e
^
NOV 171980 e
h-D n
o e,
Occket Mos. 50 ':29/030 M
_9 2
Ei APPLICN4T:
Consumers Power Ccopany (CPCo) y; N
l U5L FACILITY:
"idland Plant, Units 1 5 2
SUBJECT:
SUMMARY
CF OCTOBE'l 29, 1980 PEETING ON CPERATOR TRAINING
=
~ T:
5 AND QUALIFICATION 3
4 Representatives of the Nuclear Regulatory Cormission 'NRC) staff and CPCo met in Bethesda, Maryland en October 29, 1980 to disci.
CPCo's operator training and qualification for Midland Plant, Units 1 2.
A list of attendees is provided as Attachment 1.
The meeting was requested by CPCo to discuss with the NRC staff their program
'.hich was perforced in response to Mr. Denton's letter of March 29, 1930 as clarified 5y Mr. Eisenhut's letter dated September 5,1980. CPCo presented viewgraohs on various par +,s of their operatcr training and qualificaticn program. A copy of these viewgrapns is provided as Attachcent 2.
C?Co noted that the program P.as minor variaticns from the.Narch 28,19C0 letter.
The staff indicated that most of these variations were already accepted for siailar reviews en Other plants.
CPCa requested and the NP.C staff verbally approved four variations from the existing CPCc training program. These are:
1.
The Palisades plant is acceptable for observation training as cpposed to the Davis Besse plant.
2.
A three week course instead of an eight week course at the Ba',! simulator is acceptable for previously licensed personnel.
3.
Applicants for cold license examinations do not have to meet the three-month on shift requirement as stated in the March 28, 1980 letter.
4.
Applicants for cold license SRO examinations will not be required to hold an R0 license for one year as stated in the March 29, 1980 letter.
CPCo representatives requested that the NRC. staff ad=fnister approximately 70 cold license examinaticns for both units in early-1983. The staff stated that the current practice is to license the individuals on the first unit ready for fuel loading then to re-license those individuals when the second unit is ready for fuel loading. However, since CPCo has contracted for simulators for both units and if the time interval between fuei loadings is not excessive (i.e., not c: ore than approximately six months), the staff is capable of y
sRN_Epe+
e f*
85
+
O rE >...
NEC FORM 318 (9 76) NRCM C240 '
NU.S. GOVERNMENT PRINTING OFFICE: 1979 289 369
d administering simultaneous examinations for both units..The certification of CPCo instructors was also discussed. The staff stated that they may be certified in accordance tiith future INP0 criteria or may be examined as Senice Operators by the NPC prior to the cold examinations. CPCo will consider these alternatives in the future.
At the conclusion of the meeting, CPCo ccmitted to revise Section 13.2 of the TSAR and to resubmit it for NRC staff review in the near future.
/_.
~
g r
K. N. Jabbour, Project Manager Licensing Branch No. 3 Division of Licensing B. ' wilson, Section Leader Operator Licensing Pranen l
Divisicn of Fuman Factors Safety Attachments:
As stated cc: See next ;: age 1
1
. LB3:DL'Q. &
./
g.
%'1(a..
.0L OFrice N. n
..S.
. q.
E 3
SURNAME.$
. Son Ch-KJabbour..
FM o,re ),,11/)0/80 11/jp/80,'
11/[{/80 11//JF30 i
DU.S. C.OVERNMENT PRINTING CFFICE: 1979 289 369
'NRCFORM 318 (9.76) NRCM 0240
e -
q O
3 MCETIt!C SUMMi:V Dis 1R!t;Ufl0*!
Docket. File G. Lear NRC PDR V..*:conan Local POR S. Pawlicki TIC /NSIC/ Tora V. Benaroya NRR Reading Z. Ros2toczy LB# 3 Reading W. Haass
- 11. Denton D. Muller E. Case R. Ballard D. Eisenhut W. Regan R. Purple D. Ross B. J. Ycungblood P. Check A. Schwencer R. Satterfield F. Miraglia
- 0. Parr J. Miller F. Rosa G. Lainas W. Butler R. Vollmer W. Kroger J. P. Knight R. Houston R. Bosnak
- 1. Murphy F. Schauer L. Rubenstein R. E. Jackson T. Speis Project Manager XJabbour/BWilson U. Johnston Attorney, OELD J. Stol J. Lee S. Hanauer 01E (3)
