Notice of Denial of Amend to License NPF-43,eliminating Selected Response Time Testing Requirements
ML20059B274
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 10/19/1993
From: Bill Dean
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20059B212 List:
References
NUDOCS 9310280114
Download: ML20059B274 (2)


Text

_

M L

e 7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION DETROIT EDISON COMPANY DOCKET N0. 50-341 FERMI-2 NOTICE OF DENIAL OF AMENDMENT TO FACILITY OPERATING LICENSE AND OPPORTUNITY FOR HEARING The U.S. Nuclear Regulatory Comission (the Comission) has denied a request by Detroit Edison Company, (licensee) for an amendment to Facility Operating License No. NPF-43 issued to the licensee for operation of the Fermi-2 facility, located in Frenchtown Township, Monroe County, Michigan.

The purpose of the licensee's amendment request was to revise the Technical Specifications (TS) to eliminate selected response time testing requirements at Fermi-2.

The NRC staff has concluded that the licensee's request cannot be i granted. The licensee was notified of the Comission's denial of the proposed change by a letter dated October , 1993. An additional request to add a response time testing requirement for main steam line flow-high for the main l

steam isolation valves will be handled by separate correspondence.  ;

i By November 26, 1993, the licensee may demand a hearing with respect to l

the denial described above. Any person whose interest may be affected by this proceeding may file a written petition for leave to intervene. ,

1 A request for hearing or petition for leave to intervene must be filed l l

with the Secretary of the Comission, U.S. Nuclear Regulatory Comission, Washington, DC 20555, Attention: Docketing and Services Branch, or may be delivered to the Comission's Public Document Room, the Gelman Building, 2120 L Street, NW., Washington, DC 20555 by the above date.

$k0 $0cck b P

~_

p q i A copy of any petitions should also be sent to the Office of the General Counsel, U.S. Nuclear Regulatory Comission, Washington, DC 20555, and to John Flynn, Esq., Detroit Edison Company, 2000 Second Avenue, Detroit, Michigan 48226, attorney for the licensee.

For further details with respect to this action, see (1) the application for amendment dated March 27,1992, and (2) the Comission's letter to the licensee dated October 19,1993.

These documents are available for public inspection at the Comission's Public Document Room, the Gelman Building, 2120 L Street, NW., Washington, DC 20555, and at the Monroe County Library System, 3700 South Custer Road, Monroe, Michigan 48161. A copy of item (2) may be obtained upon request l l

addressed to the U.S. Nuclear Regulatory Comission, Washington, DC 20555, ,

Attention: Document Control Desk.

Dated at Rockville, Maryland, this 19th day of October,1993.

FOR THE NUCLEAR REGULATORY COMMISSION

&(

j , . ,

killiamM. Dean,ActigDike- or Project Directorate 111-1 Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation

-