PUBLIC SERVICE INDIANA February 6, 1984 S. W. Shields SVP-0084-84 Senior Vice President -
Nuclear Division Mr. Harold R. Denton, Director Docket Nos. STN 50-546 Office of Nuclear Reactor Regulation STN 50-547 U.S. Nuclear Regulatory Commission Construction Permit Nos.:
Washington, D.C. 20555 CPPR-170 CPPR-171
SUBJECT:
Marble Hill Nuclear Generating Station, Units 1 and 2
Dear Mr. Denton:
As I indicated to you in my letter of January 18, 1984, the Board of Directors of Public Service Company of Indiana, Inc. (PSI) has decided that the company is financially unable to proceed with the construction of the Marble Hill Nuclear Station.
Cancellation of the project is contingent upon the action of PSI's partner, Wabash Valley Power Association (WVPA). At this time, WVPA is continuing to consider its options with respect to completion of Marble Hill. Accordingly, safety-related activities in the areas of design, engineering, and construction have been suspended and project activities are being concentrated in the areas of records retention and maintenance of materials and equipment.
The quality assurance program remains in force.
Safety-related procedures have been reviewed and in some cases revised. Only those administrative and programmatic procedures that directly impact the retention of records and maintenance of safety-related equipment and material will remain active. Attachment 1 lists those active programmatic procedures at Marble Hil'. All other procedures will be considered inactive.
Changes to the active procedures will be made in accordance with the quality assurance program.
During the suspension of construction, no amendments will be made to the Marble Hill Final Safety Analysis Report or Environmental Report.
Ilowever, PSI will keep you informed of significant changes in the quality assurance program.
In the event of restart of construction, the appropriate changes to the licensing documents will be made through amendments.
8402090349 840206 PDR ADOCK 05000 g
P. O. Box 190, New Washington, Indiana 47162 812. 289.1000 l
[.
samnce waANA Mr. Harold R. Denton
'Page 2 February 6, 1984 SVP-0084-84 It is PSI's intention at this time to maintain the plant and the construction permit to allow possible restart pending WVPA's decision.
Because of the reduction in construction work force and corresponding reduction-in PSI manning requirements, Division organization has been modified and is shown on Attachment 2.
Those organizational elements needed to support on-going activities are in place.
If you have any questions, please call.
Sincerely.
S. W. SHIELDS SWS:JUB:bmh
.cc: Director of Inspection and Enforcement U.S. Nuclear Regulatory Commission.
Washington, D.C. 20555
.J. G. Keppler J.-E. Konklin-J. F. Schapker-P. W. O' Conner
{'
Revicion O Date: January 17, 1984 l
Page 1 of 1 i
PUBLIC SERVICE INDIANA i
AMENDED STATEMENT OF POLICY l
DURING SUSPENSION OF WORK ACTIVITIES Safety-related activities in the areas of design, engineering and con-struction have been suspended effective December 30, 1983.
During this period of suspension, the retention of records and mainte-nance of equipment activities will proceed. The Quality Assurance pro-grams remain in force and appropriate provisions therein will be follow-ed for all work performed on safety-related items.
PSI will hold in suspense, but not further process, outstanding documentation, except that which is required to be done to enable the maintenance program and records retention activities to proceed.
j ()
During this period of time, the procedures listed on the attached list are to be considered active and. will be implemented to the extent neces-sary to perform maintenance and records retention activities. All other procedures not listed are to be considered inactive and all in-process work affected by these procedures is rsuspended.
Changes to the active procedures when necessary will be made in accord-ance with the provisions of the Quality program.
Senior Vice-President -
Nuclear Division I
[
Dated:
f v
Attachment
~.
