f SilLLSTONE NUCLEAR POuTR STATION GENERAL OPERATING PROCEDURE A

e Emergency Light Inspection

.\\1P 790.2 Rev.15 I

l Approval:

b Lnit Director PORC Mtg. No:

I-93-3V u-2s-93 Effective Date:

l Subject Matter Evert Level of Use Tony Ross i

bral ffhCK05000245 95 931022

?~;

DR

["E p

PDR g,

4 Millstone Unit 1 Generst Opersting Procedure Emergency Light Inspection TABl F OF CONTEVTS I

l 1.

PURPOSE l

2.

PREREQUISITES 4

3 PRECAUTIONS 5

4.

INSTRUCTIONS 5

Non-Appendix R ELUs (Dual Lite)

J.1 6

42 Appendix R ELUs (Mamille/Helephane) 10 l

4.3 Troubleshooting and Repair 1:

4.4 Discharge Test 15 5.

REVIEW AND S10NOFF 15 6.

REFERENCES IP I

7

SUMMARY

OF CHANGES ATTACHMENTS AND FORMS 16. " Location of Non-Appendix R ELUs" i

1?

I. " Location of Appendix R ELUs" Form 190.2-1. "ELU PM Data Sheet" l

Form 790.2-2. "ELU S - Hour Discharge Test Data Sheet" t

l MP 790.2 Level of Use bN"I of 21

I i

1. PURPOSE 1.1 Objectis e The objectise of this procedure is to provide the method and parameters necessary to senf> c.e.se.hty of the Unit 1 battery powered Emergency l

Lighting Units (ELU) to function as intended.

1.2 Discussion This procedure presides instructions for the periodic testing of ELUs. as well as instructions for troubleshooting and repair, For ELUs that do not fall under the Appendix R program, this procecure i

intenced to be a general guide.

For ELUs that fall under the Appendix R program. this procedure presides.

guidance for documentation of test results, detailed troubleshooting, repair.

and retest instructions. and instructions for reporting of failures. This procedure also instructs the user en the requirements for placing a new ELU in senace.

1.3 Applicability

. On l

This procedure applies to the following ELUs I

Non-Appendix R emergency lights (Dual Lite)

Appendix R emergency lights (Manville/Holophanet 1.4 Frequency ELU inspection is performed semi-annually.

2. PRFRFOU191TES l

2.1 Genersi An Automated Work Order has been prepared and approsed i

2.1.1 as nece Jory by Unit One Operations Department and Qualit>

i Services Department.

2.2 Documents 2.2.1 Maint. Form ~90.2-1. "ELU PM Data Sheet"

  1. *'2 Level of Use 2 oili I

Genersi i

4

.2.2 Maint. Form 790.2-2, "ELU 8 - Hour Discharse Test' 2.3 3!essurement and Test Equiprnent (3f&TE)

All M&TE has been calibrated in accordance with ACP-QA-9 04. -Control and Calibration of Measuring and Test Equipment' and the cahbration is current.

Digital Multimeter. Range: 0 - 200 mVDC. 0 - 2 \\ DC. 0 - :]

VDC. 0 - 200 VDC: Accurser 0.05% such as QA-Iff 5.

1!87, or if17 AMP Crimping Die Assembly GOSO-GO Plug Gage PLATFORM INSLLATION WlRE SIZE ELEMENT DIAstETER

, DIE NDfBER DIAMETER (AWG)

GO l

S0-G0 0.160 l

16 l 0.0720-0.07:3 l_0.0779-0 0 50

!S080-3 0.160 l

14 l 0.0770-0.07 3 l 0.08:9-0 0830 ;

1 2.4 Tools and Censumables 2.4.1 Spare Parts. as necessary Red indicating lights 6

Green inducating hghts Amber indicating lights Scaled beam illuminating lamps AMP Fasten receptacle terminals P!N 3-f:0408-:

Charging cards t

Batteries i

MP 790.2 Level of Use l Rev. If l

gg 3 of 21' I

4 O.J.2 Tools Scren drn er I

Nonconducting toothbrush AMP platform die hand crimping tool P;N !80 S-3 AMP crimping die assembly PN !!080-3

.J.3 Consumables Rags Demineralized water, as necessary Petroleum jelly

.5 Responsibilities FPQA data must be independently verified by another indiudual as specified by the indicated sections of this procedure.

i 2.6 Definitions 2.6.1 ELU - Emergency Lighting Unit

3. PRFf" AlmONS Exercise care when working around energized or potentially energi:ed 3.1 electrical equipment.

Ensure that use and disposal of chemical products are performed :n i

3.2 accordance with ACP-6.09. " Chemical Ha:ardous Waste and Substance Control."

i Ensure that consumables are used in accordance with AC 3.3

" Consumable Materials Control Program."

i If ambient temperatures are less than 6."F or greater than 90*F. then 3.4 consult Maintenance Engineer or Unit ! Engineerms for possible l

temperature correction of raw data.

j FPQA data must be independently senfied by another individual.

