33-16-86 77200 - 130000 C?S 100000 99000 -1000 11 23-29-86 77000 - 120000 CPS 100000 100000 0 0%

24-01-86 77000 - 120000 CPS 100000 100000 0 0%

34-11-86 77200 - 130000 C?S 100000 20000 0 0%

35-02-86 77300 - 130000 C?S 120000 99000 -! **9 - 1%

25-29-86 77 N 0 - 130000 CPS 100000 100000 . O%

06-29-86 77000 - 130000 CPS 100000 58000 -10000 10 %

27-31-56 77000 - 123000 C?S 100000 99000 -1000 1%

EDURCE TNG FLUI N32 08-07-84 77000 - 120000 CPS 120000 100000 0 0 08-14-34 77000 - 120000 C?S 100000 !20000 0 0 08-22-84 77000 - 130000 CPS l20000 100000 0 0 08-29-84 77000 - 132000 CPS 100000 120000 0 0 03-25-64 77200 - 120000 C?S 102000 120000 0 0 10-03-84 77NO - 130000 CPS 100000 35000 -5000 5 12-09-34 77020 - 123000 CPS 100000 130000 0 3

0-15-84 77J00 - 130000 CPS 120000 100000 0 0 10-29-84 77000 - 130000 CPS l00000 100000 0 0 12-20-84 77202 - 120200 C?S 10N00 100000 0 0 11-!6-64 77200 - 120400 CPS 100000 92?00 -2200 2 12-11-84 77Me - 120000 CPS lM400 100000 0 0 21-07-S5 77000 - 130020 C?S 130008 100000 0 0%

l 22-27-35 77002 - 120020 C?S IX000 170000 0 0%

03-06-85 77020 - 120000 C?S 120000 98000 -2000 2%

l 23-29-65 77200 - 132000 C?S 100000 100000 0 2%

l' 04-18-85 77000 - 120200 GS 120200 SE000 -4020 4%

l 04-26-85 77000 - 120002 C?S 100200 35000 -5000 5%

25-07-85 77000 - 130000 CPS 120000 96000 -4000 4%

36-03-85 77000 - 130200 CPS 100000 100004 0 2%

27-03-85 77000 - 1:0000 C;S 102000 S5000 -5000 5%

37-26-85 77000 - 122000 C?3 10M00 IN000 2 2%

10-02-85 77000 - 120000 CPS 100000 93"24 -500 1 10-11-85 77000 - 120000 CPS 100000 ;c0000 0 0 1-!!-85 77000 - 12N00 C?S 102000 93220 -2200 2 l 12-12-35 77X0 - ::M 00 C?S 100000 99000 -1220 1 31-13-86 7'000 - 120N 0 CPS 1N200 122000 0 3%

02-14-G6 17000 - 133003 C?S 100000 100000 0 0%

33-16-36 77220 - 1202N CPS l22000 92000 -12000 10 %

03-23-85 77000 - 120000 "?S l00000 100000 3 3%

24-01-36 77000 - 130000 C?S 10 200 104048 2 35 04-11-36 77200 - ::0002 2?S  ::0204 72000 -!200 5%

5 22-65 77000 - 120200 CPS 100200 100000 0 0%

2"-29-36 77X2 - 120222 "?S 100000 100000 0 21 06-11-85 77200 - 120N 8 CPS 102200 35000 -ENO 5%

27-31-36 772N - 120200 C?3 100002 100000 2 0%

N

A*TACc'ET 3 FER?C;! E3T I TEST DE3CH:PTICN DA*E RANGE INITS SET POINT MEASL' RED ERRCR % ERRCR ACTICN TAKEN 2PT30,2. HI FWI TRIP 88-86-84 (= !!8 % Full Power 103 1 139 3 0 89-88-84 (= 110 % Full b er 189 % 28 -89 81.6 PHYSICS TESTS 83-87-85 (= 1:3 % Full Pcwer 129 189 0 0 84-04-85 (= 118 % Full Pee r las 189 0 0 85-03-85 (= 110 % Full Pcaer 109 103 0 3 86-83-85 (= 110 % Full Paer 189 189 0 8 07-03-85 (= 110 % Full Pcwer 139 103 3 0 33-06-85 (= 118 % Fall Power 139 189 8 3 C3-84-85 (= 118 % Full Pcaer 123 109 0 0 10-34-85 (= 110 % Full Pour 139 139 0 8 11-05-85 (= 110 % Full Power 103 103 0 0 12-35-85 (= 1:3 % Full Pcwer 189 139 0 3 21-18-86 (= !!0 % Full Power 103 % 109 0 31 32-87-86 (= !!3 % Full Power 189 % 189 0 3%

23-29-86 (= 113 % Fall Power 139 % 109 2 2%

04-01-36 (= 18 % Full Power 189 % 19.9 -89.1 31. 7 PHYSICS 'ESTS 05-02-86 (= *:0 1 Full Power 103 % 109 0 3%

36-34-86 (= 113 % Full Power 109 % 129 0 3%

07-19-86 (= 1:0 % Full Power 129 % 139 0 0%

38-85-86 (= 118 % Full Power 109 % 109 0 8%

~

C ATrK RA'E TRIP 33-86-84 (= 5.5 % F211 Power 5% 5 0 0 33-38-84 (= 5.5 % Full Pcwer 5% 4. 3 .2 4 03-27-85 (= L 5 % Full Power 5 5 0 8 34-04-85 (= 5.5 % Full ?ower 5 5 3 8 05-03-85 (= 5.5 % Full Pcwer 5 5. ! .1 2 25-03-85 (= 5.5 % Full Pcder 5 5 3 3 37-03-85 (= 5.5 % Full P: er 5 5 0 2 28-06-65 (= 5.5 % Full Power 5 5 3 2 09-04-SS (= 1 5 % Full Pc er 5 4. 9 .1 2 13-24-85 (= 5.5 % Fu!! Pcwr 5 4. 9 .1 2 11-05-85 (= 5.5 % Fall Pcwer 5 4.3 .! 2

2-35-85 (= 5.5 % Full Pcwer 5 5 0 3 31-;S-36 (= 1 5 % Full Fo er 5% 4.5 .5 10 %

32-07-38 (= 5.5 % Fa!! h er 5% 4. 3 .2 4%

2 36 (= 5.5 % Full Pcwer 51 5 0  %

04-01-36 (= 5.5 % Full b er 5% 4. 3 .2 4%

25-32-86 (= 5.5 % Full b cr 55 5 3 01 06-34-86 (= 5.5 % Full h er 5% 4. 9 .1 2%

07-19-86 (= 5.5 % Full P:aer 5% 5 0 3%

l 38-85-96 (= 5.5 % Full ?o er 5% 5 3 2%

l F 3:!PE RATE TRIP 08-46-84 (= L 5 % Fall h er 5% 5 0 2 l 33-38-34 (= 5.5 % Fall ber 5% 5 3 0 j 03-27-65 (= 5.5 % Full b er 5 5 0 3 24-34-85 (= 5.5 % Full ber 5 5.35 .05 1 l 05-33-35 (= 5.5 % Ft.11 b er 5 5.1 .1 2 l 26-03-55 (= 5.5 % Full Power  ! 5.1 .1 2 07-03-35 (= 1 5 % Full Pc4er 5  !.1 .: 2

( 32-06-85 (= 5.5 % Fall her 5 5. 2 .2 4 l

03-34-35 (= 5.5 % Full b er 5 4. 3 .1 2

! l3-24-85 (= 15 % Fall her 5 5 3 3 l 11-05-55 (= 5.5 % Full b er 5 4.? .! 2 i

12-25-S5 (= 5.5 % F !: ber 5 5' 3 2 l

31-10 56 (= 5.5 % F 11 P:,wer 5% 4.75 .25 5%

l l

h

ATTAC'-E NT 3 PERIC3*C TEST 8 IE3T DESCRIPTICN DATE ENGE IMTS SET POINT EASURED L'tROR % ERRCR ACTION TPE N 2PT38,0.1 PG5ITIVE RATE TRIP 82-87-86 (= 5.5 % Full Poner 5% 5 0 01 83-29-86 (= 5.5 % Full h er 5% 5. 5 .5 10 %

