'A DUKE Powen GOMPAhT P.O. DOX 33180 CHARLOTTE. N.O. 28242 HALH. TUCKER reternoxe January 30, 1984 (ro4) ara-4 sat v.n m -
NtOLRAB PRODUCTION M.HaroldR.Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Attention:
Ms. E. G. Adensam, Chief Licensing Branch No. 4
Subject:
Duke Power Company Catawba Nuclear Station Docket Nos. 50-413 and 50-414
Dear Sir:
l Please find attached five copies of Revision 3 of the Duke Power Company Response l
to Supplement I to NUREG-0737 for Catawba Nuclear Station. This document was l
originally submitted as an enclosure to my letter of April 14, 1983.
k
(
Revision 3 contains the following corrections to the Control Room Review Supple-mental Report, Unit 1, Appendix D, Implementation Priority Schedule.
(a)Section I (Physical Changes) - Delete HED, 6,14, 52 (b)
Section I (Surface Enhancements) - Add (P) for partial imple-mentation to HEDS 367, 400, 405, 408 (c)Section II (Physical Changes) - Delete HED 429A (this HED is listed under Appendix C HEDs Not Corrected)
- Add HED 457 (d)
Section II (Surface Enhancements) - Delete HED 242 (this HED is covered by HED 80
- Correct HED 238 between HEDs 341 and 361 to be HED 348
- Add HEDs 367(P), 400(P), 405(P), and 408(P)
Revision 3 also contains, as a new page Page 6-7 which was omitted during the initial assembly of the document.
Instructions for inserting Revision 3 into the Catawba document are included as part of the attachment.
Very truly yours.
- e/A$-
Hal B. Tucker JSW:scs - Attachments 8402090323 840130 l
l PDR ADDCK 05000413
[ c.
(
s o
\\
Mr. Harold R. Denton, Director Page.Two January 30, 1984,
(-
Mr. J. P.'O'Reilly,\\ egional Administrator Palmetto Alliance R
cc:
U. S. Nuclear Regulatory Commission 2135 1/2 Devine Street Region II Columbia, South Carolina 29205 101 Marietta Street, Suite 2900 Atlanta, Georgia 30303 Robert Guild, Esq., Attorney-at-Law Mr. Jesse L. Riley
- P. O. Box 12097 Carolina Environmental Study Group c
Charleston, South' Carolina 29412 854 Henley Place Charlotte, North Carolina 28207 Dr. K. N. Jabbour r
NRC."roject Manager Mr. P. K. Van Doorn Office of Nuclear Reactor Regulation NRC Resident Inspector U. S. Nuclear Regulatory Commission Catawba Nuclear Station Washington, D. C.
20555 Mr.-Henry A. Presler, Chairman Charlotte-Mecklenburg Environmental Coalition 943 Henly Place L Charlotte, North Carolina 28207 s
I 1
)
.i 13,-
t 't h
t
- 5{
DUKE POWER COMPANY CATAWBA NUCLEAR STATION Reeponse to Supplement 1 to NUREG-0737 s
Document Revision Transmittal
' Revision No. 3 Instruction Sheet Revise Volume 1 as Described Below:
Remove' Control Room' Review Supplemental Insert Control Room Review Supplemental Report, Unit 1 (Tab 3.4) Appendix D Report Unit 1 (Tab 3.4) Appendix D Section I, HED Solutions to be Completed Section I, HED Solutions to be Completed prior to Fuel Loading prior to Fuel Loading, Revision 3 l-Remove' Control Room Review Supplemental Insert Control Room Review Supplemental Report, Unit 1 (Tab 3.4) Appendix D Report, Unit 1 (Tab 3.4) Appendix D Section II, HED Solutions to be Completed Section 113 HED Solutions to be Completed by the end of the Fixst Refueling
-by the end of the First Refueling, Revision 3 i
l-Revise Volume 2 as Described Below:
Insert Page 6-7, Revision 3 (New Page) il'
- I - -
I
____________m.
Emergency Operating Procedures Implementation Assistance (EOPIA) Review Group and published by INP0.
Duke Power was an active participant in this industry working group.
The Catawba Nuclear Station Procedure for Validation of Emergency Procedures is included as an attachment within this submittal.
6.6 EMERGENCY PROCEDURES TRAINING PROGRAM DESCRIPTION In preparation for Unit 1 license examinations, an EP training program consist-ing of a total of 32 weeks of classroom, in plant, and simulator training is planned.
EP training will occupy a total of approximately four weeks (160 hours0.00185 days <br />0.0444 hours <br />2.645503e-4 weeks <br />6.088e-5 months <br />) of training in the classroom and control room at Catawba Nuclear Station and a portion of the four weeks of simulator training at the Technical Training Center.
The classroom /in plant training is scheduled for the last half of 1983.
This will include classroom lectures of the EP steps and discussion of the following source documents:
o Westinghouse ERG's o Catawba Plant Specific Technical Guidelines c Catawba EP's in most current revision Following the classroom discussion, the procedure steps will be followed in the Catawba Nuclear Station control room, locating instruments and controls necessary for event diagnosis and control.
l l
Simulator training is scheduled for the first quarter of 1984.
During this training, operators will use Catawba Nuclear Station procedures to respond to instrument failures, analyzed transients, and multiple malfunction.
It is 6-7 Revision 3 New Page L..
I.
HED Solutions to be completed prior to fuel loading.
Physical Changes 5
18 22 28 53 73 74 77 78 86 120 t.
114 424A Surface Enhancements 2
13 36 51 83 87.
91 98 244 304
.307
-325 327 361 (P) -
367(P) 395 (P) 399 400 (P) 405 (P) 408 (P)
~464 467 (P) 482 (P)
(P) Partial implementation before fuel load, partial implementation after fuel load.
Revision 3
-u 1
1.
II.
HED Solutions to be completed by the end of the first refueling.
Physical Changes 8
88 274 359 424H 9
89 283A 366 426.
10 92 283E 371A 429B 19 1 02 301 392B 429C 30 104 324 41 6 430 42 105 332 422A 437 43 108 343 4?28 457 45 113 344 422D 468 48 124 345 422E 469 58 125 350 422F 470B 59 202 352 422G 490 60 250 353 422H 505 64 2 51 354 424B 51 2 68 253 355 424C 526 L
72 254 357 424F 532 79 273 358 4?4G 584 Surface Enhancements 32 214 363 392A 446 41 215 367 (P) 395(P) 463 46 219 368 400 (P) 467 (P) 80 235 369 402 482 (P) 84 238 374.
403 495 117 241 378 405(P) 509 119 255 379 406 522 2 04 256 381 408(P) 525 206 232 382 411 534 207 338 387 413 594 208 341 390 415 211 348 391 417 361 (P) 423 (P) Partial implementation before fuel load, partial implementation after fuel load.
Revision 3