ML20092L247
| ML20092L247 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 06/19/1984 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Bishop T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| ANPP-29768-TDS, DER-84-02, DER-84-2, NUDOCS 8406290296 | |
| Download: ML20092L247 (2) | |
Text
-
50 -$W SM UO
(
y 7,
J JECaVED NRC Arizona Public Service Company E JlRI 2l PH 1: 00 June 19, 1984 REGIONvitJ ANPP-29768-TDS/TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek,.CA 94596-5368 Attention:-Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs
Subject:
Time Extension For Report - DER 84-02 A 50.55(e) Potentially Reportable Deficiency Relating To Rust, Scale And Pitting In The Clevis And Arm Of Several SI And CH Valves.
File: 84-019-026; D.4.33.2
Reference:
(A) Telephone conversation between P. Johnson and T. Bradish on January 23, 1984 (B) ANPP-28885, dated February 15, 1984 (Interim Report)
(C) ANPP-29130, dated March 22, 1984 (Time Extension)
(D) ANPP-29350, dated April 24, 1984 (Time Extension)
Dear Sir:
The NRC was notified of a potentially reportable deficiency in Reference (A), an Interim Reps.-t was transmitted by Reference (B) and Time. Extensions were requested by References (C) and (D). At that time, it was estimated that a Final Report would be available by June 21, 1984.
The final report has been prepared and is currently being reviewed by APS. At the conclusion of the review process and resolution of all comments, the final report will be transmitted to the NRC for review.
l-This is currently scheduled for July 20, 1984.
Very truly ours,
{
t' Gl_l OLLL E. E. Van Brunt, Jr.
APS Vice President Nuclear Production ANPP Project Director EEVB/TRB:db cc:
See.Page Two i
s0 8406290296 840619 PDR ADOCK 05000528 S
"" 9 A
',.:..,n.-
6 L.
Mr.5T. W. Bishop DER 84-02 Page Two cc:
Richard DeYoung, Director Office of Inspeerion and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.
D. B. Karner W. E. Ide D. B. Fannacht A. C. Rogers L. A. Souza D. E.'Fewler T. D. Shriver C. N. Russo J. Vorees J.
P..
Bynum J. M. Allen
.J..A. Brand
.A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson-R. W. Welcher H. D. Foster D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiore111 S. R. Frost J. Self D. Canady Records Center Institute of1 Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, GA 30339
..