Supplemental Final Deficiency Rept Re Rockbestos Cable. Initially Reported on 820421.Section of Defective Cables Removed & Penetrations Scrapped
ML20092L197
Person / Time
Site: Washington Public Power Supply System
Issue date: 06/19/1984
From: Root R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
GO1-84-0184, GO1-84-184, NUDOCS 8406290280
Download: ML20092L197 (1)


Text

_

itECSVED NRC Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99352

@ JM 2I(5

  • gp0

)

June 19, 1984 G01-84-0184 REGIOMVirg 5b-5/3 Mr. J. B. Martin Regional Administration Nuclear Regulatory Commission Region V 1450 Maria Lane, Suite 210 Walnut Creek, Calif. 94596

Subject:

NUCLEAR PROJECT NO. 4 DOCKET N0. 50-513 REPORTABLE 10CFR50.55(e)

ROCKBESTOS CABLE

Reference:

1) Telecon ME Rodin, Supply Syster, to PP Narbut, Region V, Nuclear Regulatory Commission, dated 1/26/82
2) G01-82-0060, dated 2/26/82, DW Mazur to RH Faulkenberry
3) G01-82-0152, dated 4/21/82, RW Root to RH Faulkenberry
4) G01-82-0413, dated 7/2/82, DW Mazur to RH Faulkenberry
5) G01-83-344, dated 6/29/83, RA De Lorenzo to DM Sternberg Reference 3) informed your office of a reportable deficiency under 10CFR50.55(e) and transmitted an interim status report on the subject condition.

Reference 4) provided the Supply System's final report on the above caption condition; however, a completion schedule had not yet been established.

Since it has been determined that the only cable involved is that used in the Unit 4 penetrations (see reference 4) this letter only refers to Unit 4 and Docket No.

50-513.

During contract closecut activities, it was agreed between the Supply System and Westinghouse that the WNP-4 penetrations would be destroyed or made non-reusable.

Therefore, sections of the defective cable were renoved and the penetrations have been scrapped.

In view of thi s action, we consider the activities associated with this 10CFR50.55(e) to be complete and will not submit any further reports.

l,'

R. W. Root, Director WNP-1/4 Program (821)

RWR. GAB:pp J-.

.cc: TA Mangelsdorf, BPC (862)

V Mani, UE&C (897)

EC Haren, UE&C (895)

NRC Doc. Control Desk, DC FDCC (899)

BDCC (828) 406290200 840619 ORM (847)

DRADocK05000g