Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20207B983 + (ML20207B983)
- ML20207B984 + (ML20207B984)
- ML20207B988 + (ML20207B988)
- ML20207B989 + (ML20207B989)
- ML20207B990 + (ML20207B990)
- ML20207B991 + (ML20207B991)
- ML20207B992 + (ML20207B992)
- ML20207B994 + (ML20207B994)
- ML20207B996 + (ML20207B996)
- ML20207B997 + (ML20207B997)
- ML20207B998 + (ML20207B998)
- ML20207C001 + (ML20207C001)
- IR 05000285/1988021 + (ML20207C002)
- ML20207C003 + (ML20207C003)
- ML20207C004 + (ML20207C004)
- ML20207C005 + (ML20207C005)
- ML20207C006 + (ML20207C006)
- ML20207C007 + (ML20207C007)
- ML20207C010 + (ML20207C010)
- ML20207C012 + (ML20207C012)
- ML20207C013 + (ML20207C013)
- ML20207C014 + (ML20207C014)
- ML20207C015 + (ML20207C015)
- ML20207C016 + (ML20207C016)
- ML20207C018 + (ML20207C018)
- ML20207C019 + (ML20207C019)
- ML20207C022 + (ML20207C022)
- ML20207C023 + (ML20207C023)
- 05000346/LER-1988-015, :on 880702,debris Discovered in Reactor Vessel. Caused Partly by Poor Cleanliness Control.Metal Debris Removed,Investigation Re Cause Performed & Procedure BD-MN-00005 Re Cleanliness Control Revised + (ML20207C024)
- ML20207C026 + (ML20207C026)
- ML20207C027 + (ML20207C027)
- A07029, Responds to Generic Ltr 88-01, IGSCC in Austenitic Stainless Steel Piping. Util Developed Encl Updated IGSCC Program for Facility Which Follows Guidelines of NUREG-0313, Rev 2 + (ML20207C028)
- ML20207C029 + (ML20207C029)
- ML20207C032 + (ML20207C032)
- ML20207C033 + (ML20207C033)
- ML20207C034 + (ML20207C034)
- ML20207C037 + (ML20207C037)
- ML20207C038 + (ML20207C038)
- ML20207C041 + (ML20207C041)
- 05000455/LER-1988-069, :on 880615,diesel Generator Inoperable Due to Voltage Control Problems.Caused by a Failed Relay on pre-position Card in Voltage Control Circuit.Relay Replaced. Operability Surveillance Performed + (ML20207C042)
- ML20207C043 + (ML20207C043)
- ML20207C046 + (ML20207C046)
- 05000277/LER-1988-015-01, :on 880628,continuous Firewatch in Cable Spreading Room Left Post Unattended for Approx 20 Minutes in Violation of Tech Spec 3.14.B.4.a.Caused by Personnel Error. Firewatch Reestablished + (ML20207C047)
- ML20207C048 + (ML20207C048)
- ML20207C050 + (ML20207C050)
- ML20207C051 + (ML20207C051)
- 05000352/LER-1988-025, :on 880627,reactor Encl Isolation Occurred While Performing Surveillance Test.Caused by Instrument Isolation Valve Being Partially Closed During Surveillance. Reactor Encl Isolation Reset Per Procedure + (ML20207C052)
- ML20207C053 + (ML20207C053)
- 2CAN029913, Application for Amend to License NPF-6,adding Footnote to Action 2 Allowing Startup with Functional Units Associated with Channel D Excore Inoperable.Action 2 Is Associated with TS Table 3.3-1, Reactor Protective Instrumentation + (ML20207C054)
- ML20207C055 + (ML20207C055)
- ML20207C057 + (ML20207C057)