3.5 usually another electrician.

I.

MP 790 l

Level of Use Rev.15 i

Gearai 2,, 21 l

g f

4. INSTRtXTIONS I

4.1 Non-Appendix R Emergency Lights (Dual Lite)

NOTE Entire test may be performed before reporting deficiencies.

1.. " Location of Non-Appendix R ELUs". lists location 2.

of those units.

INSPECT emergency light display panel for any ~5ERVICE 4.1.1 ALERT ' lights.

4.1.2 VERIFY that charger stat"s light (LED) indicates one of ine follou ang:

Green flashing i

Constant red Constant green NOTE if charger status light indicates in accordance with step 41.2. then ELC is operating properly. If charger status light (LED) indicates as follows.

I then ELU is not operating properly:

Flashing red No indication 4.1.3 INDICATE ELUs not operating on Maint. Form 790 :-1 and REPORT to Maintenance Supervisor.

I 4.1.4 INITIATE corrective action for repair or replacement. as necessary.

i MP 790 :

Level of Use Rev.15 1

g 5 of 21 i

l

i i

I 4.2 Appendix R Emergency Lights (Manvdle/Holophane) i NOTE j. " Location of Appendix R ELUs." lists location of those units.

4 0.1 RECORD soltmeter number and calibration due date on AWO Y CAUTION Y Failure of an ELU to meet the requirements of this procedure may require generation of a PIR.'

8 NOTE Normal mode is when AC power is availaNe and ELU is in a 1

stancby mode.

j Emergency mode is when ELU is isolated from AC power an'd 2.

ELUs are illuminated on DC power.

3.

If it is necessary to replace the battery. charging card. or the entire unit an 8 - hour test dischstge must be performed as a retest.

4 2.2 With ELU in normal mode. OBSERVE the following-Green indicating light is lit.

Red indicating light is not lit.

Amber indicating light is not lit.

Illuminating lamps are not lit.

4.2.3 REPLACE defective indicating lights as necessary.

4.2.4 RECORD results on Maint. Form 790.2-1.

4.2.5 REMOVE cover.

l i

4.2.6 VERIFY bartery is less than 4 years old.

i MP 790.2 Level of Use Rev.15 l

General 6,, 3

)

I J 2.7 E battery is greater than J years old. NOTIFY Electrical stamtenance Supervisor and LNITIATE trouble report for repincement of battery.

I J2.3 Using voltmeter. MEASURE battery DC voltage and RECORD results n.Maint. Form 790.2-1.'

t J

.9 DISCONNECT ELU from AC power by either of the following-LNFLUG power to unit at twist-lock plug at i

DEPRESS and HOLD test button.

t J 2.10 OBSERtE the following:

i Green indicating light is not lit.

Amber indicating light remains nor lit.

Red indicating light is lit.

!!!uminating lamps are lit.

}

4 1

4 0.11 REPLACE defectise indicating lights as necessary.

42.1 RECORD results on Maint. Form 790.2-1.

I 4 2.13 Using voltmeter NIEASURE battery DC voltage and RECORD results Maint. Form 790.2-1.

lI 4 2.14 NIRIFY battery terminal connections are secure and clean i

l t

4.2.1$ E battery termmal show signs of corrosion. CLEA.N and I

LUBRICATE as follows:

i i

Using nonductive toothbrush. CLEAN corrosion from a.

battery terminals.

b.

APPLY conting of petroleum jelly around terminals.

Using voltmeter. VERIFY battery DC voltage is at least 3

c.

12.4 VD.

d.

1E battery D soltage is not at least 12.4 VDC. PROCEED as follows:

MP 790.2 Level of Use Rev.15 General 7 of 21 I

- 1

. 1 u

1) lb'ITIATE a Priority : Trouble Report for repair or i'

i replacement.

2) Refer To Section 4.3 to TROUBLESHOOT and REPAIR as necessary.

4.2.16 RESTORE AC power by either of the following:

PLUG IN twist-lock plug cr RELEASE rest button.

4.2.17 E battery terminal were cleaned and lubricated. PROCEED as follows:

Using vettmeter. VERIFY battery DC soltage is 13 68 \\ DC I

a.

to 13.92 VDC.

E battery DC soltage is not 13.68 VOC to 13.92 \\DC.

b.

PROCEED as toHows:

1) INITLATE a Priority : Trouble Report for repair or i

replacement.

2) Refer To Section J 3 to TROUBLESHOOT and REPAIR as necessary.

i J.2.18 REPLACE coser NOTE Amber light indicates a high charging rate and may be on or off depending on how much of the battery chstge was expended during the test.

I l

4.2.19 VER!FY the following:

Green indicating light is lit.

Red indicating light is not lit.

