ML20083P868
| ML20083P868 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 04/06/1984 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Bishop T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| ANPP-29247-BSK, DER-83-83, NUDOCS 8404200225 | |
| Download: ML20083P868 (2) | |
Text
.
yo sar Arizona Public Service Company SM 530 April 6,1984 ANPP-29247-BSK/TRB U. S. Nuclear Regulatory Commission Region V 24 Creekside Oaks Office Park w
1450 Maria Lane - Suite 210 h
m
^
Walnut Creek, CA 94596-5368
,,'s g@rp Attention: Mr. T. W. Bishop, Director sp Division of Resident Reactor Projects and Engineering Programs 1
Subject:
Time Extension For Report - DER 83-83 A 50.55(e) Potentially Reportable Deficiency Relating To Incorrect Sway Strut Supporting Class Q1A Piping Was Installed File: 84-019-026; D.4.33.2 Re ference: (A) Telephone conversation between P. Gage and K. C. Parrish on December 2, 1984 (B) ANPP-28540, dated January 4,1984 (Interim Report)
Dear Sir:
The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B).
At that time, it was estimated that a Final Report would be available by April 9, 1984.
Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by May 25, 1984, at which time a complete report will be submitted.
There is no new information or change to the Interim Report at this time.
Very truly yours, OUll._
A U l._
E. E. Van Brunt, Jr.
APS Vice President,' Nuclear.
ANPP Project Director 1
EEVB/TRB:ru cc: See Page Two 3404200225 840406
-PDR ADOCK 05000528 g
PDR _.
ac
~
/ r -'2 7 4 Ha
r eise e,
Mr. T. W. Bishop DER 83-83 Page Two ec:
Richard DeYoung Director Of fice of Inspec, in and Enforcement U. S. Nuclear Rege story Commission 4
Washington D. C. 20555 T. G. Wo od s, J r.
W. E. Ide D. B. Fasnacht-A. C. Rogers l
B. S. Kaplan l
L. A.-Souza J. Vorees J. R. Bynum P. P. Klute A. C. Gehr W. J. Stubblefield W. G. Bingham R. f.. Patterson R. W. Welcher H. D. Foster
)
D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiore111 S. R. Frost J. Self D. Canady.
Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, CA 30339 1'
a
(
)
i
- I.
L
_m_.
..s.