Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19345B693 + (ML19345B693)
- ML19345B694 + (ML19345B694)
- ML19345B695 + (ML19345B695)
- ML19345B696 + (ML19345B696)
- ML19345B698 + (ML19345B698)
- IR 05000259/1980034 + (ML19345B699)
- ML19345B700 + (ML19345B700)
- ML19345B701 + (ML19345B701)
- ML19345B702 + (ML19345B702)
- ML19345B703 + (ML19345B703)
- ML19345B704 + (ML19345B704)
- ML19345B705 + (ML19345B705)
- ML19345B706 + (ML19345B706)
- ML19345B707 + (ML19345B707)
- ML19345B709 + (ML19345B709)
- ML19345B710 + (ML19345B710)
- ML19345B712 + (ML19345B712)
- ML19345B713 + (ML19345B713)
- ML19345B714 + (ML19345B714)
- ML19345B716 + (ML19345B716)
- ML19345B717 + (ML19345B717)
- ML19345B718 + (ML19345B718)
- ML19345B719 + (ML19345B719)
- ML19345B721 + (ML19345B721)
- 05000339/LER-1980-093, Forwards LER 80-093/03L-0 + (ML19345B722)
- ML19345B723 + (ML19345B723)
- ML19345B725 + (ML19345B725)
- 05000339/LER-1980-093-03, /03L-0:on 801101,diesel 2H Room Fire Door Had Been non-functional More than Seven Days.Caused by Using Door While Room Was Under Vacuum from Operation Diesel.Door Replaced + (ML19345B726)
- ML19345B727 + (ML19345B727)
- ML19345B728 + (ML19345B728)
- ML19345B729 + (ML19345B729)
- ML19345B730 + (ML19345B730)
- ML19345B731 + (ML19345B731)
- 05000271/LER-1980-038, Forwards LER 80-038/03L-0 + (ML19345B732)
- ML19345B733 + (ML19345B733)
- ML19345B734 + (ML19345B734)
- ML19345B735 + (ML19345B735)
- 05000271/LER-1980-038-03, /03L-0:on 801027,during Refueling Operations LIS- 2-3-72A Isolated from Svc During Installation of Analog Trip Sys.Cause Not Stated.New Analog Instrument Installed + (ML19345B736)
- ML19345B737 + (ML19345B737)
- 05000296/LER-1980-047, Forwards LER 80-047/03L-0 + (ML19345B738)
- ML19345B739 + (ML19345B739)
- ML19345B740 + (ML19345B740)
- ML19345B741 + (ML19345B741)
- 05000296/LER-1980-047-03, /03L-0:on 801108,during Normal Operation, Difficulties Encountered While Trying to Determine EECW Flow to 3B & D Core Spray Room Cooler.Caused by Biofouling,Silt Accumulation & Corrosion + (ML19345B743)
- AECM-80-295, Forwards Clarified Responses to Environ Rept Questions 350.9-350.12 Re Socioeconomic Impact & Initial Response to Questions 451.1,Parts 1 & 2 Re Air Quality.Encl Responses Will Appear as Amend 5 to Final Environ Rept + (ML19345B744)
- ML19345B745 + (ML19345B745)
- 05000409/LER-1980-011, Forwards LER 80-011/01T-0 + (ML19345B746)
- ML19345B748 + (ML19345B748)
- 05000409/LER-1980-011-01, /01T-0:on 801110,cooldown Rate Exceeded Tech Spec Limit of 150 F Per/H at Five Points on Reactor Vessel.Caused by Temp Differential Between Coolant & Upper Portion of Vessel.Water Level Lowered to Slow Cooldown Rate + (ML19345B749)
- ML19345B751 + (ML19345B751)
- ML19345B752 + (ML19345B752)