4.2.20 REPLACE defective indicating lights as necessary.

EXAMINE collected data on Maint. Form 790.2-1. for the J.2.21 following:

MP 790.2 Level of Use Rev. !!

l gg 8 of 21 l

i 1

llluminating lamp's status (lit /not lit) was correct for both normal (AC powered) and emergency (DC pouered) i moces.

Indicating light's status (lit /not lit) was correct for both i

normal (AC powered) and emergency (DC poweredt modes.

In normal mode, measured DC voltage was 13 63 VDC to 13.92 VDC.

In emergency mode, measured DC soltage was at least 12.4 \\DC.

4.22 E tither measured DC soltage in 5:ep '4 2.21 ass nor acceptsble. PROCEED as follows; I

Immediately REPORT failure (s) to 55,5CO.

a.

l b.

Immedistely REPORT discrepancies or failures to Electrical Msmtenance Supervisor.

l i

![ E ectr cei *Ls [

1) INITIATE PIR as necessary.

~ ~ '

INMATE a Priority 2 Trouble Repen for repair er c.

< [ e.ete,e.n i

l replacement.

l d.

Refer To Section 4.3 to TROUBLESHOOT and REPAIR as necessary.

i J.2.23.2 illuminatmg lamps are found inoperable QR any other conditions which require repair exists. PROCEED as fenews Immediately REPORT failure (s) to SS/SCO.

a.

b.

Immediately REPORT discrepancies or failures to Electrical Maintenance Supemsor.-

i l

1

1) INITIATE P1R as necessary.

l[seere.e.,rts f I

IbhTE a Priority 2 Trouble Report for repair er c.

l Eiectrician r

replacement.

Refer To Section 4.3 to TROUBLESHOOT and REP AIR 2l d.

necessary.

MP 790.2 Level of Use Rev.15

?

gg 9 of 21 l

I I

=.

?

l

)

3 i

NOTE ~

. V:

$linor repairs are limited to indicating light replacement'and battery-i 4

terminal cleaning and gressing.

I

.i

.j 4 2.24 Go To Step 4.2.2 and TEST next ELU until all required ELUs-hase been tested.

j 4 2.25 M testing is complete. PERFObi the fo!!cwmg-i a.

NOTFY SS/SCO.-

b.

SIGN and DATE Staint. Form 790.2-1.

Independent venfier REMW all data to ensure ac:eptsn:e -

f c.

criteria have been met and for completness of data.

ccecencent V e*+ er J

Independent verifier SIGN and DATE staint. Form d.

l 790.;-l.

't V CAUTION-Y

]

I If it is necessary to replace the battery, charging card, or the entire unit an 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> test discharge per Section 4.4 of this procedure must be performed as a retest, t

NOTE t

Section 4.3 is intended to be a tool to assist in identifying known

~

failure modes, if the problem can be identified by virtue of '

observation of existing conditions. Job Supervisor may immediately implement the appropriate. maintenance and retest.

4.3. Troubleshooting and Repair E normal mode measured DC voltage was acceptable 3,S 4.3.1 emergency mode measured DC soltage was not acceptacie.

l i E+ectnc:en

[

REPLACE battery.

ti MP 790.2 Level of Use Rev. 1.,

p"_ _'*_8g 10 of 21-h e

l 4

'~~

=

4 e

I 4.3.2 E normal mode measured DC voltage was unacceptativ high G no lights / lamps were found inoperstne. PROCEED as follows-i a.

DISCONNECT bartery leads.

t b.

MEASURE charging card output.

c.

E measured value of charging card output is greater than 13.92 VDC. REPLACE chargmg card.

I J33 E normal mode measured DC voltage was unacceptably low PROCEED as follows:

i l

a.

DISCONNECT battery leads.

l b.

MEASURE charging card output.

E measured value of charging card output is greater than l

c.

13.68 VDC. REPLACE battery.

t, d.

E measured value of charging card output is less than 13.68 VDC. REPl. ACE

  • charging card.

4.3.4 E necessary. REPLACE defective illuminating lamps.

4 3.5 E necessary. INSTALL new lugs as follous:

a.

SELECT appropriate lug.

i b.

SELECT appropriate hand crimping tool and die assemeh for were gauge and lug.

CHECK crimping tool with proper QA GOSO-CO plug c.

gage.

d.

CRB1P lug to wire.

Visually INSPECT lug for tight and secure fit.

e.

i 4.3.6 E replacement of unit. charging card. or battery is necessar).

refer to Section 4.4 and PERFORM discharge test.

4.3.7 E any other repairs were made. Go To Step 4.2.2. and PERFORM retest.

MP 790 2 Level of Use General

  1. '$f,'3

RECORD results in " RETEST ~ Section of hismt Form a.

790.2-1.

I 44 Dischary Test l

I

~

4.J 1 ENSURF ELU battery to be tested is fully charged.