84-01-86 (= 5.5 % Full h er 5% 4.9 .1 2%

~

85 4 -86 (= 5.5 % Full b er 55 5 0 8%

86-84-86 (= 5.5 % Full b er 5% 4.95 .85 15

'07-18-86 (= 5.5 % Full h er 51 4.95 .85 1%

, 88-85-86 (= 5.5 % Full Power 5% 5 8 8%

2PT38.2.2 HIFL'JITRIP 38 4 -84 (= !!B % Full Power 189 % 139 0 0 09-88-84 (= 118 % Full Power 189 5 28 -89 81.6 PHY3IC3 TESTS 11-82-84 (= 118 % Full Power 189 % 28 -83 81.6 PHY3ICS TESTS 12-04-84 (= !!8 % Full h er 109 1 189 3 8 31-87-85 (= 118 % Full Pcaer 139 189 0 0 82-06-85 (= 118 % Full Pcwer 109 109 8 8 83-87-85 (= 118 % Full h er 189 189 8 8 04-04-85 (= 118 % Full Pcwer 189 189 8 0 05-83-85 (= !!8 % Full Pcwer 189 189 8 8

~

36-83-85 (= 118 % Full Power 109 109 8 8 87-83-85 (= 118 % Full Power 189 189 8 8 88-06-85 (= 118 1 Full Pcwer 109 109 0 0 39-04-85 (= !!8 % Full h er 189 189 0 8 10-84-85 (= !!8 % Full Power 109 129 0 0

!!-85-85 (= 118 % Full Power 139 139 0 0 12-05-85 (= !!! % Fall Pc+,er 139 109 0 3 31-08 4 (= 110 % Full h er 109 1 189.25 .25 .23-32-07-86 (= 118 % Full h er 109 1 109.2 .2 .18 03-29-86 (= !!0 % Fall b er 189 % 189 3 25 34-01-86 (= 118 1 Full Pcwer 129 % 20 -39 81.6 PHYSIC 3 'ESTS 25-35-86 (= 113 % Full Pcaer 109 % 139 0 0%

26-04-86 (= 110 % Fu!! Power 109 1 139 0 0%

i 27-12-86 (= 118 % Full Power 189 % 129 2 8%

08 4 -86 (= !!8 5 Full h er 139 % 103 0 05 1

NE3AT:'iE RATE T3IP 08 4 -34 (= 5.5 % Fall h er 5% 5 3 8 09-88-84 (= 5.5 % Fall b er 5% 5 0 8 11-82-84 (= !.5 % Fu!I Pcaer 5% 5 2 8 l 12-04-84 (= 5.5 % Full her 5% 5 3 0 l

81-87-85 (= 5.5 % Fall be:- 5 5 0 8 02 4 -85 (= 5.5 % Fu!! ?c.er 5 5 0 0 03-87-85 (= 5.5 % Fall b er 5 5 3 0 04-f4-35 (= 5.5 % Fall h er 5 5 3 3

25-03-85 (= 5.5 % Fall her 5 5 3 8
i. 26-23-85 (= 5.5 % Ful! h er 5 5 0 8 37-83-85 (= 5.5 % Full h er 5 5 0 0 08-06-85 (= 5.5 % Fu!I b ee 5 5 0 0 09-24-85 (= 5.5 % Fall Ec ee 5 5 0 3 l 18-04-85 (= 5.5 1 Full h er 5 5 0 0
l.  !!-35-55 (= !.5 % F.1: b er 5 4.SS .35 1

! 12-25-85 (= 5.5 % F411 b er 5 5 0 0 21-33-56 (= 5.5 % Fa 1 ber 5% 4.75 .25 5%

C2-07-S6 (= 5.5 % Full h er 5% 5 0 0%

33-29-06 (= !.5 % Full b er 5% 5 3 3$

l

ATTPCiENT 3 PERl:DIO 25T I TEST LESCRIPTION DATE PGNGE LXITS SET POINT EASL"dED ERROR % ERRCH ACTIGN TPF.EN 2PT30.2.2 NEGATIVE RATE TRIP 84-01-86 (= 5.5 % Full Pceer 51 4.9 .! 2%

85-05-86 (= 5.5 1 Full Power 5% 5 2 0%

06-94 4 (= 5.5 % Full Pcuer 5% 4.9 .1 2%

87-10 4 (= 5.5 % Full Power 5% 5 8 8%

08-06-86 (= 1 5 % Full Power 55 5 0 0%

POSITIVE RATE TRIP 08-06-84 (= 5.5 % Full Power 5% 5 8 8 09-88-84 (= 5.5 1 Full Power 5% 4.9 .1 2 11-02-84 (= 5.5 % Full Power 51 5 8 3 12-04-84 (= 5.5 % Full Pcwer 55 5 8 0 01-07-85 (= 5.5 % Full Power 5 5 3 0

~

32-06-85 (= 1 5 % Full Power 5 5 0 0 03-07-85 (= 5.5 % Full Power 5 5 0 3 04-04-85 (= 5.5 % Full Power 5 5 3 0 05-83-85 (= 5.5 % Full Power 5 5 0 0 26-03-85 (= 5.5 % Full Pcaer 5 5 0 0 07-23-85 (= 5.5 % Full Power 5 5 0 8 08-06-85 (= 5.5 % Fall Power 5 4.9 .1 2 09-04-85 (= 5.5 % Full Power 5 4. 9 .1 2 18-04-85 (= 1 5 % Full Power 5 5 0 0 11-35-85 (= LS % Full Power 5 4.95 .05 1 12-05-85 (= 5.5 % Full Pcaer 5 5 0 8 31-08 4 (= 5.5 % Full Power 5% 4.75 .25 5%

02-07 4 (= 5.5 % Full Power 51 4.9 .1 21 33-29 4 (= 5.5 % Full Power 51 5. 5 .5 10 %

24-01-86 (= 5.5 % Full Power 51 4.8 .2 4%

. 25-25-86 (= 5.5 % Full Power 5% 4. 9 .1 25 26-04-86 (= 5.5 % Full Pcaer 5% 4. 9 .1 2%

27-12-36 (= 5.5 % Full Power 5% L2 .2 4%

38-25-86 (= 1 5 5 Full Pcwer 5% 4.9 .1 2%

i 2PT22.2.3 MI F:!:I TRIP 08-26-84 (= 112 % Fall Power 109 1 189 2 0 29-23-84 (= 110 % Full Pc er 129 % 22 -89 31.6 ?HYSIC3 TESTS l 11-02-84 (= !!3 % Fall Power 129 1 23 -33 21.6 PHY3ICS TISTS 12-84-84 (= 110 % Full Power 109 % 109 0 2 01-87-85 (= 112 % Fall Pcner 129 129 2 3 22-06-85 (= 112 % Full haer 109 108.5 .5 .48

[

23-87-85 (= 1:2 % Fall Pcaer l29 129 2 0 24-04-85 (= 1:2 % Fall Po.er 189 129 2 2 05-03-85 (= !!2 % Fall h aer 129 128.9 .! .29 i

26-23-85 (= 1:0 % Full Nwer 109 129 2 2 l 37-02-85 (= !!3 % Fall Pener 139 129.1 .1 .29 l 28-06-85 (= 1:3 % Full Power 109 129 2 0 l 29-04-35 (- !!0 % Fall Pener 129 129 2 0 l 12-24-85 (= !!0 % F211 N aer 129 109 0 0 11-25-85 (= !!3 % F d ! h er 129 129 2 3