I Revision 0 i
Page 1 of 4 i
Date: January 17, 1984
)
ACTIVE PROCEDURES LIST
~
PROJECT MANAGEMENT PROCEDURES
[
2-1 Quality Assurance Manuals 1
2-2 Indoctrination and Training 2-3 Stop Work Orders 2-4 Handling NRC Inspection Reports
^
3-5 Nuclear Regulatory Comission Bulletins, Circulars and Information Notices l
3-10 Project Engineering Reports 3-12 Electrical Equipment Qualif'ication 4-1 Bid Evaluation i
i 4-2 Procurement i
j 5-1 Project Management Procedures 5-3 Review of Contractor-Prepared. Procedures
.l 5-4 Review and Approval of Supplier Procedures 5-5 Special Project Procedures 5-8 Technical Manual r" :-c 6-1 Document Control 7-1 Review of Supplier and Contractor Quality Assurance Manuals 7-2 Supplier and Contractor Qualification 7-3 Approved Cupplier/ Contractor List 7-4 Source Surveillance 7-5 Receipt Inspection 7-6 Release of Material and Items 7-7 Quality Engineering Surveillance Activities 7-8 Preparation of Quality Assurance Checklists
1 Revision 0 Page 2 of 4 Date: January 17, 1984 j q i
7-10 Receiving of Material and Items
{
7-12 Materials Management Information System 7-13 Item Identification Standards I
(
7-15 Inventory Control 7-19 Storage Maintenance Information System t
8-1 Correcting, Highlighting and Replacing ASME Code Name Plates 10-1 Qualification and Certificatian of l
Quality Assurance Personnel l
10-2 Mandatory lloid Points 12-1 Control of Measuring and Test Equipment i
13-1 Storage, Handling and Maintenance of j
Material and Items f')
13-2 Storage and Warehousing I
l 13-3 Off-Site Shipments 13-4 Construction Fire Prevention and Protection Program i
i 13-5 Construction & =cakaaping f
14-1 Inspection Status i
15-1 PSI Nonconformance Reports 15-2 Processing of Supplier / Contractor Nonconformance Documentation i
i 16-1 Corrective Action Requests 16-2 Quality Trending 16-3 Reporting of Defects and Noncompliances to the NRC 16-4 Management Corrective Action Reports 17-1 Quality Assurance Records File Control
L Revision 0 l
i Page 3 of 4 Date: January 17, 1984
,fO 17-5 Correcting, Changing or Supplementing Quality Assurance Records 18-1 Audits 18-2 Qualification and Certification of Audit Personnel 18-3 Management Audits I
TEST INSTRUCTIONS TI-1 Test Instruction Preparation, Review and Approval 6;
TI-17 Equipment Clearance Procedure TI-20 Startup Work Permit 5
l TI-21 Design Change Control I)
TI-23 Maintenance and Repair i
STATION PROCEDURES i
l MH-12-SX-00-001 Development, Review and Approval i
of Station Procedures l
M-12-SX-00-002 Station Organization and Responsibility M-12-SX-00-006 Procedure Adherence M-12-SX-00-008 Station Housekeeping Procedure M-12-SX-00-009 Equipment Clearance Procedure M SX-00-010 Switching Orders 3
i M-12-SX-00-013 Connercial Receiving Inspections MH-12-SX-00-014 Identification and Control of Materials, Parts & Components C
MH-12-SX-00-015 Handling, Storage and Shipping of Materials, Components and Equipment
I Revisi:n 0
[
Page 4 of 4.
Date:
January 17, 1984 l
^\\
t M-12-SX-00-029 Special Orders l
M-12-SX-00-030 Preventive Maintenance M-12-SX-00-031 Corrective Maintenance M-12-SX-00-032 Selection Procedure for l
Bargaining Unit Positions I
i E-12-SX-00-037 In-Place Storage Maintenance Administration M-12-SX-00-039 Issues and Returns of Materials, g
Components & Equipment i
E-12-CX-00-001 Chemistry and Health Physics Procedures.
Orders and Instructions M-12-CX-00-003 Chemistry Program Controls Procedure 4
MH-12-EX-00-001 Electrical Tests and Checks W-12-IX-00-003 Measuring and Test Equipment Calibration p
and Control Requirements g
E-12-IX-00-006 Instrument Department Records 3*
and Records Management M-12-IX-00-008 Identification and Reporting of Out-of-Tolerance Measuring and Test Equipment M(-12-MX-00-003 Maintenence Oniers MH-12-MX-00-004 Maintenance Implementing Instruction i
Development j
MH-12-MX-00-005 Welding Material Control i^
Mi-12-0X-00-001 Duties and Responsibilities of Operations Department Personnel E-12-0X-00-002 Operating Logs MH-12-0X-00-004 Temporary Alterations
~?
