ML20092L272

From kanterella
Jump to navigation Jump to search
Amend 33 to Application for Ol,Consisting of Rev 11 to FSAR
ML20092L272
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 06/27/1984
From: Tucker H
DUKE POWER CO.
To: Adensam E, Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20092L273 List:
References
NUDOCS 8406290315
Download: ML20092L272 (2)


Text

DUKE Powen Goxnen-P.O. HOx 33180 CIIAHLOTTE, N.G. 28242 IIAL il. TUCKER TE LEPIEONE -

vu, pue. e=r (704)073-453

,.mm. . ,cm.

June 27, 1984 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation i U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Ms. E. G. Adensam, Chief Licensing Branch No. 4 Re: Catawba Nuclear Station Docket Nos. 50-413 and 50-414

Dear Mr. Denton:

Duke Power Company is filing herewith Amendment 33 to its Application for Licenses for the Catawba Nuclear Station, which is under construction pursuant to Construction Permits CPPR-116 and 117. This filing includes three signed original copies of the amendment along with Revision 11 to the Final Safety Analysis Report for the Catawba Nuclear Station. This filing also includes 61 copies of Revision 11 to the Final Safety Analysis Report and 2 large scale copies of the piping and instrumentation diagrams which were revised by Revision 11 to the FSAR.

Amendment 32 includes revised FSAR material as previously identified in my letter of June 25, 1984.

Copies of this Amendment 33 have been distributed in accordance with the requirements of 10CFR 2.101 and the instructions contained in Mr. Darrell G. Eisenhut's letter of June 2, 1981.

Respectfully submitted, C L Hal B. Tucker i s/3 HBT/sfc ' @JOS*c.e4 B406290315 840627 DR ADOCK 05000

Mr. HIrold R. Danton, Dirsctor Juns 27, 1984 Page 2 HAL 8. TUCKER being' duly sworn, states that he is Vice President of Duke  !

Power Company; that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory Commission this Amendment 33 to its application and documents appended thereto; and that all statements and '

matters set forth therein are true and correct to the best of his knowledge.

  1. d -

Hal 8. Tucker, Vice President ,

t 4

Subscribed and sworn to before me this 27th day of June, 1984.

dw C. dAJ Notary Public My Commission Expires:

L 2o . 19 TY

/

, - - - - .,e_.-,,.r._. . _ _ ,--, - . - ..-m - ,. . - ._, - - - _ ._ _ , , . _ . . _ -,_- _ . ,, , . _ __e.y___ , _ _ _ _,_

--_,-__.-,,,_,.-_,,-,_.7