Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000424/1993018 + (ML20059B218)
- ML20059B219 + (ML20059B219)
- IR 05000277/1993015 + (ML20059B220)
- ML20059B221 + (ML20059B221)
- ML20059B222 + (ML20059B222)
- ML20059B223 + (ML20059B223)
- ML20059B227 + (ML20059B227)
- ML20059B229 + (ML20059B229)
- ML20059B230 + (ML20059B230)
- ML20059B232 + (ML20059B232)
- IR 05000461/1993025 + (ML20059B233)
- ML20059B236 + (ML20059B236)
- ML20059B237 + (ML20059B237)
- ML20059B238 + (ML20059B238)
- ML20059B242 + (ML20059B242)
- IR 05000416/1993031 + (ML20059B243)
- ML20059B246 + (ML20059B246)
- IR 05000445/1993037 + (ML20059B251)
- ML20059B252 + (ML20059B252)
- 05000455/LER-1990-003-11, :on 900717,feedwater Isolation Occurred Due to Inability to Control Level in D-5 Steam Generators at Low Power Levels.Caused by hi-hi Narrow Range Level on Steam Generator 2A.Signal Reset & Sys Realigned + (ML20059B253)
- ML20059B255 + (ML20059B255)
- ML20059B259 + (ML20059B259)
- ML20059B260 + (ML20059B260)
- ML20059B261 + (ML20059B261)
- ML20059B265 + (ML20059B265)
- ML20059B268 + (ML20059B268)
- ML20059B270 + (ML20059B270)
- ML20059B272 + (ML20059B272)
- ML20059B274 + (ML20059B274)
- ML20059B275 + (ML20059B275)
- ML20059B276 + (ML20059B276)
- ML20059B277 + (ML20059B277)
- ML20059B278 + (ML20059B278)
- IR 05000443/1993017 + (ML20059B279)
- 05000155/LER-1990-003-01, :on 900722,plant Shutdown Initiated Due to Defect in Reactor Coolant Boundary in Reactor Cleanup Sys. Caused by Sensitization of Pipe Matl Due to Overlapping Heat Zones.Spec Change Implemented + (ML20059B281)
- 05000424/LER-1990-016, :on 900723,determined That Failed 4,160/480- Volt non-1E Transformer Led to Main Feed Pump Trip & Reactor Trip.Caused by Internal Fault in 1NB01 Transformer.Failed Transformer Replaced + (ML20059B283)
- IR 05000341/1993024 + (ML20059B284)
- IR 05000483/1993016 + (ML20059B285)
- 05000346/LER-1990-010, :on 900518,inadvertent Safety Features Actuation W/Injection of 1,000 Gallons Borated Water Occurred W/Plant in Mode 5.Caused by Loss of 120 Volt Ac Bus Y3.Personnel Retrained + (ML20059B286)
- 05000277/LER-1990-017, :on 900724,HPCI Declared Inoperable Due to Battery Charger 2B Transient.Caused by Degradation of Foam Rubber Electrical Module Support Piece.Foam Replaced & Procedures Revised to Include Foam Replacement + (ML20059B287)
- ML20059B288 + (ML20059B288)
- L-90-301, Discusses Generic Implications & Resolution of Control Element Assemblies Failure at Plant + (ML20059B289)
- 05000245/LER-1993-010-01, :on 930917,determined Unit 1 Has No Automatic Reactor Recirculation Pump Runback Circuitry in Place.Caused by Incorrect Analysis Assumption in Original Plant Accident analysis.Re-analysis Performed + (ML20059B293)
- ML20059B295 + (ML20059B295)
- ML20059B297 + (ML20059B297)
- IR 05000255/1993025 + (ML20059B299)
- ML20059B303 + (ML20059B303)
- 05000416/LER-1990-013, :on 900725,instrument Cable from B Detector Disconnected Rather than C Detector While Performing Maint on Monitoring Sys.Caused by Personnel Error.Personnel Counseled on Methods for Self Verification + (ML20059B307)
- IR 05000302/1993029 + (ML20059B308)
- ML20059B309 + (ML20059B309)
- 05000416/LER-1990-011-01, :on 900724,reactor Tripped on High Reactor Water Level W/Reactor Power in Process of Being Reduced in Attempt to Control Turbine Pump B Oscillations.Caused by Malfunction of Controller.Controller Calibr + (ML20059B310)