12-25-85 (= 1:2 1 Full Pcuer 129 123 3 0 21-!!-86 (- :3 % F 41 h aar 129 5 :39.5 .5 .46 i 02-27-56 (= 110 $ F.11 Pcner 129 % 129.3 .3 .03 23-29-86 (= 110 % F41 Puer 129 5 129 3 3$

I 34-21-05  :: ::2 % Td i h eer 109 % 22 -89  ::.6 ?HY3:03 *:373 25-2 M I, (= 118 % Full Pcwer 129 % 129 3 3%

A"ACHENT 3 PERIODI:: EST I TEST DESCRIPTICN CATE RANGE WITS SET POINT ESL,E IRRCR % ERRCR ACTI(N TAKEN ,

2PT30.2.3 HI R.UX TRIP 86-84-66 (= 110 % Fall h er 139 % 109 3 81 87-19-86 (= 113 % Fall h er 189 $ 189 3 8%

88-46-86 (= 110 % Full b er 123 1 189 8 8%

NEGATIVE SITE TRIP 88-46-84 (= 5.5 % Full Power 55 5 8 8 89-80-84 (= 5.5 % Full Power 5% 5 8 8 11-82-84 (= 5.5 % Full Power 5% 5 8 8 12-84-84 (= 1 5 % Full Power 5% 4.9 .1 2 81-86-85 (= 5.5 % Full Power 5 5 8 3 01-87-85 (= L 5 1 Full h er 5 5 2 2 32-36-85 (= 5.5 % Fall h er 5 5 8 8 83-87-85 (= 5.5 1 Full Pcuer 5 5 3 2 84-34-85 (= 5.5 % Full Power 5 5 8 8 35-33-85 (= L 5 % Full Pcwer 5 4.95 .05 1 36-03-85 (= 5.5 % Full Power 5 5 8 8 07-83-85 (= 5.5 % Fw 1 b er 5 5 8 0 88-86-85 (= 5.5 % Full Power 5 5 8 8 09-04-85 (= 5.5 % Full Power 5 4. 9 .1 2 18-84-85 (= 5.5 % Full Power 5 5 8 8

!!-85-85 (= E 5 % Fall h er 5 4.99 .81 .2 12-05-85 (= 5.5 % Full Pener 5 5 8 8 -

01-11-86 (= 5.5 % Full Pcwer 5% 5 8 81 32-07-86 (= E 5 % Full Pcaer 55 5 3 8% -

03-23-86 (= E 5 % Full Pcwer 5% 5 0 01 34-01-86 (= 5.5 % Fu:1 Power 51 4. 9 .1 2%

25-05-86 (= 5.5 % Full b er 5% 4.9 .1 2%

06-04-86 (= 5.5 % Full h er 5% 4.95 .85 1%

27-19-86 (= 5.5 % Full b er 5% 5 0 8%

38-06-86 (= 5.5 % Full Power 5% 5 8 9%

POS:TI'!E RATE TRIP 03-06-84 (= 5.5 % Full h er 5% 5 8 8 39-08-84 (= 5.5 % Full Pcuer 5% 4.9 .1 2

!!-32-84 (= 5.5 % Full h er 3% 5.35 .05 1

!2-04-84 (= E5 % Full her 5% 5 3 3 01-07-85 (= 5.5 % Full b er 5 5 2 0 32-06-85 (= 5.5 % Full her 5 5 2 3 03-87-85 (= 5.5 % Full her 5 5 0 0 l 84-84-85 (= 5.5 % Full h er 5 5 8 8 l 8543-85 (= 5.5 % Full b er 5 5 2 3 l

06-83-85 (= L 5 % Full b er 5 5 3 3 8743-85 (= L 5 % Fal; b er 5 5 0 2 l 38-86-85 (= 5.5 5 Fall b er 5 4.9 .1 2 09-04-85 (= 5.5 % Full b er 5 4.9 .1 2 13-84-85 (= 1 5 % Fu;I b er 5 5 0 3

!!-05-85 (= E 5 % Full b er 5 4. 8 .2 4 12-25-85 (= 5.5 % Full b er 5 5 0 3 31-11-86 (= !.5 % Fall ?c ee 5% 5 3 2%

22-27-85 (- 5.5 % Fall h er 5% 5 8 31 23-29-86 (= 5.5 % Full h er 5% 5 0 3%

24-01-86 (= 5.5 % Full h er 5% 4. 9 .1 2%

& 85-86 (= 5.5 % Ful b er ~% 4. 3 . 2%

06-04-86 (= L 5 % Fall b er 5% 4.55 .05  :%

27-10-86 (= 3.5 % Fall Pomar 5% 4.3 .05  ;%

08-06-86 (= 5.5 % Fal! ?ar 51 5 3 3%

AT*ACWE'iT 3 PERI: I: E5* 8 TES* 1;E3CRI?TIIlN DATE TANGE  ; NITS SET PCINT MEA 5l.; RED ERRCR % ERRCR ACTICN TAKEN 2PT38.2.4 HI FLUI TRIP 88-87-84 (= 118 1 Full Pee r 189 1 189 8 8 09-88-M (= 118 % Full Power 189 % 28 -89 81.6 PHYSICS TESTS 11-82-84 (= 118 % Full Powr 189 % 28 -89 81.6 Pif/3ICS TESTS 12-84-84 (= 118 % Full Pc w e 189 % 189 8 8 01-87-85 (= 118 % Full Po u r 189 189 8 8

'82-46-85 (= 118 % Fall Pow r 189 109 8 8 83-87-85 (= 118 % Full Pow r 109 189 8 8 84-84-85 (= 118 % Full Power 189 189.1 .1 .89 85-04-85 (= 118 % Full Power 129 189.5 .5 .45 86-83-85 (= 118 % Fall Powr 189 189 8 8 8743-85 (= !!8 % Full Powe 189 189 8 8 88-86-85 (= 118 % Fall Power 189 189.1 .1 .29 83-84-85 (= 118 % Fu!I Power 189 189.4 .4 .37 18-84-85 (= 118 % Fall Power 189 189 8 8

!!-85-85 (= 118 % Full Power 189 189.4 .4 .37 12-85-85 (= !!8 % Fall Power 189 189 8 8 81-18-86 (= 118 % Full Pcw r 189 % 189.2 .2 .18 8247-86 (= 118 % Full ?caer 189 % 109 8 8%

83-29-86 (= 118 % Full Pcuer 109 1 109 8 8%

84-01-86 (= lig 1 Full Power 189 1 28 -89 81.6 PHYSICS TESTS 85-85-86 (= 118 % Full Power 189 5 189 8 8%

86-84-86 (= 118 % Full Pcaer 189 % 189 0 8% '

87-18-86 (= 118 % Full Power 189 1 189 8 8%

0846-86 (= 118 % Full Pcwer 189 5 189 0 8%

.' CATI'd RATE TRIP 88-87-84 (= 5.5 % Full Power 5% 5 8 8 8948-84 (= 5.5 % Full Pcwer 5% 4. 8 .2 4 11-82-84 (= 5.5 1 Full Power 5% 4.95 .85 1 12-84-84 (= 5.5 % Fall Power 5% 4. 8 .2 4 0147-85 (= 5.5 % Full Power 5 5 8 8 82-06-85 (= 5.5 % Full Pc er 5 5 8 8 23-87-85 (= 5.5 % Fell Pc.er 5 5 8 8 24-24-85 (= 5.5 % Fall Pc er 5 5 8 8 2544-85 (= 5.5 1 Full Power 5 4.9 .1 2 86-83-85 (= 5.5 % Fu!1 Pcaer 5 5 0 8

