ML20083P982
| ML20083P982 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 04/12/1984 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Bishop T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| ANPP-29288-BSK, DER-82-76, NUDOCS 8404200288 | |
| Download: ML20083P982 (2) | |
Text
,.
c o p:
~
p.-
Arizona Public Service Company April 12, 1984 ANPP-29288-BSK/TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park Q
1450 Maria Lane - Suite 210 i
Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Pr.2',ects and Engineering Programs
Subject:
Time Extension For Report - DER 82-76 A 50.55(e) Potentially Reportable Deficiency Relating To Target Rock Valves Do Not Meet Specification / Test Requirements.
File: 84-019-026; D.4.33.2 Re ference: (A) Telephone conversation between P. Narbut and G. Duckworth on November 24, 1984 (B) ANPP-22590 dated, December 23,19?2 (Interim Report)
(C) ANPP-23223 dated, March 10, 1983 (Ti.ae Extension)
(D) ANPP-23641 dated, May 3, 1983 (Time Extension)
(E) ANPP-27523 dated, August 5,1983 (Titae Extension)
(F) ANPP-28247 dated, November 17, 1983 (Time Extension)
(G) ANPP-28608 dated, January 12,1984 (Time Ev. tension)
(H) ANPP-28884 dated, February 15, 1984 (Time Lvtension)
Dear Sir:
The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (D) and a Time Extension was requested by Reference (C), (D), (E),'(F), (G) and (H). At that time, it was estimated that a Final Report would be available by April 13, 1984.
Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by May 30, 1984, at which time a complete report will be submitted.
There is no new information or change to the Interim Report at this time.
\\
(
Very trul ua r
< H A d.'!9Mi h
%Ck E. E. Van Brunt, Jr.
APS Vice President, Nuclear dl:l Ud Ol Eff M:
ANPP Project Director EEVB/TRB:db cc:
See Page.Tw 8404200288 G40412 DR ADOCK 0500052s g
~
PDR 0
4n g
?
N 3-b Qw; x
..~.
- s.,
Mr. T. W. Bishop
'- s DER 82-76 n.
t Page Two i
Nt cc:
Richard DeYoung, Director.
- ,qw']'s Of fice of. Inspection and Enfon ement w\\
s s
s
\\g N
U. S. Nuclesr Regulatory Commission Washington, D. C. 20555, N-z-s
(
T. C., Woods, Jr.
W. E. Ide D.' B. 5'a snacht ~
~
A. C. Rog'ers B. 3. Kaplan L. A. Souza J-J. Votecs
'k
(
J. R.tBynum
- ?
\\ '
A. C. Gehr P. P. Klute'
,I
\\
W. J. Stubblefield s
]W. g. Bi6ghas R.'L. Patterson R. W. W'elcher H.
D.~ Foster-D. R. Hawkinson L~.-E. Vorderbrueggen G. A. Fiorelli d
S. R. Frost I
J. Self l
D. Canady.
wocords Center.
Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, GA 30339
.i
)
i
+
L-4 4
s c
g,.