TOLEDO EDISON Docket No. 50-346 Acaa p C,euse egem License No. NPF-3 wauss sm Serial No. 667 November 25, 1980 3
.)
Director of Nuclear Reactor Regulatioit Attention:
Mr. Robert W. Reid, Chief Operating Reactors Branch No. 4 Division of Licensing United States Nuclear Regulatory Commission Washington, D. C.
20555
Dear Mr. Reid:
This responds to your letter of September 24, 1980 (Log No. 610) dealing with the development and installation of an instrumentation system to detect inadequate core cooling at the Davis-Besse Nuclear Power Station, Unic 1.
Toledo Edison provided its discussion in our September 8,1980 letter (Serial No. 648) identifying that currently acceptable instrumentation is installed to provide adequate operator information. Further discussion of this issue will be made in response to Section II.F.2 of NUREG 0737, "Clar d 'ication of TMI Action Plan Requirements," scheduled for submittal January 1, 1981.
Very truly yours, 7-RPC:TJM: sic cc: Luis Reyes - DB-1 NRC Resident Inspector THE TOLEDO ECISCN COMP /'.(