Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20091E498 + (ML20091E498)
- ML20091E501 + (ML20091E501)
- ML20091E505 + (ML20091E505)
- ML20091E507 + (ML20091E507)
- ML20091E515 + (ML20091E515)
- LD-84-022, Informs That Info Re Operability of Shutdown Cooling Sys Relief Valves in CESSAR Design Will Be Provided by Aug 1984 Upon Resolution of Co Thomas 840424 Concerns + (ML20091E517)
- ML20091E520 + (ML20091E520)
- ML20091E526 + (ML20091E526)
- ML20091E533 + (ML20091E533)
- ML20091E536 + (ML20091E536)
- ML20091E550 + (ML20091E550)
- ML20091E564 + (ML20091E564)
- ML20091E578 + (ML20091E578)
- ML20091E592 + (ML20091E592)
- 0CAN058403, Application for Amend to Licenses DPR-51 & NPF-6,upgrading Tech Specs to Extend Leak Testing Interval for Sealed Radioactive Sources from 6 to 18 Months + (ML20091E594)
- 05000321/LER-1984-008, :on 840430,surveillance Coordinator Informed of Apparent Anomaly Re Due Date on Standby Gas Treatment Sys Ventilation & Valve Operability Procedure HNP-2-3655.Caused by Computer Programming Error + (ML20091E606)
- ML20091E610 + (ML20091E610)
- ML20091E613 + (ML20091E613)
- ML20091E632 + (ML20091E632)
- ML20091E638 + (ML20091E638)
- ML20091E644 + (ML20091E644)
- AECM-84-0307, Submits Commitment to Evaluate Design of Certain Seismic Monitoring Instruments to Determine Location,Range & Type of Instrument Prior to Restart Following First Refueling Outage.Proposed Tech Spec Changes Will Be Submitted + (ML20091E660)
- ML20091E667 + (ML20091E667)
- ML20091E679 + (ML20091E679)
- ML20091E689 + (ML20091E689)
- ML20091E719 + (ML20091E719)
- ML20091E749 + (ML20091E749)
- ML20091E752 + (ML20091E752)
- 05000324/LER-1984-006, :on 840504,while Decreasing Reactor Level for Reactor Feedwater Sparger Repairs W/Reactor Defueled & Fuel Pool Gates Installed,Reactor Level Decreased to Low Level Setpoint.Procedure Revised + (ML20091E754)
- ML20091E756 + (ML20091E756)
- ML20091E759 + (ML20091E759)
- ML20091E766 + (ML20091E766)
- ML20091E768 + (ML20091E768)
- NRC-91-0151, Suppls 891116 Application for Amend to License NPF-43, Revising TSs to Incorporate Testing & Insp Program to Assure Integrity of Portions of Control Room Emergency Filtration Sys External to Control Room + (ML20091E770)
- 05000339/LER-1992-005-01, :on 920311,steam Generator Tube Defects Discovered.Caused by Primary Water SCC & SCC Originating in Outside Diameter of Tube (Odscc).Defective Tubes Plugged & Removed from Svc + (ML20091E779)
- 05000423/LER-1992-007-01, :on 920305,nonlicensed Operator Failed to Perform Firewatch Tour of 45 ft,6-inch Elevation of West Motor Control Ctr Area Prior to Surveillance Test.Caused by Miscommunication.Hourly Firewatch Reinstated + (ML20091E781)
- ML20091E784 + (ML20091E784)
- ML20091E818 + (ML20091E818)
- ML20091E833 + (ML20091E833)
- HL-1925, NPDES Noncompliance Notification:On 911107,sample from Cooling Tower Basin Recorded Value Greater than 2 Ppm Free Available Chlorine/Total Residual Chlorine.Caused by Malfunction of Valve Torque Switch.Valve Manually Secured + (ML20091E846)
- ML20091E870 + (ML20091E870)
- ML20091E894 + (ML20091E894)
- 05000445/LER-1992-006, :on 920311,discovered That Two Surveillance Work Orders Failed to Include Calibr Instructions for P-9 Interlock,Channels N41 & N43.Caused by Personnel Error. Event Reviewed by All Maint Personnel + (ML20091E899)
- ML20091E900 + (ML20091E900)
- ML20091E905 + (ML20091E905)
- ML20091E925 + (ML20091E925)
- ML20091E934 + (ML20091E934)
- ML20091E943 + (ML20091E943)
- ML20091E948 + (ML20091E948)
- 05000461/LER-1992-004, :on 920311,unplanned Actuation of Group 11 Containment Isolation Valves Occurred.Caused by Failure to Prepare Sys Impact Matrix as Required by Administrative Procedure.Maint Procedure Revised + (ML20091E957)
- ML20091E964 + (ML20091E964)