442 RECORD the following data on Maint. Form 790. -: for each ELU tested:

PNS!S !D (ELU Number)

P ELU Serial Number JJ3 REMOVE cover.

4.4 4 Using soltmeter. \\1ERIFY batter 1 DC soltage is benieen 13.68 NDC and 13 9: VDC and RECORD soltage on Maint.

Form 790.2-2.

4 4.5 E DC soltage is not between 13.68 NVC to 13 90 VDC.

PROCEED as follows:

a.

TER.NilNATE test.

b.

NOTIFY supervision.

4.4.6 DISCONNECT ELU from AC power and RECORD date and t

time on Maint. Form 790.2-2.

4 l

4 4.7 Using voltmeter. VERJFY battery DC voltage is at least 12.4 NDC and RECORD soltage on Maint. Form 790.:-.

J.4.8 E DC voltage is no: 2:12.4 volts. PROCEED as follows:

a. TERMINATE test.

i b.

NOTIFY supervision.

4 4.9 WAIT 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> and RECORD end date and time on Maint.

i Form 790.2-2.

I 4.4 to Using soltmeter. VERIFY final bartery DC voltage is 210 f VDC and RECORD toltage on Maint. Form 20.2-2.

i I

4 4.11 VERIFY the following:

l w 790.2 Level of Use t

Generat 8'if l, 2

4.t.11 VERIFY the following:

-4 Oreen light is not lit.

Amber light is not lit.

J' Red light is lit.

liluminating lamps are not lit.

J J.1 REPLACE defective indicating lights as necessary 4 4.13 RECORD on Maint. Form 790.0-2.

f 4 4.14 RECONNECT ELU to AC power.

J.J 15 VERIFY the fo!!owing:

~

Creen light is lit Arnber light is lit.

i Red light is nor lit.

a llluminat.ng lamps are not lit.

I J 4.16 REPLACE defectise indicating lights as necessary.

J J.17 LNSTALL coser.

l 4.4.18 Immediately REPORT discrepancies or failures to Elecm:al Maintenance Supenisor.

l 4.4.19 After a minimum of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. VERIFY the fellowing:

l I

Amber light is OFF.

Green light is ON.

With AC power remosed. red indicating light is ON and illuminatmg lights are ON.

4.4.20 REPLACE defective indicating lights as necessary.

W 7902

^

g,ygg ng gg, Rev.15-g,g 13 of 21

I 4.J.21 E all acceptance criteria are met. RECORD test results " SAT-on Maint. Form 790.2-2.

4.4 22 REPORT discrepancies or failures to Electrical Maintenance l

Supervisor.

I 4,4 23 Electrician SIGN and DATE Maint. Form 790.2-1.

7 4424 Independent verifier SIGN and DATE Maint. Form 790 :-)

v r.,c.ee.ni snc.

-.c i

1 i

l I

I 1

he 790.2 Level of Use Rev.15 g,,

14 of 21

~.

+

5. REVIEW AND S1CNOFF 5.1 The review (s) and sign off(s) for this procedure is/are located in Maint. Form (s) 790.2-1 and/or 790.2-2.

j-1

6. REFERENCES

. ortheast Nuclear Energy Company Accident Prevention Manual N

6.1 I

6.2 10CFR30 Appendix R r

6.3 ACP-6.09. -Chemical Hazardous Waste & Toxic Substances i

Control-l ACP-OA-9.04. -Control and Catbration of Measuring and Test l

6.4 Equipment-6.5 NUSCo letter GTS 78-L-275 dated October 17, 1978 6.6 Drawmg 25202-35011. Control Room Ceiling Detail Lighting 6.7 Holophane. -M-1912 Volt DC Power Pack for Automatic Emergency.

Lightmg. Installauen and Maintenance instructions" 6.8 Dual Lite. Spectron Series. AS-BC3X Series I. Self-Contamed 1

Emergency Lighting Units 6.9 AMP instruction Sheet 15 6976 6.10 AMP Instruction Sheet 15 9278 7.

St1mtARY OF CHANCFS

?

The content of this procedure was modified to incorporate new format 7.1 criteria specified m Resision 0 of the Millstone Procedure Writer s Guide.

i t

i j

~

MP 790 2 Level of Use Rev.is.

Gsnerai 15 of 21.

?

I q

l 1

4

Allachement I l OCATION OF NON-AI'l'ENIIIX R El.Us Isi.een s.I NUMBER OF UNITS BtDG E1EV.

