ML20092L234

From kanterella
Jump to navigation Jump to search
Provides Info to Be Added to Ufsar,Rev 11 in Response to Lates Review & Comments on Proposed Change Number 299 by OGC
ML20092L234
Person / Time
Site: San Onofre  
Issue date: 09/21/1995
From: Marsh W
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9509270015
Download: ML20092L234 (2)


Text

_--.

1 e

i 4

a

/*****

Southem Califomia Edison Company

~

.r P. O. DOX 128 BAN CLEMENTE, CALIFORNIA 92674 0128 September 21, 1995

,m _

wAtrun c. umss MANAO& M OP NUCL i AM REQUL. A10FtY AFF AIRR (7 94) 388-7B01 U. S. Nuclear Regulatory Commission Attention:

Document Control Desk Washington, D.C.

20555 Gentlemen:

Subject:

Docket Nos. 50-361 and 50-362 Updated Final Safety Analysis Report (UFSAR), Revision 11 San Onofre Nuclear Generating Station (SONGS)

Units 2 and 3 The following addition will be made to the UFSAR in response to the latest review and comments on Proposed Change Number 299 by the Office of General Counsel.

"10 CFR 50.36 requires that:

Each license authorizing operation of a production or utilization facility of a type described in $50.21 or $50.22 will include technical specifications. The technical specifications will be derived from the analyses and evalue 'on included in the safety analysis report, and amendments thereto, submitted pursuant to $50.34. The Commission may include such additional technical specifications as the Commission finds appropriate.

Requirements originally located in technical specifications that were deemed Number (PCN) 299) pecification Improvement Program (TSIP; Proposed Change by the Technical S to be not derived from the safety analyses, were permitted to be relocated to either the Licensee Controlled S)ecifications (LCS) or the UFSAR. The LCS is incorporated by reference into t1e UFSAR, and is controlled by procedure S0123-XXX-2.4."

The next 10 CFR 50.71(e) submittal is scheduled for March 1996 following our ongoing SONGS Unit 3 outage.

In this submittal, Southern California Edison plans to incorporate this provision into Chapter 16.0, Technical Specifications, of the UFSAR.

If you have any questions, or require additional information regarding the content of the submittal, please contact me.

Sincerely,

$0 9509270015 950921 l

g1 PDR ADOCK 05000361

_. _K PDR.

\\

4

,a f55 Document Control Desk )

7 cc:

'L. J. Callan, Regional Administrator, NRC Region IV J. E. Dyer, Director, Division of Reactor Projects, Region IV j

K. E. Perkins, Jr., Director, Walnut Creek Field Office, NRC Region IV J. A. Sloan, NRC Senior Resident Inspector, San Onofre Units 2 & 3 M. B. Fields, NRC Project Manager, San Onofre Units 2 and 3 T.R. Tjader, Review Coordinator - CEOG STS, NRC Technical Specifications Branch t

- -