Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198A657 + (ML20198A657)
- ML20198A658 + (ML20198A658)
- ML20198A659 + (ML20198A659)
- B16940, Forwards Revised Schedule for Completion of Commitment Re Corrective Action Plan for Training + (ML20198A660)
- ML20198A662 + (ML20198A662)
- ML20198A665 + (ML20198A665)
- ML20198A666 + (ML20198A666)
- ML20198A667 + (ML20198A667)
- ML20198A669 + (ML20198A669)
- IR 05000424/1985030 + (ML20198A671)
- ML20198A672 + (ML20198A672)
- ML20198A673 + (ML20198A673)
- ML20198A675 + (ML20198A675)
- ML20198A676 + (ML20198A676)
- ML20198A679 + (ML20198A679)
- 05000237/LER-1985-035-03, :on 850929,scram Occurred Due to Low Condenser Vacuum.Caused by Air in-leakage Through Ruptured Expansion Joint on Seal Steam Relief Valve Discharge Line.Bellows on Discharge Line Replaced + (ML20198A683)
- ML20198A686 + (ML20198A686)
- ML20198A688 + (ML20198A688)
- ML20198A690 + (ML20198A690)
- 05000327/LER-1998-003-04, :on 981109,automatic Reactor Trip Occurred. Caused by Component in Bridge Circuit of Vital Inverter Failed.Inverter Bridge Circuit Replaced + (ML20198A691)
- 05000285/LER-1985-006, :on 850928,three Main Steam Safety Valves Failed to Lift within 1% of Setpoint Valves During Test. Caused by Normal Drift + (ML20198A694)
- IR 05000456/1997310 + (ML20198A696)
- ML20198A699 + (ML20198A699)
- ML20198A700 + (ML20198A700)
- ML20198A705 + (ML20198A705)
- ML20198A706 + (ML20198A706)
- IR 05000424/1985027 + (ML20198A707)
- ML20198A708 + (ML20198A708)
- IR 05000331/1997015 + (ML20198A710)
- ML20198A711 + (ML20198A711)
- ML20198A712 + (ML20198A712)
- RC-98-0226, Forwards Amend 42 to Psp.Changes Do Not Degrade Safeguards Effectiveness in PSP or Safeguards Contingency Plan,As Described in 10CFR50.54(p).Without Encl + (ML20198A713)
- ML20198A714 + (ML20198A714)
- ML20198A716 + (ML20198A716)
- ML20198A718 + (ML20198A718)
- ML20198A719 + (ML20198A719)
- ML20198A720 + (ML20198A720)
- ML20198A727 + (ML20198A727)
- ML20198A735 + (ML20198A735)
- 05000247/LER-1985-012, :on 850928,reactor Trip Occurred Due to Power Range High flux-low Level Trip Signal.Caused by Operator Failure to Block Trip Signal Although Permissive for Blocking Trip Existed.Condition Stabilized + (ML20198A739)
- ML20198A742 + (ML20198A742)
- 05000302/LER-1997-045, :on 971205,discovered Two Valves in CAS Which Did Not Meet Seismic Class I Qualification Requirements. Caused by Original Construction Error.Util Installed Necessary Supports to Return Valves to Seismic Class I + (ML20198A743)
- ML20198A744 + (ML20198A744)
- ML20198A745 + (ML20198A745)
- 05000280/LER-1983-030-03, /03l-0:on 830707,at 100% Power,Breaker for Heat Tracing Circuit 26A on Panel 9 Found Open.Breaker Closed. Circuit Verified Operational + (ML20198A746)
- ML20198A749 + (ML20198A749)
- ML20198A751 + (ML20198A751)
- ML20198A753 + (ML20198A753)
- ML20198A754 + (ML20198A754)
- 05000245/LER-1985-008-01, :on 850114,after Return to Full power,5% Increase in Recirculation Flow Required to Attain Same Core Thermal Power.Caused by Injection of Oxides from Condensate Booster Pump Into RCS + (ML20198A756)
- ML20198A757 + (ML20198A757)