. 27-8345 (= 5.5 % Full Pc*er 5 5 8 8 l 23-86-55 (= 5.5 % Full Pc.er 5 4. 9 .! 2 l 83-84-85 (= 5.5 % Full Ec er 5 4.9 .! 2 18-84-85 (= 5.5 % Full Pc er 5 4. 8 .2 4 11-05-85 (= 5.5 % Full Pae.er 5 4.7 .3 6 12-05-85 (= 5.5 % Fall Tower 5 5 0 0 81-18-86 (= 5.5 % Full Power 5% 4. 8 .2 4%

82-07-86 (= 5.5 % Full ?caer 5% 4. 8 .2 4%

l 83-29-86 (= 5.5 % Full ?c*er 5% 5 0 0%

8441-86 (= 5.5 % Fall Ec.er 5% 4. 6 .4 8%

l 05-05-86 (* 5.5 1 F.11 Pcwer 5% 4.9 .! 2%

3644-86 (= 5.5 % Fall Ec.er 51 4. 9 .! 2%

l 87-1846 (= 5.5 % Full Ec.er 5% 5 8 21 2346-86 (= 5.5 % Fal! Ec er 5% 5 8 2%

PC3171'.'E ".A E TRIP 28-27-84 (= ~.5 % Full Ocaer 5%  ! 8 8 89-88-34 (= 5.5 % Fall ?caer 5% 4. 9 .1 2 l 1142-34 (= 5.5 % Fall Pcwer 5% 5 0 8 12-04-84 (- 5.5 % Full Ecner 51 5 8 8 21-87-55 (= 5.5 % Full Ec.er 5 5 8 8 m

ATTTGENT 3 FERIODIC TEST 4 TEST DESCA:PT!31 DATE RG4iE UNITS SE7 POINT MEASQED ERROR % ERACR ACTIOl TAKEN 29T38,2.4 PCSITIVE WITE TRIP O2-06-85 (= 5.5 % Full Power 5 5 8 e 03-87-85 (= 5.5 % Full Power 5 5 8 8 94-04-85 (= 5.5 % Full Power 5 5.85 .05 1 85-04-85 (= 5.5 % Full Power 5 4. 8 .2 4 0643-85 (= 5.5 $ Full Power 5 5.1 .1 2 07-83-85 (= 5.5 $ Full Pouer 5 5 8 0 88-06-85 (= 5.5 % Full Power 5 5 0 8 89-84-85 (= 5.5 % Full Power 5 4. 7 .3 6 10-04-85 (= 5.5 % Full Power 5 5 8 0 11-85-85 (= 5.5 % Full Power 5 4.7 .3 6 12-05-85 (= 5.5 % Full Power 5- 5 0 8 81-!F86 (= 5.5 $ Full Power 5% 4. 9 .1 2%

82-87-86 (= 5.5 % Full Power 51 5 0 8%

83-29-86 (= 5.5 $ Full h wer 5% 4.8 .2 4%

24-81-86 (= 5.5 $ Full Power 5% 4.8 .2 45 85-85-86 (= 5.5 % Full Power 5% 5 0 8%

86-04-86 (= 5.5 % Full Power 5% 4.9 .1 21 07-!F86 (= 5.5 % Full Power 51 4.95 .85 1%

88-06-86 (= 5.5 % Full Power 51 5.5 .5 10 %

~

2PT31.1.1 CVEMR ^7 TRIP 38-88-84 (= 7.448 VDC 7.248 7.244 .884 .86 09-98-84 (= 7.448 VDC 7.244 7.239 .081 .31 11-27-84 (= 7.448 VDC 7.248 7.244 .884 .26 12-26-84 (= 7.473 VDC 7.273 7.303 .33 .41 21-25-85 (= 7.473 4*4 7.273 7.318 .237 .51 32-25-85 (= 7.473 VDC 7.273 7.294 .821 .29 83-27-85 (= 7.473 VDC 7.273 7.298 .225 .34 24-24-85 (= 7.473 VDC 7.273 7.381 .228 .38 05-21-85 (= 7.473 '*4 7.273 7.290 .817 .23 06-19-85 (= 7.473 VDC 7.273 7.298 .817 .23 87-18-85 (- 7.473 VDC 7.273 7.325 .232 .44 03-29-85 (= 7.473 W C 7.273 7.286 .013 .18 09-28-85 (= 7.473 C C - 7.273 7.298 .217 .23 10-18-85 (= 7.473 W C 7.273 7.295 .222 .3 11-19-85 (= 7.473 VDC 7.273 7.289 .816 .22 12-23-85 (= 7.473 E C 7.273 7.2% .222 .3 81-14-86 (= 7.473 EC 7.273 7.293 .02 .27 82-18-86 (= 7.473 VDC 7.273 7.273 0 2%

03-27-86 (= 7.473 VDC 7.273 7.278 .285 .37 l 84-17-86 (= 7.473 VDC 7.273 7.277 .284 .26

, 25-15-86 (= 7.473 VDC 7.273 7.281 .288 .!!

36-11-86 (= 7.473 V:C 7.273 7.275 .282 .33 I 37-11-86 (= 7.473 VDC 7.273 7.276 .283 .84 08-12-86 (= 7.473 VOC 7.273 7.273 2 3%

l C%RTDP ^T TRIP 23-08-84 (= 7.528 VDC 7.423 7.428 3 8 l 09-88-84 (= 7.620 VDC 7.428 7.432 .01 .13 l 11-27-84  != 7.523 VDC 7.423 7.437 .317 .23

12-26-84 (= 7.433 VDC 7.233 7.229 .224 .33 l 21-25-85 (= 7.433 VDC 7.233 7.233 .233 .24 22-25-85 (= 7.433 Z C 7.233 7.219 .214 .13 22-27 S5 (= 7.433 V
C 7.233 7.225 .228 .!!

i A'*AC'dENT 3 PERACD;; 2-* I TI37 lE3CRI?!!CN lA'E K'E !XIT3 3E7 POINT MEASURED -ERRCR % ERROR ACT*:N TAKEN 2PT31.1.1 'WRTDP ^T TRIP 84-24-85 (= 7.433 G C 7.223 7.219 .014 .19 05-21-85 (= 7.433 VDC 7.233 7.215 .018 .25 06-19-85 (= 7.433 VDC 7.233 7.214 .019 .25 87-18-85 (= 7.433 VDC 7.233 7.235 .802 .83 98-29-85 (= 7.433 VOC 7.233 7.220 .013 .18 99-2F85 (= 7.433 VDC 7.233 7.229 .884 .86 10-18-85 (= 7.433 VDC 7.233 7.226 .007 .1 11-19-85 (= 7.433 VDC 7.233 7.214 .019 .26 12-23-85 (= 7.433 VDC 7.233 7.238 .305 .27 31-14-86 (= 7.433 WC 7.233 7.224 .009 .12 32-19-86 (= 7.433 VDC 7.223 7.232 .001 .01 03-27-86 (= 7.433 W C 7.233 7.229 .004 .26 04-17-86 (= 7.433 VDC 7.233 7.226 .007 .1 %

35-15-86 (= 7.433 VDC 7.233 7.238 .303 .34 36-11-86 (= 7.433 W C 7.233 7.217 .316 .22 37-!!-86 (= 7.433 VDC 7.233 7.238 .283 .34 08-;2-86 (= 7.433 VDC 7.233 7.213 .02 .28 29731.1. 2 CVERPWR ^T TRIP 38-88-84 (= 7.440 WC 7.243 7.239 .001 .41 29-08-84 (= 7.448 VOC 7.248 7.241 .001 .01