M 0X-00-005 Daily Instructions MH-12-0X-00-012 Temporary Alterations Tracking (Post Turnover)
^
e O. a e
0
>g h
DW 5
E a
m NbN
~
5 m
g s
W g
g z
o
w
~~
e i
l Senior Vice President -
Nuclear Division S. W. SHIELDS (T. BURNS On-Loan (W. WOGSLAND B. HENSLEY (F. HODGES Vice-President Div. Admin.
Division Exec. Director Exec. Director Nuclear Regu-Nuclear Serv.
Manager Personnel Mgr.
Nuclear Quality Nuclear Prod.
lation & Aff.
Assurance Manager W.
PETRO M. MORRIS M. LYLE J. BOTT R. STARKEY J. BOTT (acting)
O e
1/03/84
1 i)l1ll e
e N
I N
L RORW AIEE ETGN LAA CLN UUAE 4
NGM 8
E
/
R M
'l
/
1 NO I
TAZ I
NAG R
O SR I
AF F
R A
&EGT SAT RNNO S
AOAB N
EI M O
LT C A. S U I
T U
R H
A.
Nl I GAJ I
U EF G
RF E
A R
RA E.
IC f
iN s
STC G
E N
J RE O
EG R
GE P
AW N
L A
A MS I
C E
R P
S g
l1lI1lll x
t i
S f
NR f
C O O
II r
TK e8 t*',3 AN d=
t I I a
ED r.
r RN A
o O
R) p OG L
ro B
C A
I o
T TR s
NO e
E S n
MI r
YV a
D m B
I i
P P
iU R
DS u
kN
N ER e
- M k
t.
t O NE l
sn a
I v I NI T
r S ON D
LF D
I SN EV V RA NF I
EM M
ND J
D P O
S K.
mG t
FmN TART SE Y
C T
IR I
WO y
N
- t. T e
U T n
t A l
I sN s
RN u
I n
OA h
D e
PT c
MO g
R PS t
I I
OI i
S M
O C
N mS L
2 A E
t JF R
P AC l
t l
i(
illl lll 1
I
!l l1 l
l
QUALITY ASSURANCE ORGANIZATIN EXECUITVE DIRECIOR NUCLEAR QUALITY ASSURANCE J. U. Bott (acting)
Clerk A S. Warren 1
QUAT m AUDIT oA ENGINEERING MANAGER ADMINISTRATIN N
D.A. Dedrick L.A. Nicodenus K. Tvaer factinal i
F. Carchedi S. Howell L. Worley
- R. Hagood R. Minnich D.. Schwartz-D. McCarty Il
-ii i i
r
NUCLEAR SERVICES ORGANIZATION l
VICE PRESIDENT l
NUCLEAR SERVICES W. M. PETRO E. Schlinger D. Layden H. Tameris PROJECT CONSTRUCTION PURCHASING PROJECT A/T CONTRACT CONTROLS MANAGER MANAGER ENGINEERING SUPERVISOR, MINISTRATOR
^
^
b*
F. WARNER B. A. SPENCE S. E. QUINN l;B. Sohn S. Easley R. Brown C. Cadonic S. Brewer A. Arce I. Leichner V. Howard W. Muensterman R. Duff D. Couch D. McA111ste J
J. Roberts T. Phillips M. Evarts S. Robbins M. Vire J. Crossman N. Farr M. Mensing W. Monroe C. Togni
\\
NilCIJ:AR Pit tI CTI(N OHCANIZATTm 1:xumt ive
'.} [
R.D. Starkey Pauluction l
l l
l
_ _. 21.
