Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20083P820 + (ML20083P820)
- ML20083P822 + (ML20083P822)
- ML20083P828 + (ML20083P828)
- ML20083P833 + (ML20083P833)
- ML20083P835 + (ML20083P835)
- ML20083P837 + (ML20083P837)
- ML20083P841 + (ML20083P841)
- B11121, Forwards Response to Chemical Engineering Branch Draft SER Open Item Re post-accident Sampling Sys.Sys Meets Five of 11 Criteria in NUREG-0737,Item II.B.3 + (ML20083P846)
- 05000423/LER-1995-007-02, :on 950416,partial CDA Signal Generated When Limit Switch Contacts Grounded While Performing Mods.Caused by Personnel Error & Programmatic Weaknesses.Reviews W/ Affected Dept Personnel Performed + (ML20083P848)
- ML20083P849 + (ML20083P849)
- ML20083P858 + (ML20083P858)
- ML20083P868 + (ML20083P868)
- ML20083P871 + (ML20083P871)
- ML20083P873 + (ML20083P873)
- ML20083P875 + (ML20083P875)
- B11108, Advises That Info in Generic Ltr 84-04 Will Be Utilized as Basis for Not Postulating Pipe Breaks in Primary Coolant Loop piping.Plant-specific Rept,Demonstrating Applicability of Westinghouse Generic Analyses,Will Be Submitted + (ML20083P879)
- AECM-84-0230, Forwards Responses to NRC 840411 Questions Re Major Unresolved Issues Concerning Tdi Diesel Engines.Summary Matrix of Enhanced Maint & Insp Testing Program Also Encl + (ML20083P881)
- ML20083P884 + (ML20083P884)
- ML20083P885 + (ML20083P885)
- ML20083P887 + (ML20083P887)
- ML20083P891 + (ML20083P891)
- ML20083P894 + (ML20083P894)
- B11098, Provides Summary of Radiological Results Re Steam Generator Tube Rupture Reanalysis.Table Containing Doses for All Analyzed Cases Encl + (ML20083P895)
- ML20083P897 + (ML20083P897)
- ML20083P905 + (ML20083P905)
- ML20083P908 + (ML20083P908)
- ML20083P911 + (ML20083P911)
- NLS8400119, Forwards Endorsement 64 to Nelia Policy NF-200 + (ML20083P912)
- ML20083P922 + (ML20083P922)
- ML20083P925 + (ML20083P925)
- ML20083P928 + (ML20083P928)
- 3F0595-14, Forwards Background Section,Brief Conclusion & Two Attachments Containing Summary of follow-up Questions & Util Responses to Study Performed by Gilbert Commonwealth Re Plant Fifth Tendon Surveillance + (ML20083P931)
- ML20083P934 + (ML20083P934)
- ML20083P938 + (ML20083P938)
- ML20083P944 + (ML20083P944)
- ML20083P945 + (ML20083P945)
- 05000395/LER-1984-017, :on 840329,diesel Generator a or Bus Undervoltage Started & Actuated Blackout Load Sequencer for Less That 10 S.Caused by Personnel Error.Warning Labels Installed on Circuits + (ML20083P946)
- 05000266/LER-1995-005, :on 950416,CR Personnel Initiated Manual Reactor Trip When CR E11 Dropped Part Way Into Core During Troubleshooting Activities.Caused by Failed Stationary Gripper Coil.Coil Fuse Replaced + (ML20083P951)
- ML20083P957 + (ML20083P957)
- TXX-9511, Advises NRC That TE Bain,Tj Daskam & Mj Sweet Will No Longer Be Performing Licensed Duties.Therefore,Plant Requests That Corresponding Licenses Be Terminated + (ML20083P959)
- ML20083P963 + (ML20083P963)
- ML20083P966 + (ML20083P966)
- ML20083P968 + (ML20083P968)
- 3F0595-16, Forwards 1994 Internal Cash Flow Projection for Plant + (ML20083P971)
- ML20083P975 + (ML20083P975)
- ML20083P977 + (ML20083P977)
- ML20083P980 + (ML20083P980)
- ML20083P982 + (ML20083P982)
- ML20083P985 + (ML20083P985)
- ML20083P989 + (ML20083P989)
- ML20083P998 + (ML20083P998)