LOCATK)N OF LLU Mainsenance SIwip - Stairway above Tadcreb 1

"IB 14*6" I

TB 14'6" Machine Slwy I

TB 14'6" Near "A" Reactor Feed l' ump 2

TB 14*6" Compower Room 6

RB 198*

Refuel Fkxw 6

Til 54'6" Tambine I kxw I

1 11 M'6" Telephone Room Oussale 2

GT I4'6" Gas Tuehine Duekkng 1

t Fl*

14'6" Fwe hwnp ikane Twbine I ube Oel Room. MCC I-2

[

I lu 14'6" i

1B 14*6" -

Near Elevator In Stawwell Hear Condensase l' umps.-

i TB M*6" I

RB 82'9" Top of Seairwell i

Til 54'6" Top of North Stairwell TB - Twbene Buekhng RB - Reacter Ruikhng -

5:P - Fwe IW llouse GT - Gas Tiubine lkukieng 1

- Mi' 7w 2 New li Level of Use' In ad 21

-n-

... ~.

......m...~

______..,___.__m_

.m m

Allachment 2 LOCATION OF AITENDIX R ELUs isheci i.4 si INSPECTION SEQUENCE LOCAL l.D.

DLDG ELEV.

LDCATION 01: ELU 1

1-ELU-SPARE-1 TB 14'6" Maintenance Shop - Outside Sand Blassmg Roorn 2

1-ELU-SPARE-2 TB 14*6" Maintenance Shop - Outside Sand Blasting Room 3

1-ELU-SPARE-3 TD 14*6" Maintenance Shop - Outside Sand Blasting Room 4

l-ELU-SPARE-4 TB 14'6" Maintenance Shop - Outside Sand tilasting Room 5

1-ELU-Cl2 TB

%'6" Control Room - East Door 6

l-ELU-l RW M'6

Stairs lichind Control Rawn 7

l-ELU-2 RW 26*6" Stairs to Control Hmxn 3

1-ELU-3 RW 14'6" Saairs. Entrance so Radwaste 9

l-ELU-4 TB 14'6" llallway, Eass-Computer Rawn Wall to I-ELU-5 1U 14'6" Itallway Near 11 P. Olhce il 1 -ELU-72 Til M'6" Admin Area Stairway 12 1-ELU-73 1U 14*6" Admin Area Stairmay 13 I-ELU-78 RB 14 6" MCC LX'-ilAl Environmental Enclosure 14.

3-liLU-67 111 M'6" llallway West of Control Rmwn 15 1-ELU-77 lu 34'6" Rear Stairs-Actess Door 16 l-ELU-Cl TB

%*6" Consrol Room, Ref Dag 25202-35011 for Location 17 l-ELU-C2 TB M'6" Control Room, Rei Dwg 25202-35011 for Imation 18 l-ELU-C3 TB

%'6" Control Room, Ret Dwg 25202-35011 for location 19 l-ELU-C1 1 11

%'6" Control Room, Rei Dwg 25202-3i011 for 1mation 20 I-LIU-C5 Ill M'6' Contsol Rmwn, Ref Dwg 25202-35018 for Incation 21 1-01.ti 06 Ill

%'6'

.Contful RO'wn, Rei Dag 25202-35011 for Incation -

22_

l-lit 11-07 lit h*6" ironarol R m Rei Dwg 25202-3soll for lucanon hlP 790 2 ge,.

13 Level of Use n y of 2 General

)

Allachment 2 LOCATION OF APPENDIX R ELUs (ss.m 2 a si J

INSPECHON SEQUENCE LOCAL l.D.

IMDG L1 EV.

LOCATION OF El_U 23 1-ELU-C8 TB 36'6" Control Room. Rei Dwg 25202-75011 for Location 24 I-ELU-C9 TB 36'6" Control Room Ref Dwg 25202-35018 for location 25 1-ELU-CIO 1B 36*6" Control Room, Rei Dwg 25202-35011 for Excation 26 1-ELU-Cl3 TB 36'6" Control Room, Ref Dwg 25202-35011 for location 27 1-ELU-Cl3 TB 36'6" Control Room - Southwest Door 2il 1-ELU-48 TB 36'6" Double Doors. Control Room Ramp 29 l-ELU-49 lu 34*6" llallway. Makeup Demin Panel 30 1 -ELU-50 TB 34%"

llallway Makeup Demin Panel 31 1-ELU-51 TI) 34'6" I:ecdwater Reg. Valve Station Stairs 32 1 -El.U-52 IB 34*6" Feedwater Reg. Valve Station North Wall 33 I-El.U-53 lu 34'6" l ecdwater Reg. Valve Station West Wall 34 I-ELU-63 TB 34'6" Swiithgear Area Opposite 14B Dus 35 l-ELU-76 TB 14 6" Rear Stairs-Vacuum I' riming Pps.

36 1-ELU-75 TB 14'6" TBCCW IIcan Exchangers 37 1-ELU-74 TB 14'6" Admin Area llallway -

38 l-EIE-6 TB 14*6" RB Entrance 39 l-ELU-7 RB 14'6" RB Enuance-Above Door 40 1-ELU-8 RB 14*6" Stairs, North Wall di l-ELU-9 RB 14'6" CRD Rads. North Side 42 l-El.U-10 RB 14'6" Containment Wall-Northeast Side 43 1 l:1(1-11 Rin 14 't."

llallway Near MCC IUI All-2 1

MP 790 2 g,,

,5 Level of Use is og 2 General

Allachment 2 LOCATION OF APPENDIX R ELUs tsi.u 3..a si INSPECT 1 SEQU' -CE LOCAL l D.

