ML19345B718

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-364/80-33 on 800825-27 & Notice of Violation
ML19345B718
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 09/18/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML19345B715 List:
References
NUDOCS 8012020400
Download: ML19345B718 (2)


See also: IR 05000364/1980033

Text

.

a ug

UNITED STATES

8

n

NUCLEAR REGULATORY COMMISSION

,

$

nE

REGION ll

101 MARIETTA ST.. N.W., SUITE 3100

ATLANTA. GEORGIA 3o303

    • ..+

In Reply Refer To:

RII:BRC

50-364/80-33

Alabama Power Company

ATTN:

R. P. Mcdonald

Vice President-Nuclear Generation

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

.

This refers to the inspection conducted by B. R. Crowley of this office on

August 25-27, 1980, of activities authorized by NRC Construction Permit No.

CPPR-86 for the Farley facility, and to the discussion of our findings held with

W. G. Hairston at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

We have examined actions you have taken with regard to previously reported

unresolved items.

The status of these items is discussed in the enclosed

report.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements. This item and references

to pertinent requirements are listed in the Notice of Vio'lation enclosed herewith

as Appendix A.

This notice is sent to you pursuant to the provisions of Section

2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-

tions. Section 2.201 requires you to submit to this office, within-20 days of

your receipt of this notice, a written statement or explanation in reply including:

(1) corrective steps which have been taken by you and the.results achieved; (2)

corrective steps which will be taken to avoid further noncompliance; and (3) the

date when full compliacce will be achieved.

In accordance with Seucion 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations,

a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the ' application is contained in a

separate part of the documen .. If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

8 012020 goo

..

.

-

.

5

SF P 181980

Alabama Power Company

-2-

,

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

h)

2"

7

C. E. Murphy, Chief

Reactor Construction and Engineering

Sunport Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-364/80-33

cc w/ enc 1:

A. R. Barton, Executive Vice President

II. O. Thrash, Manager, Nuclear Generation

F. L. Clayton, Jr. , Senior Vice President

W. C. Petty, Manager-Quality Assurance

(Design and Construction)

W. G. Hairston, III, Plant Manager

R. E. Hollands, Jr. , QA Supervisor

O. D. Kingsley, Jr. , Man;ger, Nuclear Engineering

and Technical Services