Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20080D997 + (ML20080D997)
- 05000255/LER-1983-053-01, /01T-0:on 830806,during Normal Power Operation, Sample from Safety Injection Tank T-82D Showed Boron Concentration Below Tech Spec Limit.Caused by Minor Leak Past Loop Check Valve.Valves Will Be Inspected + (ML20080E000)
- NRC-84-0025, Notifies That Rev 2 to Rept of Independent Review of Environ Qualification Programs to NUREG-0588 Not Complete Reissue,Per .Several Rept Apps Had No Changes + (ML20080E002)
- ML20080E010 + (ML20080E010)
- ML20080E014 + (ML20080E014)
- 05000361/LER-1983-079-01, /01T-0:on 830804,while in Mode 1 During Routine Control Room Tour,Msiv 2HV-8249 Would Not Close & Declared Inoperable.Cause Unknown.Valve Will Remain Closed for Investigation + (ML20080E016)
- ML20080E021 + (ML20080E021)
- ML20080E026 + (ML20080E026)
- ML20080E027 + (ML20080E027)
- ML20080E036 + (ML20080E036)
- ML20080E039 + (ML20080E039)
- ML20080E040 + (ML20080E040)
- ML20080E049 + (ML20080E049)
- GO2-83-742, Final Deficiency Repts Re Conditions 264 & 276 Concerning Improperly Sized Overcurrent Devices & Diesel Generator 1A Bearing Failure,Respectively.Initially Reported on 830609 & 0802.Pump & Valve Operator Motor Fuses Replaced + (ML20080E050)
- ML20080E055 + (ML20080E055)
- ML20080E058 + (ML20080E058)
- ML20080E060 + (ML20080E060)
- ML20080E063 + (ML20080E063)
- AECM-83-0465, Discusses Comments in Sser 4,Section 22.2,II.B.3,re post- Accident Sampling Capability,Per 830822 Discussion W/F Witt. Forwards Procedures Re Grab Samples & Operation of in-line post-accident Sampling Sys.Analysis Data Encl + (ML20080E065)
- ML20080E071 + (ML20080E071)
- 05000285/LER-1983-007-03, /03L-0:on 830722,reactor Protective Sys Channel B Axial Power Distribution Positive Trip Setpoint Found Out of Spec Tolerance in Nonconservative Direction.Caused by Failure of Dual Potentiometer Module + (ML20080E074)
- ML20080E077 + (ML20080E077)
- ML20080E078 + (ML20080E078)
- ML20080E079 + (ML20080E079)
- 05000259/LER-1983-046-03, /03L-0:on 830726,during Routine Insp,Inspector Noted Standby Gas Treatment Train B Inoperable.Caused by Type Thed 136090 GE Molded Case Breaker Tripping.Breaker Reset + (ML20080E088)
- ML20080E091 + (ML20080E091)
- ML20080E095 + (ML20080E095)
- ML20080E101 + (ML20080E101)
- ML20080E102 + (ML20080E102)
- ML20080E105 + (ML20080E105)
- ML20080E106 + (ML20080E106)
- ML20080E109 + (ML20080E109)
- ML20080E111 + (ML20080E111)
- ML20080E112 + (ML20080E112)
- ML20080E115 + (ML20080E115)
- ML20080E116 + (ML20080E116)
- ML20080E117 + (ML20080E117)
- ML20080E120 + (ML20080E120)
- ML20080E123 + (ML20080E123)
- ML20080E124 + (ML20080E124)
- ML20080E126 + (ML20080E126)
- W3P83-2581, Confirms Discussions W/Nrc Re Harstead Engineering Assoc,Inc Analysis of Water Seepage in Concrete Basement.Rept Will Be Issued by 830901 + (ML20080E128)
- 0CAN078312, Annual 10CFR50.59 Rept for 1982 + (ML20080E129)
- ML20080E135 + (ML20080E135)
- ML20080E139 + (ML20080E139)
- ML20080E142 + (ML20080E142)
- ML20080E144 + (ML20080E144)
- ML20080E156 + (ML20080E156)
- ML20080E166 + (ML20080E166)
- 05000336/LER-1994-041, :on 941208,review of Event That Occurred on 941020 Indicated Loss of Electrical Facility Separation. Caused by Degraded Condition of Floor Drains.Immediate Isolation of SW Flow Initiated + (ML20080E189)
- A830019, Forwards Info Re Intergranular Stress Corrosion Cracking Observed in Core Spray & Reactor Water Cleanup Sys,Per 830822 Request.Weld Overlay Repairs Meet Safety Margins of App X to Section IX of ASME Code + (ML20080E193)