BLDG ElEV.

LOCATION OF El.U 44 3-ELIJ-12 RB I 4*6" Elcsator 45 1-ELU-13 RB 14'6" Col, Near Elevator 46 1-ELU-14 RB 14'6" Stairs. South Wall 47 1-ELU-15 RD 14'6" llallway. South Wall 48 I-ELU-16 RB 14'6" MCC F.l. Sowh Wall 49 l-ELU-17 RB l i'6" Wall, South Side, CRD PC. Vivs 50 1-ELU-18 RB 14'6" Wall, South Side. CRD Fiher Si l-ELU-55 RB 14*6" Consainmens Wall-South Door 52 1-ELU-56 RB

- 8' 2" Southwest Corner Room Stairs 53 1-ELU-70 RB

-8'2" Southwest Corner Room, West Wall 54 1-ELU-57 RB

-26'0' Southwest Corner Room Stairs 55 l-ELU-58 RB

-26'0" Soushwest Corner Room on South Wall 56 1-ELU-59 RB 14'6" Shuidown Cooling 5%mp Room 57 l-El.U-68 RB I 4'6" Shwdown Cooling I%mp Room Noeth Wall 58 1-ELU-69 RB 14*6" Shutdown Cooling f%mp Room North Wall 59 l-El.U-19 RB

-8'2" Stairs, Southeast Corner Room 60 I-ELU-20 RB

-8'2" Stairs, Hear "B" CRD 1%mp 61 1-ELU-21 RB

-8'2" Col. IIceween CRD f%mps 62 1-lit.U-22 Ril 14*6" Stairs. Southeast Corner Room 63 1 -lil.ll-23 Ril 42'6" Staiss, Southeass rewner Rtxwn 64 l_lil li-2 8 Ril 42 *h" Llevator, W.all O,

HilCCW lla-Laith I.rul d

tii i ii17-25 Ril 4 2'en" Mi' 790 2 g,,.

,5 Level of Use 39 og yg Gmal

Allachenent 2 LOCATION OF APPENDIX R ELUs Ishm 4 or s

?

I g

SEQUENCE IDCAL. l.D.

BLDG ELEV.

I.DCATION OF El.U 3

66 1-ELU-26 RB 4T6" Col. RDCCW lin-South End 67 l-ELU-27 RB 42*6" MCC 101 AB-1 Enclosure. South s

68 1-ELU-60 RB 42*6" Entrance to Clean-Up Pump Area 69 1-ELU-61 RB 42'6" Clean-Up lbmps. Soush Wall 70 I-ELU-62 RB 42*6" Fuel Pool lleat Exchangers Area 7'l 1-ELU-29 RB 4T6" l-IC-3 72 1-ELU-30 RB 4T6" Back of MCC E-2 f

73 1-ELU-31 RB 42'6" Col. Near "A" RBCCW Pump 74 1-ELU-32 RB 4T6" Instrumens Rack 2206 Encloswe-Nonh Sede 75 1-ELU-33 RB 4T6" instrument Mack 2206 Encloswe-West Side 76 l-ELU-28 RB

' 42'6" Instrument Rack 2205 Enclosure-North Side 77 l-ELU-34 RB 42*6" Wall. Near Northwest Stairs 78 l-ELU-35 RD 42*6" Stairs. Noethwen Corner 79 l-ELU-36 RB 65'9" Stairs. Southeast Corner 80 ELU-31 RB 8T9" Stairs. Southease Corner 81 1-ELU-38 RB 8T6" Elevasor i

82 I-ELU-M RB 8T9" Col. Wess Side of ISO Condenser 83 1-ELU-40 RB 82*9" Wall. l'ast Side Containment 84 1-ELU-54 RB 8T9*

East Wall. Near ISO Condenser 85 1-El.U-43 GT 14*6" Wall fly North Door 86 l-11.11-44 GT I4'h" West Wall '

87 1-1I11-64 YARD l i'6" 1481 Switchecar, inactior 1ights 8M i i i11-65 YARD I l'h' I4il Swinhgear. Interior I.sghts MI' 790 2 p,,, i 3 -

Level of Use 2n et n WaI

l.OCATION OF APPENDIX R El. tis tsheci 5ed 5:

INSPECHON SEQUENCE LDCAL t.D.

BLDG EIEV.

