Corrected Page 2 of Amend 83 to License NPF-47,reflecting Security Change
ML20092L433
Person / Time
Site: River Bend Entergy icon.png
Issue date: 09/12/1995
From: Wigginton D
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20092L434 List:
References
NUDOCS 9509270230
Download: ML20092L433 (2)


Text

_____-_ - -_-_

1 E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license Paragraph 2.D. is hereby amended to read as follows:

D.

The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, guard training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the author-ity of 10 CFR 50.90 and 10 CFR 50.54(p). The plans, which contain Safeguards Information protected under 10 CFR 73.21, are entitled:

" River Bend Station Security Plan," with revisions submitted through May 25, 1995; " River Bend Station Guard Training and Qualification Plan,"

with revisions submitte'd through December 3,1993; and " River Bend Station Contingency Plan," with revisions submitted through August 17, 1990. Changes made in accordance with 10 CFR 73.55 shall be implemented in accordance with the schedule set forth therein.

3.

The license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION David L. W' g nton, Senior Project Manager Project Directorate IV-1 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation i

Attachment:

1.

Page 6* of Facility Operating License No. NPF-47 Date of Issuance:

September 12, 1995 f

  • Page 6 is attached, for convenience, for the composite license to reflect this change.

1 9509270230 950923 PDR ADOCK 05CK10458 P

PDR

._-~-

' l p

P (13)

Partial Feedwater Heatina (Section 15.1. SER)

The facility shall not be operated with partial feedwater heating beyond the end of the normal fuel cycle without prior written approval of the staff. During the normal fuel cycle, the facility shall not be operated with a feedwater heating i

capacity which would result in a rated thermal power feedwater i

temperature less the 320*F without prior written approval of the staff.

i (14)

Emeraency Response Canabilities fGeneric Letter 82-33.

l Sunnlement 1 to NUREG-0737. Sect' on 7.5.2.4. SER and SSER 3.

Section 18. SER. SSER 2 and SSER 3)

E0I shall complete the requirements of NUREG-0737 Supplement #1 as specified in Attachment 5. is hereby incorporated into this license.

(15)

Salem ATWS Event. Generic Letter 83-28 (Section 7.2.2.5. SSER 3 E01 shall submit responses to and implement the requirements of l

Generic Letter 83-28 on a schedule which is consistent with that l

given in its letters dated August 3,1984 and May 20, 1985.

(16)

Meraer Related Reports 1

GSU shall inform the Director, NRR:

a.

Sixty days prior to a transfer (excluding grants of security interests or liens) from GSU to Entergy or any other entity of facilities for the production, I

transmission or distribution of electric energy having a i

depreciated book value exceeding one percent (1%) of GSU's consolidated net utility plant, as recorded on GSU's books of account.

I b.

Of an award of damages in litigation initiated against GSU by Cajun Electric Power Cooperative regarding River Bend l

within 30 days of the award.

I D.

The licensee shall fully implement and maintain in effect all provisions i

of the Commission-approved physical security, guard training and qualification, and safeguards contingency plans including amendments j

made pursuant to provisions of the Miscellaneous Amendments and Search i

Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).

The plans, which contain Safeguards Information protected under 10 CFR 73.21, are entitled:

" River Bend Station Security Plan," with revisions submitted i

through May 25, 1995; " River Bend Station Guard Training and Qualification Plan," with revisions submitted through December 3,1993; and " River Bend Station Contingency Plan," with revisions submitted through August 17, 1990. Changes made in accordance with 10 CFR 73.55 j

shall be implee.ented in accordance with the schedule set forth therein.

l i

L Amendment No. 70, 79, 83 i

i 2