Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NRC-95-0096, Application for Amend to License NPF-43,revising TS Re Sys Testing,Instrumentation Calibr,Component Insp,Component Testing,Response Time Testing & Logic Sys Functional Tests to Allow one-time Extension of Surveillance Intervals + (ML20092L172)
- ML20092L173 + (ML20092L173)
- ML20092L176 + (ML20092L176)
- 05000301/LER-1984-003, :on 840519,inadvertent Safety Injection Actuation Occurred While Decreasing RCS Pressure.Caused by Operator Failure to Block Safety Injection Prior to Actuation Setpoint.Reactor Shut Down + (ML20092L177)
- ML20092L179 + (ML20092L179)
- ML20092L183 + (ML20092L183)
- ML20092L191 + (ML20092L191)
- ML20092L192 + (ML20092L192)
- ML20092L197 + (ML20092L197)
- ML20092L205 + (ML20092L205)
- IR 07200046/2019401 + (ML20092L213)
- 3F0684-10, Clarifies 831118 Commitment to Install Redundant safety- Grade Level Indications on Emergency Feedwater Tank by Refuel VI Instead of Condensate Storage Tank by Refuel V. Emergency Feedwater Valves 3 & 4 Will Not Be Installed + (ML20092L221)
- NRC-84-0095, Forwards Rev 15 to Fsar.Rev Includes Only Changes Consistent W/Basis for Issuance of Callaway License + (ML20092L223)
- ML20092L234 + (ML20092L234)
- ML20092L242 + (ML20092L242)
- B11233, Forwards Revised Responses to Info Provided in 840412 Submittal Re Draft SER Open Items on Effluent Treatment Sys, Covering Mechanical Vacuum Pump Discharges & Turbine Gland Seal Condenser Vent + (ML20092L243)
- ML20092L244 + (ML20092L244)
- ML20092L247 + (ML20092L247)
- ML20092L249 + (ML20092L249)
- ML20092L254 + (ML20092L254)
- ML20092L256 + (ML20092L256)
- ML20092L258 + (ML20092L258)
- ML20092L260 + (ML20092L260)
- ML20092L266 + (ML20092L266)
- ML20092L272 + (ML20092L272)
- ML20092L280 + (ML20092L280)
- B11231, Forwards Addl Info on Draft SER Open Items CPB-3 & ICSB-14 Re Itemized Documentation & Design for Inadequate Core Cooling,Respectively,Requested in Generic Ltr 82-28 + (ML20092L282)
- ML20092L283 + (ML20092L283)
- ML20092L288 + (ML20092L288)
- B11225, Summarizes 840608 Meeting W/S&W & Util in Bethesda,Md Re Util Responses to Mechanical Engineering Branch 840522 Questions 210.31,34,36,37,44 & 45 Re Stress Calculations for Welds & Pipe Supports.Status of Responses Encl + (ML20092L289)
- ML20092L292 + (ML20092L292)
- ML20092L298 + (ML20092L298)
- ML20092L301 + (ML20092L301)
- ML20092L308 + (ML20092L308)
- ML20092L320 + (ML20092L320)
- ML20092L343 + (ML20092L343)
- ML20092L348 + (ML20092L348)
- ML20092L352 + (ML20092L352)
- ML20092L361 + (ML20092L361)
- ML20092L363 + (ML20092L363)
- ML20092L379 + (ML20092L379)
- ML20092L391 + (ML20092L391)
- ML20092L397 + (ML20092L397)
- ML20092L433 + (ML20092L433)
- ND-20-0327, Submittal of 10 CFR 50.46 Annual Report + (ML20092L444)
- 2CAN068408, Unit Two Cycle Four Startup Rept, for Period Ending 840315 + (ML20092L449)
- ML20092L458 + (ML20092L458)
- ML20092L465 + (ML20092L465)
- ML20092L467 + (ML20092L467)
- ML20092L473 + (ML20092L473)
- ML20092L479 + (ML20092L479)