LOCADON Of: EI.U

~

89 1-ELU-46 YARD 14'6" 14tl Swischgear. Exacriar Ughes Cosmiensase Transfer I%mp flouse Seases 90 I-ELU-43 CS 10*11*

91 I-ELU-42 CS 10'11" Condensate Transfer I%smp llouse Wall 92 I-ELU-45 TB 14*6" Aux Ikuler Roosn Eass WaN 93 1-ELU-46 TB 14*6" Diesel Generaser Room Soush Wall 94 1-ELU-47 TB 14'6' Diesel Generator Room West Wall RB - Reactor %

TB - Tierbene Busidung

" GT - Gas Tustone W CS - Condensene emap teouse RW - Radwesse W f

y,,

33 L M d Use 2 6: 3

hat.

. ~.

Docket No. 50-245 H14632 4

Attachment I (Redacted Version)

Millstone Nuclear Power Station, Unit No. 1 October 1993 4

k-

4

2

caseco-8 6

JL8a(JA.Mut..m38" d" ""

$//$nh%l>

~D:

Edswn $%iNd

"" p PL

-.~CW4ALta 4x2d w

asua e cyxn

~

as

J_

. ay;$ h

. v:~ren ow > _

L & cl

, W. 04 Q M4 d @ M S ueM %

E" 4 1e~ O m fil& J y% m. K n sat ~g

+ Jw.

f 2, J anA<> n.L Ad id I on aM,186 Ad cdLj - # v-A n - s Gu ac em.%,D a cleAa *

% q~ fD&Lud ejka 4 c

y db YrtWh f% au,

3 a e 4 r% $ u &,u s A

ec

,1de+m:

Pn MA.

7

-. m a%9e oa ;o

..&d n a Aa; eM9s

.c # d f,4c /. j d M

anamra at.e8 %

es;93. } Q k)) Q gjgg Q A A b, b'l u w

. n. <-

e w A M i~.$ L Aa<. M.i A

a.p m*

A A.

A

.l

.a.

a ohL %..%a A..a Q& pie 6 &

o A &

ayaf iw a

~

.J4 r-b $,A A i,

~'~~

( PGEm O-rE

- "7&T eMA

.._. _... _ __.._.._... _ _._......_ C. _

4 Docket No. SQ-14ji B14632 Attachment J (Redacted Version)

Millstone Nuclear Power Station, Unit No. 1

-9 J

October 1993.

l l

\\

l

~

i s,, L.'

d_

' NoitTHEAST UTILITIES 3

fyh~.C' N

1 L

a C" :C"::'l".".".

September 14,1993

- CONFIDENTIAL -

1 V

l TO:

Anthony Ross

/

FROM:

Neil G. Bergh

.l Unit One Maintedance Manager Millstone

SUBJECT:

Your memo ' Harassment and Intimidation', dated 8/6/93 Regarding your interoffice memo of 8/6/93, you will recall we met with Virginia Fleming, Jeffrey i

Stevenson, Steve Abisso and myself on 8/7/93. Our first order of business during that meeting was to discuss the course of action that would be taken to address your concern that the actions taken by Mr. Stevenson during the three weeks time frame preceding 8/6/93 were the result of

)

Mr. Stevensan's intention to intimidate and harass you.

We agreed that an independent i

assessment by a Nuclear Safety Concems Peer Representative would be initiated in the interest of assessing your concern. Donald Cleary, a Nuclear Safety Concerns Peer Representative, was immediately tasked with reviewing the issues and events outlined in your memo of 8/6/93. Upon completion of thr review, Mr. Cleary met with you on 8/19/93 to discuss the results of that J

review. The results of Mr. Cleary's review, as I understand it through my own discussions with Mr. Cleary, are as follows:

1. Regarding the events of 8/16/93 and 8/27/93 when you asked Mr. Stevenson to pursue the adequacy of caulking (seals), Mr. Cleary's review indicates Mr. Stevenson pursued resolution of this issue with engineering. Mr. Cleary concluded that better communications between a!!
  • parties involved could have resolved the issue at a much earlier stage.

l

2. Regarding the event of 8/4/93 when you were asked if you needed a work order (AWO) to grease a bearing on the Vital A.C. Motor Generator Set, Mr. Cleary's review provided concurrence that an AWO is required for that type of work activity. Any suggestion by Mr.

Stevenson or others to the contrary was,in my view, inappropriate. However, this was not a direction to perform unauthorized work or an attempt to harass or intimidate you.

Additionally Mr. Cleary conciuded that the request from David Spence, for you to -rocess the AWO through operations for approval, was not with the intent to single out or punish

)

2"'

r

4 i

4 you, but rather to provide Mr. Spence the opportunity to attend the daily 2:30 planning meeting on time. I am aware that the practice of electricians and mechanics processing AWO's through Operations, though not routine, has occurred from time to time in the past as a means to accomplish work.

3. Reguding the events of 8/3/93 through 8/5/93 where you noted the procedure was missing in the AWO to install / remove the ground cart for the 'C' Condensate Booster Pump Motor, Mr. Cleary's review concluded that the actions of everyone involved were well within procedural requirements. Mr. Cleary continued on to suggest that perhaps communications were lacking which led to the misunderstanding between you and Mr. Stevenson.