~
l PAricar g
Production R.D. Starkey SuFport C. ILirris (acting)
Miruger (actitv})
l Qerations D. VonDielingen Mninterunce J. Rutkowski Owsnistny
~
l_,.
i I
Mirwpr (acting)
M1 nager
& Ilealth Ihysics C. Ibrris Production Tech.
W h ion C. ILirris Muwnr Servicer. Minaer
. Senims C. Ibnis
_T,,
(acting)
Surervisor (acting)
Radioctwsnistry Assistant licalth Physics Operations D. VonDielirvjen Supervisor CallT' O u >rd.
Supervisor Production Ticli' cr Ox1 tract C. Ibrris D.16nes C. Ibrris services Stuer.
9servisor Kiruger (actirwj)
(act iruj)
(acting) lil.eria1s t
l l
L.D. Elam D.
rver J. RAx:rts Shift D. VonDielingen Srlgfwl.-Ox5n. Radiochrsnist Cbntrol (acting)
___t Supervisor D.14 pes Constria: tion ~
Stoclanen Stockmen _ _
Uhit Operatnrs D1uipnent Operators J.R. Ibwling P.J. B rkus K.J. Scott L.C. Coins A.L. Ibrold J.W. Taylor M.R. Kelly R. PersirxJer D.E. Ibs turvi P.A. Ituf f W. Mflurg G.E. Snell P.T. Beyerle D.R. Dilbeck J.A. Dorgay J.F. taxklerman R.A. Piggott C.R. Black E.E. DimyJer J.P. Vise Matrixed to Itzv. 1/30/84
~
M m m m ce w aceR J. P.IITKOWSKI Senior Senior Main?Sb3nce Bldg. & Grounds 8
Machanical Supv.
Cmd hor Su m i m W.
FARMER E. STRICllTEN R. GILLESPIE H. STifCKER I
l l
1 Mechanics Electricians I&C Utilitymen Janitors i
.i. W. IlOPPER R. A. GROSS J. W. HICKMAN W. E. McCLELLAN T. T. AMOS D. P.
I.ENFERT G. C. WICKS R. L. PERRYMAN K. M. HARMORE J. V. LEWIS D. C. MATilEW C. L. PERKINS A. D. LEWIS S. L. BELL J. D.
BRANCil N. L. STEELE C. W. CORTNEY S. Klechamer; C. G. MCKINNEY B. W. TOHLIN L. E. IIALL
)
F. A. FRIPBEYER J. R. F0llTS I
1 T. P. ffcDA?"EL J. L. DICKIE S. R. SMITII
.I.
O. SIITTON R. G.
IIORTON i
Rev. I i
l/31 /84
PRODUCTION DEPARTMENT PERSONNEL l
RETAINED AND TRANSFERRED TO DIVISION ADMINISTRATION NAME TRANSFERRED TO L. SONTAG DIVISION ADMINISTRATION - ACCOUNTING P. HARRIS DIVISION ADMINISTRATION - ACCOUNTING A. R. GREE *4 DIVISION ADMINISTRAT' ION - OFFICE SERVICES C. HOFF DIVISION ADMINISTRATION - OFFICE SERVICES K. BRINER DIVISION ADMINISTRATION - OFFICE SERVICES D. ENGLER DIVISION ADMINISTRATION - OFFICE SERVICES L. BOLDREY DIVISION ADMINISTRATION - OFFICE SERVICES Rev. I 1/04/84 l
l
[_
a
~, '.
DIVISION ADMINISTRATION M. Morris
- 8. Lipsey ACCOUNTING GENERAL SERVICES RECORDS MANAGEMENT INFORMATION SYSTEMS OFFICE SERVICES PAYROLL / BENEFITS DOCUMENT CONTROL M. Wenning W. Smith P. Schaeffer G. Walker A. Green L. Sontag T. Muffler D. Meece S. Schmitt P. Harris A. Stethen D. Wilkey L. Boldrey D. Wells M. Crabtree P. Carey C. Hoff l
J. Spillman N. Condrey A. Austin K. Briner S. Clegg M. Linville D. Engler J. Lacefield SECURITY C. Francis s
i MLM 1/5/04
'