JUL 2 7 l988
In. Reply Refer To:
Docket:
50-285/88-21
-
Omaha'Public Power District
ATTN:
Kenneth J. Morris, Division Manager-
Nuclear Production
1623 Harney Street
Omaha, Nebraska 68102
Gentlemen:
This refers to the inspection conducted by Mr. W. M. McNeill of this office
during the period June 27 through July 1,1988, of activities authorized by NRC
Operating License DPR-40 for the Fort Calhoun Station, and to the discussion of
our findings with you and other members of your staff at the conclusion of the
inspection.
The area examined during the inspection was your corrective action program.
Within this area, the inspection consisted of selective examination of
procedures and representative records, interviews with personnel, and
observations by the NRC inspector. The inspection findings are documented in
the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal
' Regulations.
Your response should be based on the specifics contained in the
Notice of Violation enclosed with this letter.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Papemork Reduction Act of 1980, PL 96-511.
Should you.have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Original Simmi Hy
II. J. Call n
L. J. Callan, Director
Division of Reactor Projects
Enclosures:
(see next page)
RIV:RE*
C:M&QPS*
D:DRS*
D:DRPb
WMMcNeill;dp
IBarnes
JLMilhoan
LJCallan
/ /88
/ /88
/ /88
} /g/88
esoso4o2e2 ee0727
h
DR
ADOCK 050002e5
.
-
g.
.
,
_0maha Public' Power District
-2-
f
i
Enclosures:
1.
Appendix A - Notice of Violation.
2.
Appendix B-- NRC Inspection Report
50-285/88-21
cc w/ enclosures:
Fort Calhoun Station
ATTN:
W. G. Gates, Manager
P.O. Box 399
_
Fort Calhoun, Nebraska 68023
Harry H. Voigt, Esq.
LeBoeuf, Lamb, Leiby & MacRae
1333 New Hampshire Avenue, NW
Washington, D. C.
20036
Kansas Radiation Control Program Director
Nebraskc Radiation Control Program Director
bcc to DMB (IE01)
bec distrib. by RIV:
R.D. Martin, RA
- RPB-DRSS
- Section Chief (DRP/B)
- MIS System
- RIV File
- DRP
- RSTS Operator
- Project Engineer, DRP/B
Lisa Shea, RM/ALF
- T. Bournia, NRR Project Manager
- DRS
G. F. Sanborn, E0
- W. M. McNeill
- RRI
1. Barnes
- w/766