!!-27-84 (= 7.443 WC 7.248 7.245 .005 .87 12-26-84 (= 7.473 VCC 7.273 7.275 .082 .03 31-2535 (= 7.473 VOC 7.273 7.288 .287 .1 32-25-85 (= 7.473 VDC 7.273 7.279 .096 .28 23-27-85 (= 7.473 VDC 7.273 7.261 .012 .16 04-24-85 (= 7.473 WC 7.273 7.P.77 .024 .05 2521-65 (= 7.473 VDC 7.273 7.261 .212 .15 06-19-85 (= 7.473 VDC 7.273 7.268 .225 .07 37-38-85 (= 7.473 CC 7.273 7.269 .204 .35 23-20-85 (= 7.473 VDC 7.273 7.261 .012 .15 23-23-85 (= 7.473 V;C 7.273 7.268 .005 .37 12-18-85 (= 7.473 VDC 7.273 7.276 .203 .24 11-23-85 (= 7.473 Z C 7.273 7.E'S .215 .21 12-25-85 (= 7.473 E 7.073 7.263 .21 .14 01-1586 (= 7.473 'OC 7.273 7.266 .037 .1 %

02-19-86 (= 7.473 V;C 7.273 7.265 .208 .11 03-27-86 (= 7.473 'CC 7.273 7.267 .226 .33 24-17-86 (= 7.473 'CC 7.273 7.268 .005 .27 25-15-86 (= 7.473 VDC 7.27' 7.267 .226 .23 35-18-86 (= 7.473 VDC 7.273 7.256 .007 .1 % '

27-12-86 (= 7.473 WC 7.273 7.268 .035 .37 03-!3-85 (= 7.473 VDC 7.273 7.267 .236 .C8 OVER 3 ** TRIP 38-03-84 (= 7.623 VDC 7.420 7.423 .203 . 34 23-23-34 (- 7.C23 VOC 7.423 7.424 .204 .25 11-27-34 (= 7.522 C C 7.420 7.427 .207 .09 12-26-84 (= 7.433 VDC 7.233 7.224 .009 .12 01-25-85 (= 7.433 VDC 7.233 7.243 .315 .21 02-2*-85 (= 7.433 C 7.233 7.236 .?23 .M 33-27-85 (= 7.433 C C 7.233 7.223 .23 .41 04-24-35 (= 7.43' ":C 7.233 7.229 .024 .06 2521-85 (= 7.433 VDC 7.233 7.223 . 3! .!4 J nOA

ATTACHENT 3 PERIOD;C

  • 37 I TES' DESCRIPT!W DATE RANGE DiITS SET PGINT EASURED ERRCR % ERROR ACT13 TAKEN 2PT31,1.2 C'ARTDP ^T TRIP 86-19-85 (= 7.433 VDC 7.233 7.213 .014 .13 87-88-85 (= 7.433 VDC 7.233 7.238 .383 .34 88-20-85 (= 7.433 VDC 7.233 7.224 .883 .12 89-28-85 (= 7.433 VDC 7.2;:3 7.225 .888 .11 19-18-85 (= 7.433 WC 7.233 7.233 8 9 11-20-85 (= 7.433 VDC 7.233 7.232 .381 .81 12-25-85 (= 7.433 VDC 7.233 7.229 .384 .86 81-15-86 (= 7.433 VDC 7.233 7.227 .386 .38 32-19-86 (= 7.433 VDC 7.233 7.232 .081 .81 33-27-86 (= 7.433 G C 7.233 7.228 .385 .07 04-17-86 (= 7.433 VDC 7.233 7.221 .012 .17 35-15-86 (= 7.433 VDC 7.233 7.218 .323 .32 06-18-86 (= 7.433 VDC 7.233 7.215 .018 .25 37-12-86 (= 7.433 VDC 7.233 7.236 .003 .34 88-13-86 (= 7.433 'CC 7.233 7.218 .015 .21 a

2;T31. 2.3 C'KRPWR ^T TRIP 88-88-84 (= 7.448 VDC 7.248 7.245 .885 .87 83-88-84 (= 7.448 VDC 7.240 7.258 .81 .14

,  !!-28-84 (= 7.448 VDC 7.248 7.253 .013 .26 12-26-84 (= 7.473 VDC 7.273 7.281 .008 .11 -

81-32-85 (= 7.473 VDC 7.273 7.269 334 .85 02-27-85 (= 7.473 VDC 7.273 7.273 .306 .03 33-27-85 (= 7.473 VDC 7.273 7.238 .387 .1 24-24-85 (= 7.473 VDC 7.273 7.236 .013 .13 05-22-85 (= 7.473 VDC 7.273 7.276 .003 .24 06-25-85 (= 7.473 VDC 7.273 7.273 .005 .03 27-18-85 (= 7.473 VDC 7.273 7.231 .303 .11 03-21-85 (= 7.473 WC 7.273 7.271 .002 .03 33-19-85 (= 7.473 VDC 7.273 7.277 .304 .35 10-18-85 (= 7.473 VDC 7.273 7.273 .006 .28 11-21-85 (= 7.473 VDC 7.273 7.281 .003 .11 12 25-55 (= 7.473 WC 7.273 7.276 .003 .04 31-16-26 (= 7.473 VDC 7.273 7.275 . 002 .33 02-12-S6 (= 7.473 VDC 7.273 7.275 .002 .03 33-23-86 (= 7.473 G C 7.273 7.276 .003 .24 04-17-86 (= 7.473 VDC 7.273 7.275 .002 .03 35-14-86 (= 7.473 VDC 7.273 7.278 . 025 .07 06-11-86 (= 7.473 'vDC 7.273 7.273 .005 .07 37-12-26 (= 7.473 VDC 7.273 7.273 0 0%

CVER*EP.P ^7 TRIP 26-08-84 (= 7.520 'CC 7.420 7.420 0 0 03-03-34 (= 7.620 W C 7.423 7.428 8 0 11-23-84 (= 7.623 VDC 7. 429 7.425 .005 .07 12-26-84 (= 7.433 WC 7.233 7.245 .312 .!7 01-02-E5 (= 7.433 W C 7.233 7.236 .003 .24 02-27-85 (= 7.433 WC 7.233 7.054 .021 .21 33-27-85 (= 7.433 VDC 7.233 7.236 .003 .24 24 ~4-55  := 7.433 'CC 7.233 '.244 .0!! .!!

0':-22-85 (= 7.433 'EC 7.233 7. 2.1 .033 .24 06-25-35 (= 7.433 'CC 7.233 7.233 .006 .23 07-13-SS (= 7.433 VDC 7.233 7.233 .025 .07 03-2 -55 (= 7.433 VDC 7.233 7.233 0 3 kw

AT'? MENT 3 PERICDI: IS' B TE3T DESCR;P7ICN DATE RANGE " NITS SET PCINT Mda', RED ERRCR % ERACR f,CTION TRKEN 2;T3L1.3 C',ERTD03 ^T TRIP 09-19-85 (= 7.433 V:C 7.233 7.235 .282 .33 10-18-85 (= 7.433 VDC 7.233 7.248 .007 .1 11-21-85 (= 7.433 WC 7.233 7.234 .001 .01 12-25-85 (= 7.433 VCC 7.233 7.243 .91 .14 01-16-86 (= 7.433 VDC 7.233 7.236 .003 .84 02-13-86 (= 7.433 VDC 7.233 7.237 .804 .06 03-28-E (= 7.433 VDC 7.233 7.236 .003 .04 34-17-E (= 7.433 VDC 7.233 7.232 .301 .01 35-14-86 (= 7.433 W C 7.233 7.234 .001 .21 E-11-86 (= 7.433 W C 7.233 7.238 .333 .34 97-12-86 (= 7.433 VDC 7.233 7.235 .382 .33 2Pf31.3.1 LCW RCW 28-49-84 >= 5.501 VDC 5.625 5.622 .003 .85 11-27-84 >= 5.501 VDC 5.625 5.629 .005 .99 12-26-84 )= 5. 2 1 VDC 5.625 5.620 .005 .99 81-25-85 )= 5.501 VDC 5.625 5.616 .008 .16 02-25-85 ): 5.!81 VDC 5.625 5.618 .007 .12 03-27-85 )= 5.501 VDC 5.625 5.621 .804 .87 -