Having been provided the results of Mr. Cleary's review,in conjunction with my own assessment of Mr. Stevenson's performance both within and beyond the three events outlined in your memo of 8/6/93, it is my belief there has been no intimidating or harassing conduct by Mr. Stevenson toward you. However, Mr. Cleary's review has provided additional insight from which I have taken the following actions:

1. Unit One Engineering has been requested to re visit the evaluation surrounding the EEQ caulking (seals) application to further reassure complete closure of this issue. Additionally, at my request, the Quality Assurance Department (QSD) has conducted an independent review of the activities involved with the application of EEQ caulking. QSD has providecT me preliminary findings which conclude no issues of non compliance exist. I am awaiting issuance of the final surveillance report.
2. As I stated above, an AWO was necessary to grease the motor generator set bearing. In my view, ahhough he did not do anything inappropriate, Mr. Stevenson should have understood the requirement. Consequently, each of the supervisors in the Maintenance Department has been approached by me regarding our obligation to ensure that all work be conducted wi:h an AWO in accordance with ACP-QA 202C.

In closing,I wish to reinforce my longstanding request that we continue to explore and seek to resolve the issues surrounding our need to communicate more effectively. Once again, through Mr. Cleary's assessment, as we have experienced through input from other parties such as our personnel department or Steve Abisso, the common thread of poor communication surfaces as a contributor to the differences we seek to resolve. I trust that with continued dialogue and good faith we can retum to a partnership focused around teamwork and mutual respect. In that way we can complete our work in a safe and effective manner 1

l

Docket No. 50-245 B14632 T

Attachment X (Redacted Version)

Millstone Nuclear Power Station, Unit No.1 1

October 1993 1

a l

1 l

A i

mia.www,..vm m m.

tm 1 xm om,,

fL/d&d

"'02/. fW Mala rL 2n"

~47JJi MLAust

~

"k/ /27 qs "DWA a OWo ad As LE

  • h -+ 3-moi g/a3/e a g,g,,et A msma %

Sh awo A p g.33, yW' a Az w w V Ma. W ~

- s.. a im

' A %ph 6-rsas au L

W 9,C M -

j s/x

.Wln u @d L

a aL% L p. c~

Wa e + L, W e. A J A Y.V eks O F.L A h -t b % g s. n% 4 %x n e p/93ja J-r>)& a

'07 4

kny A. s e

e b % w%

  • J 4 e t.b, p M & '

. to - J p.44a-fL w

-o

  • a J.Me/~b.A'afu V W

't pd6 c

&M O

o.

aad 1

Aku No 7

3 % m oY 2

fl 2od.

. u c.. d e d e m c A u

"$ & % e n=,v %a-z s&+

k

- W-- M.T_

a so

.f

& ^ '^

cac=* =.ev=nes.e unw=

Os^r?'- $ N!!^ W f $ M" wQ,M del 4.

OW L.fr gag gg y

By 9/s/n &&.c)..Q u

w p>M L.o.h. A. W b

  • b" a

AJew y. Q aa n.b w~'A "NWp p

hMO 1W

-MW4W WgT1WW WWWWgg Jg g g

d

~

4-Eqd et No. 50-245 B14632 Attachment L (Redacted Version)

Millstone Nuclear Power Station, Unit No. 1 1

October 1993 l

g.

'

  • luMFI'Hi!A!iT trt1tJTItiti g

q a

<Ta t

gM

)

September 14,1993

- CONFIDENTIAL -

TO:

Anthony Ross FROM:

Neil G. Bergh I

Unit One Maintenance Manager - Millstone

SUBJECT:

Your memo to me titled ' Work conducted with no AWO and fuse changes','

~

dated 8/27/93 During the past several weeks I have met with you several times to report to you the progress being made with the inquiry following your memo of 8/27/93. Let me take this opportunity to-summarize the status of the review as it stands at this time. The facts as I have been able to ascertain are as follows:

Work was conducted on the fuse panel during the evening of 8/25/93 by Myrock electricians r

An AWO was authorized for the work activity.

Myrock electricians were cognizant of the blue tag. No manipulation of switching under the blue tag occurred. Myrock electricians performed their activity with the circuit energized.

Myrock supervision have acknowledged the housekeeping consideration surrounding the extra fuses left over in the panel. Provisions have been exercised to preclude recurrence of this in the future.

I have concluded that appropriate controls for this activity were instituted through the AWO process. Additionally, there appears to be some confusion regarding the appropriate fuse size needed for this application. I have requested engineering to pursue identifying the proper fuse size.

I trust this reply satisfies your concerns surrounding the events outlined in your memo of 8/27/93 Should any additional questions remain, involving this or any other issue, please feel free to bnng it to my attention, esm ev m Wet

.