Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20136C937 + (ML20136C937)
- ML20136C939 + (ML20136C939)
- ML20136C941 + (ML20136C941)
- ML20136C943 + (ML20136C943)
- ML20136C944 + (ML20136C944)
- PY-CEI-NRR-0387, Forwards New FSAR Chapter 6 Test & Revised Tables 15.6-12 & 15.6-15,summarizing Results of Reevaluation of Control Room Leakage.Fsar Changes Will Be Incorporated Into Future Amend. W/Two Oversize Drawings + (ML20136C945)
- NUREG-0591, Discusses Review of EPICOR-II Operating & Emergency Procedures.All But Three Procedures Approved.Engineering Design of Facility for Contaminated Filter & Resins Not Complete + (ML20136C950)
- ML20136C951 + (ML20136C951)
- ML20136C952 + (ML20136C952)
- ML20136C953 + (ML20136C953)
- IR 05000289/1974015 + (ML20136C954)
- ML20136C957 + (ML20136C957)
- ML20136C965 + (ML20136C965)
- ML20136C967 + (ML20136C967)
- ML20136C968 + (ML20136C968)
- ML20136C973 + (ML20136C973)
- ML20136C977 + (ML20136C977)
- ML20136C979 + (ML20136C979)
- IA-85-586, Responds to FOIA Request for Documents Re SECY-85-65. Documents Identified in Encl App Withheld (Ref FOIA Exemption 5).Denial May Be Appealed within 30 Days + (ML20136C979)
- ML20136C984 + (ML20136C984)
- ML20136C986 + (ML20136C986)
- ML20136C991 + (ML20136C991)
- ML20136C992 + (ML20136C992)
- ML20136C993 + (ML20136C993)
- ML20136C997 + (ML20136C997)
- ML20136C999 + (ML20136C999)
- ML20136D001 + (ML20136D001)
- ML20136D003 + (ML20136D003)
- ML20136D004 + (ML20136D004)
- ML20136D006 + (ML20136D006)
- ML20136D007 + (ML20136D007)
- ML20136D009 + (ML20136D009)
- ML20136D011 + (ML20136D011)
- ML20136D012 + (ML20136D012)
- ML20136D013 + (ML20136D013)
- PY-CEI-NRR-0426, Requests Extension of Payment Period for Bills E0116 & E0117 for Review of Integrated Design Insp 50-440/84-29 Until Revised Billing Provided Which Distributes Contractual & NRC Staff Hour Costs + (ML20136D016)
- ML20136D017 + (ML20136D017)
- ML20136D018 + (ML20136D018)
- ML20136D021 + (ML20136D021)
- ML20136D023 + (ML20136D023)
- ML20136D024 + (ML20136D024)
- W3P85-3802, Confirms That First Annual Rept Re Changes,Tests & Experiments from 841218-851231 Will Be Submitted by 860331, Per 10CFR50.59(b).Subsequent Repts Will Be Furnished Before End of Mar to Cover Changes Made in Previous Calendar Year + (ML20136D025)
- ML20136D027 + (ML20136D027)
- ML20136D032 + (ML20136D032)
- ML20136D035 + (ML20136D035)
- ML20136D037 + (ML20136D037)
- ML20136D038 + (ML20136D038)
- ML20136D040 + (ML20136D040)
- ML20136D041 + (ML20136D041)
- ML20136D042 + (ML20136D042)
- ML20136D044 + (ML20136D044)