84-24-85 )= 5.581 VDC 5.625 5.623 .902 .04 35-21-85 )= 5.21 VDC E625 5.617 .006 .14 E-19-85 }= 5.581 VDC 5.625 5.628 .305 .29 27-18-85 )= 5.531 VDC 5.625 5.622 .003 .85 28-29-85 )= 5.501 VDC 5.625 5.623 .305 .23 03-29-85 )= 5.21 VDC 5.625 5.629 .305 .O 10-18-85 )= L 581 VDC 5.625 5.628 .095 .39 11-19-85 > = 5.581 WC 1 625 5.620 .205 .39 12-23-85 )= 5. 21 VDC 5.625 5.622 .003 .25 21-15-86 )= 5.501 V C L625 5.618 .007 .2 32-12-26 > = 5.581 WC 5.625 5.621 .224 . 37 C3-27-86 )= 5.521 VDC L625 5.622 .M3 .85 34-14-86 )= 5.21 VDC 5.625 5.621 .204 .27 05-15-86 )= 5. 21 V 0 5.625 5.62 .205 .89 26-12-86 )= 5.531 VCC 5.62: 5.623 .202 .04 07-12-86 >= 5.521 V:C L625 5.618 .007 .12 08-12-86 )= 5.531 VDC 5.625 5.62 .205 .29

??31.3.0 L".A R0W 38-E-84 >= 1 501 VDC 5.625 5.621 . C04 .07 09-08-84 )= 5.521 VDC 5.625 5. 621 .004 .27

!!-27-34 >= 5.521 W C 5.625 5.600 .025 .29 12-25-84 > = 5.91 WC 5.625 5.614 .211 .2 01-25-85 )= 5.501 VDC 5.625 5.618 .227 .12 32-05-85 >= 5. 21 VDC 5.625 5.619 .206 .11 23-27-85 )= 5.581 VDC 1625 5.620 .005 .29 34-24-85 )= 5. 91 VDC 5.625 5.622 .003 .25 25 21-65 )= 5.501 VDC 'N ' c17 .023 .4 26-19-35 ) = !. G WC  !.625 L 615 .01 .18 07- 8-85 )= 5.21 WC  !.625 1618 .007 .'2 38-23-85 )= 5.91 CC  !.625 5.617 .038 .14 03-20-85 )= 1501 VDC L 625 5.620 .N5 .09 NL4

A**AC WINT 3 PERIODIC ~EST I TEST DESCRIPTI N DATE FQNGE 'JITS SET POINT MEASURED ERROR 1 ERTCR ACTIDN TAKEN 2PT31.3.2 LOW ROW 10-18-85 >= 5. 3 1 VDC 5.625 5.619 .006 .!!

11-19-85 >= 1 581 VDC 5.625 5.617 .008 .14 12-23-85 )= 5.581 VDC L625 5.620 .005 .99 01-15-86 >= 5.581 VDC 5.625 5.618 .007 .12 02-19-86 )= 5.501 VDC 1625 5.618 .007 .12 03-27-86 >= 5.501 VDC 5.625 L 619 .006 .11 04-14-86 )= 5.501 VDC 1625 5.619 .006 .11 05-15-86 )= 5.501 VDC 3.625 5.616 .009 .16 06-12-86 >= 5.501 VDC 5.625 5.62 .005 .09 07-12-86 )= 5.501 VDC 5.625 5.616 .009 .16 08-12-86 )= 5.501 VDC E625 1613 .012 .21 2Pi31.3.3 LOW FLOW 08-06-84 >= 5.501 VDC 5.625 5.660 .035 .62 07-08-84 )= 1 501 VDC 5.625 5.628 .003 .05 11-27-84 >= 5.501 VDC 5.625 5.622 .003 .05 12-26-84 >= 5.581 VDC 5.625 1623 .002 .04 01-25-85 >= 5.581 VDC 5.625 5.625 0 0' 02-25-85 )= 1 501 VDC 5.625 L624 .001 .02 7 '

03-27-85 )= 5.501 VDC 5.625 5.629 .004 .07 04-24-85 )= 5.501 VDC 5.625 5.629 .004 .07 -

05-21-85 >= 5.501 VDC 5.625 5.623 .002 .04 06-19-85 )= 121 VDC 5.625 L630 .005 .99 07-18-85 )= 5.501 VDC 5.625 5.630 .005 .99 08-20-85 >= 5.581 VDC 5.625 5.625 0 0 09-20-85 >= 5.501 E 5.625 5.630 .005 .89 10-18-85 )=5.21 E L625 5.627 .002 .24 11-19-85 )= 5.501 VDC 5.625 5.627 .002 .24 12-23-85 >= 5.501 VDC 5.625 16E3 .004 .37 31-15-S6 >= 5. M 1 VDC 5.625 5.627 .002 .34 02-10-86 >= 5.501 VDC 5.625 5.629 .004 .37 03-27-86 >= 1 501 VDC 5.625 5.629 .004 .07 1

04-14-86 )= 5.501 VDC 5.625 1 63 .005 .29 25-15-86 >= 5. 21 VDC 5.625 5.628 .003 .05 06-12-86 )= 1501 VDC 5.625 5.63 .005 .09 07-12-86 >= 5. 21 VDC 5.625 5.625 0 0%

i 08-12-86 )= 5.501 VDC 5.625 E628 .003 .35 l

27'31.3. ? LCW RCW 08-07-84 )= 5.501 VDC 5.625 5.625 0 0 09-08-84 )= 5. 2 1 VDC 5.625 5.623 .002 .035

11-27-84 >= 5.50! C C 5.625 5.622 .003 .353 12-26-84 )= 5.501 VDC 1625 5.619 .206 .107 01-25-85 )= 5.501 VDC 5.625 5.620 .005 .99 i 02-25-85 >= 5. 2 1 VDC 5.625 5.621 .004 .07

! 03-27-85 )= 5.501 C C 5.625 5.620 .005 .29 I 01.-24-85 )= 5.501 E 5.625 5.623 .?02 .04 l 05-21-85 >= 5. 9 1 C C 5.625 5. 621 . 004 .07 06-19-85 >= 5.501 VDC 5.625 5.618 .007 .2 07-18-85 >= 5.501 VDC 5.625 5.622 .003 .35

( 03-20-85 )= L 21 VDC 5.625 5.622 .003 .05 l

ATTAC'4Ci! 3 FERIZ1C*E370TESTDESCRIPT1W DATE RANGE UNIT 3 SET PDINT NEASURED ERACR % ERROR ACTIDN TAKEN 2PT31.14 LW R0W 09-2F85 )= 5.501 VDC 1 625 5.623 .002 .04 10-18-85 > = 5. 21 VDC 1625 5.622 .003 .05 11-20-85 >= 5.501 VDC 5.625 5.622 .003 .05 12-24-85 >= 5.501 VDC 5.625 5.625 0 0 01-16-06 )= 5.501 VDC 5.625 1 623 .002 .04 02-1F86 )= 5.501 VDC 5.625 5.622 .003 .45 03-27-86 )= 5.501 VDC 1625 5.624 .001 .02 04-14-86 )= 5.501 VDC 5.625 1 624 .001 .02 05-15-86 >= 5.501 VDC 5.625 5.623 .002 .04 06-!S-86 )= E 501 VDC 5.625 5.631 .006 .11 07-12-86 >= 5.501 VDC 5.625 5.622 .003 .05 08-13-86 >= 5.501 VDC 5.625 5.621 .004 .07 2PT31.3.5 LCW FLOW 08-07-84 >= 5.501 VDC 5.625 5.606 .019 .338 09-08-84 >= 5.501 VDC 5.625 5.618 .007 .124 11-27-84 )= 5.501 VDC 1625 5.612 .013 .231 12-26-84 >= 1 3 1 VDC 5.625 1 611 .014 .249 01-25-35 )= 5.501 VDC 5.625 5.610 .015 .27 02-25-85 )= 1 501 VDC 5 625 L 607 .018 .32 03-27-85 )= 5. 9 1 VDC 5.625 5.603 .016 .28 -