W. Commili ACRS (15)
R. Tedesco f. Schroeder D. Skovholt M. Ernst.
NRC Particioants:
R. Baer C. Berlinger V. DeLiso K. Kniel S. Salah G. Knighton P. Collins A. Thadani B. Wilson D. Tonsli K. Jabbour J. Kramer
- 0. Vassallo P. Collins D. Ziemann bec: Applicant & Scr/ ice List J
O s'
i.
A g-i.
t-i<
e t
t-i Mr. J. W. Cook Vice President Consumers ' Power Company 1945 West Parnall Road j-Jackson, Michigan 49201 L
cc: Michael I. Miller, Esq.
Mr. Don van Farowe. Chief Ronald G. Zamarin, Esq.
Division of Radiological Health Alan S. Farnell, Esq.
Department of Publ sc Health Isham, Lincoln 3 Beale P.O. Box 33035 Suite 4200 Lansing, Michigan 48909 I
l First National Pldza Chicago, Illinois 60603
- William J. Scanlon. Esq.
James E. Brunner, Esq.
- 2034 Pauline Boules 3rd Consumers Power Com0any Ann Arbor, Michigat 48103 212 West Michigan Avenue Jackson, Michigan J9201
. U. S. Nuclear Regu atory Ccmmission Resident !nspector-Office t
l Myron M. Cherry, Esq.'
Route 7 1 IBM Plaza Midland, Michigan 48640 Chicago, Illinois 60611 Ms. Mary Sinclair Ms. Barbara Stamin s 5711 Summerset Drive 5795 N. River Midl and, _ Michigan a8640 Freeland, Michigan 48623 1-Frank J. Kelley, Esq.
- Ms. Sharon K. Warrin
- Attorney General State of Michigan Environmental
- 636 Hillcrest Midland, Michigan 48640 Protection Division 720 Law Building j
Lansing, Michigan 48913 i
Mr. Wendell Marshall Route 10 Midland, Michigan 48640 Mr. Steve Gadler 2120 Carter Avenue St. Paul, Minnesota 55108 i
t l
l T
mr y _
.-,.,-%v, e.
-p, c.. _, -,,-,-
+._r.m w
e...,_4 4
,em r
Meeting with CPCo on Midland October 29, 1980 Attendees List CPCo NRC D. Budzik K. Jabbour J. Flynn V. DeLiso A. Young S. Salah G. S! r.de B. Wilson S. Hubbard P. Collins
i isolfri:i> ut.
jo/29/ho 1.
CVERVII'd CF THE COLD LICEISE TRAINII;G FROGRR1 G S Slade 2.
SCREENING AliD CRITERIA FOR SHIFT SUPERVISORS, J P Flynn CONTROL' OPERATORS, AUXILIARY OFIR/ TORS AND TRAINING STAFF (Discuss March '8, 1080 Denton Mem-)
c 3
CLASSROCM TRAINING FLANS S L Hubbard L.
CBSERVATION TRAININO FLANS J P Flynn 5
SIMULATOR TRAINING AND FLANS FOR CFC0 SDIULATOR A A Ye ;ng/S L Hubbard i
6.
PROFCSED SCHEDULES FOR RE!AINDER OF TRAINING G B S1sde/S L Hubbard i
7 REQUALIFICATION PRIOR TO LICENSE AND CONTINGETCY S L Hubbard FOR DELAY IN FUEL LOAD i
chir ENGINEER TRAINING FROGRAM G B S1 tde/A A Young a
I, g.
S' 0!ARIZE ""d2 OVERALL TRAINING PROGRAM G B Slade 10.
REVII'J ACTION ITEMS IDENTIFIED 11.
QUESTIONS AND DISCUSSION G 3 Slade 10/26/60