04-24-85 >= 5.501 VDC 5.625 5.612 .013 .23 05-21-85 )= 5. 2 1 VDC 5.625 5.607 .018 .32 06-13-35 )= 5.501 VDC 5.625 5.613 .012 .21 07-18-85 )= E 501 VDC 1625 5.612 .013 .23 33-20-85 )= LSI VDC 5.625 5.606 .019 .34 03-20-85 )= L501 VDC 5.625 5.611 .014 .25 13-18-85 >= 5.501 VDC L 625 5.610 .015 .27 11-20-65 )= 5. 2 1 VDC 5.625 5.610 .015 .27 12-24-85 )= 5.91 CC 5.625 5.613 .012 .21 01-16-86 )= 5.21 VDC E G25 5.611 .014 .25 22-10-86 >= L 501 VDC 5.625 L612 .013 .23 03-27-86 )= 5. 9 1 C C 1 625 5.611 .014 .25 24-15-86 >= L 501 VDC 5.625 5.613 .012 .21 05-!:-86 )= 5.21 VDC 5.625 5.606 .013 .34 06-18-86 >= 5. 3 1 VDC 5.625 5.613 .012 .21 07-12-86 >= 5.501 VDC 1 625 5.611 .014 .25 r 08-13-86 >= 5.501 VDC 5.625 5.611 .014 .25 i

l l 2P731.2.6 LDW RCW 23-07-84 >= 5.001 VDC 5 625 5.611 .014 .243 03-08-84 >= 5.501 VDC 5.625 5. 620 .005 .033 11-27-84 )= 5. 2 1 VDC L625 5.619 .006 .107 j 12-26-84 )= 5.501 VDC 5.625 L 6!8 .007 .124

01-25-35 )= 5.501 VDC 1625 5.614 .011 .2 02-25-85 )= 5.501 VDC 1625 5.619 .006 .!!

03-27-35 )= L 501 VDC  !.625 1616 .003 .16 04-24-65 )= 5. 3 1 VDC 5.625 5.620 .05 .03 05-21-35 >= 5.521 VDC 1625 5.513 .006 .!!

06-19-85 > = E 91 VDC 5. 625 L 624 .001 .22 07-13;E5 >= L 501 VDC 5 625 L623 .002 .04

ATTA04 0T 3 FERICDiC TES* 8 TEST lESCMPTI31 LA'E RANGE UNITS SET POINT EASURED ERRCR % ERRCR ACTICN TTEDI 2PT31.3,6 LOW FLW 08-20-85 )= 5.501 V;C 5.625 5.620 .005 .09 09-20-85 )= i',31 WC 5.625 5.621 .004 .37 10-18-85 )= 5.501 VDC 1 625 5.621 .004 .07 11-20-85 >= 5.501 E 5.625 5.617 .308 .14 12-24-85 )= 5.501 VDC 1 625 5.622 .003 .05 01-16-86 >= 5.'.01 VDC 5.625 5.62 .005 .39 02-19-86 >= 1501 VDC 5.625 5.621 .004 .07 03-27-86 >= 5.501 VDC 5.625 1 621 .004 .37 04-15-86 )= 5.501 VDC 5.625 1621 .004 ~. 0 .'

35-15-86 )= 5.501 VDC 5.625 1 62 .305 .39 36-18-86 >= 5. 21 VDC 1 625 5.625 0 0%

07-12-86 )= 5.',01 VDC 5.625 5.624 .001 .22 38-13-86 )= 5.501 VDC 5.625 5.621 .004 .37 2PT31.3.7 LCW FLCW 13-24-84 }= 5.501 VDC 5.625 5.625 8 9 11-27-84 )= 5.501 VDC 5.625 5.625 0 0 12-26-84 )= 5.501 E 5.625 5.622 .303 .053 01-26-85 >= L 531 VDC E C5 5.623 .002 .34 -

02-26-85 )= 5.501 VDC 5.625 5.625 0 0 03-27-85 )= 5.501 VDC 5.625 5.628 .003 .05 34-24-85 )= 5. 2 1 W C 5.625 5.626 .001 .02 05-22-85 )= 5.501 VDC 1 625 5.621 .004 .07 06-19-85 )= 5. 2 1 VD: 5.625 LE27 .302 .24 37-18-85 )= 5. 21 VDC 5.625 5.624 .001 .22 28-21-85 >= 5.501 WC 5.625 5.623 .032 .24 09-20-35 )= 5.501 VDC 5.625 5.626 .201 .02 13-19-2 >= 5.531 VDC 5.625 5.623 .042 .04

1-23-35 >= L 531 VDC 5.625 5.624 .001 .22 12-25-85 )= 5.21 WC 5.625 5.625 3 3 31-18-66 >= 5. 2 1 VDC 5.625 5627 .082 .04 02-13-66 >= 5.531 VDC  !.625 1 628 .003 .05 33-28-86 >= 5.501 VDC 5.625 5.625 0 0%

24-17-86 >= 5.*01 W C 5.625 5.65 .304 .37 05-14-86 )= 5.21 WC 1625 1623 .002 .04 06-11-86 )= L 531 VDC 5.625 5.627 .202 .34 37-12-86 >= 5.501 VDC 5.625 1623 .002 .04 2P 31.:.2 LW ." 3 08-07-84 >= 5. 21 VDC 5.625 L623 .222 . 336 29-28-84 >= 5. 2 1 VDC **

  • 621 .004 .071 11-27-84 >= i!al WC " 625

. L621 .004 .271

2-26-84 >= 5.!21 VDC " 625

. 5.622 .003 .052 31-25-85 )= L 531 VDC 5.625 5.616 .209 .16 )

22-26-85 )= 5.!01 VDC LC5 1 622 .003 .05 33-27-85 )= 5.501 VDC 5.625 5.623 .302 .34 24-24-85 ) = L21 VDC 5.13  !.622 .303 .25 25-22-85 >= 5.531 VDC 5.625 5. 619 .026 .!!

06-19-85 >= 5.21 VDC 5.C5 5.621 .004 .27 37-18-85 >= L 521 VIC 5.625  !.621 .004 .37 08-21-85 >= !.53: V:C  :.T25 5.C3 .202 .24 m

r .

A'*"OcM NT 3

?ERICDIC *EST 0 TEST lESCRIPTI M DATE RANGE thiliS SET FCINT MEAsi2ED E*sRCR % ERRCH ACTI M TAKEN 2FT31.3.8 LDW RDW 89-20-85 >= 5.501 VDC 5.625 5.617 .308 .14 10-19-85 )= 1 581 VDC 1625 5.621 .304 .37 11-20-85 >= 5.53: VDC 5.625 5.616 .009 .16 12-25-85 >= 5.501 VDC 5.625 5.620 .005 .99 01-18-5 >= 5.501 VDC 1 625 1622 .003 .35 02-13-86 >= 5.501 VDC 5.625 5.622 .303 .85 03-28-86 >= 5.501 VDC 5.625 1625 0 8%

34-17-86 )= 1 501 VDC 5.625 5.624 .301 .82 05-14-86 > = 1581 VDC 1625 5.620 .025 .99 36-11-86 )= 5.501 VDC 5.625 5.624 .301 .82 87-12-86 >= 1 501 VDC 1625 5.620 .005 .99 2FT31.2.9 LDW RDW 08-87-84 > = 121 VDC 5.625 5.625 0 0 09-88-84 >= 5.581 VDC 5.625 5.621 .304 .071

!!-27-84 >= 5.531 VDC 5.625 5.621 .304 .871 12-26-84 >= 5. 2 1 VDC 1 625 5.618 .007 .124 i 31-26-85 )= 5. 21 VDC 5.625 5.612 .213 .23 02-26-85 >= 1 501 VDC 5.625 5.624 .001 .02 -

83-27-85 )= 5.501 VDC 5.625 5.624 .001 .02 04-24-85 )= 5.501 VDC 1625 5.622 .003 .05 85-22-85 >= 5.581 E C 1 625 5.629 .305 .09 06-25-85 )= 1 21 VDC 5.625 5.619 .006 .11 37-18-85 >= 5. 21 VDC  !.625 5.621 .204 .37 08-21-85 >= 5. 2 1 VDC 5.625 5.620 .205 .29 29-20-85 )= 5.581 VDC 5.625 5.621 .004 .37 10-19-85 )= 131 VDC 5.625 5.620 .005 .09

!!-20-35 )= 5.581 VDC 5.625 5.618 ,237 .12 12-25-85 )= L 21 VDC 165 5.621 .004 .27 21-18-36 }= 5.581 VDC 5.625 1622 .233 .35 02-:3-86 >= 5.521 VOC 1 625 5.623 .232 .24 23-23-86 }= 5. 2 1 VDC 5.65 5.65 3 3%

24-;7-86 )= 5. 2 1 VDC 5.625 1 624 .001 .22 25-14-36 >= 5.581 VDC 1 525 5.621 .224 .27 06-11-86 >= 5.501 VDC 5.625 1624 .001 .82 37-12-86 >= 5.531 VDC 5.625 1 62 .225 .29 2;73 .7 PRE 3S. WATER LEVEL 28-86-84 (= 9.3 VDC 9.2 9. 2 0 2 09-38-84 (= 9.3 VDC 3. 2 9.232 .202 . 22

!!-27-34 (= 9.2 V C 3.2 9.2:2 .012 .3 12-26-S4 (= 9.3 VDC 9.2 9. 2 3 0 21-25-85 (- 9.3 VDC 9.2 9.137 .223 .23 32-25-35 (= 9.3 VDC 9. 2 9.198 .222 .22 23-27-85 (= 9.3 V:C 9. 2  ?. 2 2 3 {.

34-24-85 (= 9.3 VDC 9. 2 9.297 .007 .23 25-21-55 (= 9.3 V"C 12 9.205 .305 .25 25-19-85 (= 9.3 VDC 9. 2  ?.222 .002 . 22 27- 3-85 (= 9.3 VDC 9. 2 9.034 .024 .04 28-23-85 (= 9.3 VDC 9. 2 9. 2 2 2 09-20-85 (= 9.3 VDC 3. 2 9.2 0 3 N

TiTTTDOENT 3 PERICDIC TES~ l TEST DESCRIPTI(N DATE TUNiE 1RITS SE7 POINT EfGJRED ERRGR % ERROR ACTIIN TAMEN 2P731.7.1 PRESS. HRTER LEVE1. 10-18-85 (= 9.3 VDC 9.2 9.201 .001 .21 11-19-85 (= 9.3 VDC 9. 2 9.202 .802 .32 12-23-85 (= 9.3 VDC 9.2 9.203 .003 .03 01-15 4 (= 9.3 VDC 9. 2 9.202 .802 .02 02-10 4 (= 9.3 VDC 9.2 9.207 .007 .08 27 4 (= 9.3 VDC 9. 2 9.2 0 85 05-15-86 (= 9.3 VDC 9.2 9.201 .001 .01 06-12-86 (= 9.3 E 9.2 9. 2 0 05 07-12-86 (= 9.3 VDC 9.2 9.294 .004 .04 08-12-86 (= 9.3 VDC 9.2 9.199 .001 .31 09T31.7.2 FRESS. WTER IIVEL 38-07-84 (= 9.3 VDC 9.2 9.195 .005 - .05 09-08-84 (= 9.3 VDC 3. 2 9.201 .001 .01 11-27-84 (= 9.3 VDC 9. 2 9.207 .007 .08 12-27-84 (= 9.3 VDC 9.2 9. 2 8 0 01-25-85 (= 9.3 VDC 9.2 9.204 .004 .04 02-25-85 (= 9.3 VDC 9. 2 9.198 .002 .02 03-27-85 (= 9.3 VDC 9.2 9.201 .001 .01 84-24-85 (= 9.3 VDC 9. 2 9.201 .301 *. 01 05-21-85 (= 9.3 VDC 9. 2 9.133 .007 .06 -

06-19-85 (= 9.3 VDC 9. 2 9.194 .006 .07 07-18-85 (= 9.3 VDC 9.2 9.294 .004 .04 38-20-85 (= 9.3 VDC 9. 2 9.197 .283 .33 39-20-85 (= 9.3 VDC 9. 2 9.204 .224 .04 12-15-85 (= 9.3 VDC 3. 2 9.199 . 231 .01 11-20-85 (= 3.3 VDC 9.2 9.194 .006 .07 12-25-85 (= 9.3 VDC 9. 2 9.198 .302 .32 21-16-96 (= 9.3 VDC 3. 2 9.197 .003 .33 02-19-86 (= 9.3 VDC 9. 2 9. 2 0 81 03-27-86 (= 9.3 VDC 3.2 9.195 .005 .35 04-17-86 (= 9.3 VDC 9. 2 9.198 .232 .22 05-15-86 (= 9.3 VDC 9.2 9.196 .234 .34 06-18 4 (= 9.3 VDC 9.2 9. 2 0 0%

07-12 4 (= 3.3 VDC 3.2 9.201 .301 .01 38-13-86 (= 9.3 VDC 9. 2 9.199 .201 .31

?i31.7.3  ;;I 3. WATER LEVEL 08-07-84 (= 3. 3 ',0C 9.2 9.191 .029 .1 29-08-84 (= 9.3 'TC 3. 2 9.285 .225 .35 11-27-84 (= 3.3 E 9.2 9.205 .005 .25 12-27-84 (= 9.3 VDC 9.2 9.197 .003 .23 21-26-85 (= 9.3 VDC 9.2 9.186 .014 .!!

22-25-85 (= 9.3 VDC 3. 2 9.204 .234 .24 23-27-85 (= 9.3 E 9. 2 9.193 .222 .22 24-24-85 (= 9.3 VDC 9. 2 9.206 .226 .37 25-22-85 (= 3.3 VDC 9. 2 9.194 .206 .37 26-19-85 (= 9.3 VDC 3. 2 9.153 .237 .4 27-22-85 (= 9.3 VDC 9. 2 9.123 .C92 1 38-21-85 (= 9.3 VDC 3. 2 9.152 .248 .52 09-22-85 (= 9.3 VDC 9. 2 9.179 .221 .23 M

w ATTTC N NT 3 PERIODIC IIST 8 TEST DESCRIPTIN DATE RANiiE tNITS SET PCINT EASURED ERROR 5 ERRCR ACTI M TAKEN 2PT31.7.3 PRESS. WATER LEVEL 18-19-85 (= 3.3 W C 9.2 9.218 .01 .11 11-21-85 (= 9.3 CC 9.2 9.213 .813 .!4 12-25-85 (= 9.3 VOC 3.2 9.179 .021 .23 01-16-86 (= 9.3 VDC 9.2 9.174 .026 .28 82-13-86 (= 9.3 VDC 9.2 9.294 .304 .04 02-13-86 (= 9.3 VDC 9.2 9.182 .898 1.37 CGNRITOR REPUICED 23-28-86 (= 9.3 VDC 9.2 9.2 0 31 04-17-86 (= 9.3 VDC 9.2 9.206 .806 .97 85-14-86 (= 9.3 VDC 9.2 9.294 .004 .34 36-11-86 (= 9.3 VDC 9. 2 9.295 .305 .35 87-12-86 (= 3.3 VDC 9.2 9.285 .005 .35 7'

de' m- -

ATTACHMENT 4 Application Fee i

i i

l l

.I