Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000255/1988015 + (ML18054A349)
- ML18054A350 + (ML18054A350)
- ML18054A354 + (ML18054A354)
- ML18054A355 + (ML18054A355)
- ML18054A356 + (ML18054A356)
- ML18054A357 + (ML18054A357)
- ML18054A358 + (ML18054A358)
- ML18054A362 + (ML18054A362)
- ND-18-0257, Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.3.07.05.i (Index Number 396) + (ML18054A369)
- ML18054A371 + (ML18054A371)
- ML18054A375 + (ML18054A375)
- ML18054A380 + (ML18054A380)
- IR 05000255/1988018 + (ML18054A383)
- 05000255/LER-1988-017, :on 880911,inadvertent Containment Isolation Signals Received.Caused by Electrical Noise Generated from Starting & Stopping Motor for Temporary Pump Which Seized. Logic Reset & Failed Pump Replaced + (ML18054A386)
- 05000255/LER-1988-016, :on 880911,inadvertent Containment Isolation Signal Received When Temporary Filter Element Carried by Radiation Monitor RIA-231.Caused by Temporary Filter Element Being Removed from Containment.Monitor Reset + (ML18054A388)
- ML18054A391 + (ML18054A391)
- ML18054A393 + (ML18054A393)
- ML18054A396 + (ML18054A396)
- ML18054A397 + (ML18054A397)
- 05000255/LER-1988-019-01, :on 881001,inadvertent Containment Isolation Actuation Signal Received During Performance of post-mod Test to Verify Proper Reinstallation of Left Channel Containment High Radiation Initiate Switch + (ML18054A399)
- 05000255/LER-1988-018, :on 881027,inadvertent Containment Isolation Signal Received.Caused by Personnel Error & Inadequate Communication.Administrative Procedures 9.05 & 4.03 Revised + (ML18054A400)
- ML18054A404 + (ML18054A404)
- ML18054A405 + (ML18054A405)
- ML18054A406 + (ML18054A406)
- IR 05000255/1988023 + (ML18054A409)
- ML18054A411 + (ML18054A411)
- ML18054A412 + (ML18054A412)
- ND-18-0185, Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.2.03.05a.i (Index Number 165) + (ML18054A413)
- ML18054A414 + (ML18054A414)
- ML18054A415 + (ML18054A415)
- ML18054A418 + (ML18054A418)
- ML18054A419 + (ML18054A419)
- ML18054A420 + (ML18054A420)
- ML18054A422 + (ML18054A422)
- ML18054A423 + (ML18054A423)
- ML18054A424 + (ML18054A424)
- ML18054A425 + (ML18054A425)
- ND-18-0258, Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.3.06.05a.i (Index Number 361) + (ML18054A426)
- ML18054A429 + (ML18054A429)
- 05000255/LER-1988-021, :on 881104,several Spurious Unexplained Svc Water Pump Trips Occurred.Caused by Original Relay Settings Which Did Not Account for Motor Svc Factor Rating.Protective Relays Reviewed + (ML18054A432)
- 05000255/LER-1988-015, :on 880903,fuel Bundle Observed Hanging from Bottom of Upper Guide Structure.Caused by Bundle Adhering to Guide Pins.Remainder of Fuel Bundles in Core Visually Inspected + (ML18054A433)
- ML18054A437 + (ML18054A437)
- ML18054A438 + (ML18054A438)
- IR 05000255/1988019 + (ML18054A440)
- ML18054A441 + (ML18054A441)
- PNO-III-88-097, on 881205,tube Leak Identified in Steam Generator B.Unit Shut Down.Outage Planned to Repair Leak & Perform Other Maint,Including Replacement of Primary Coolant Pump Seal & Repair of Primary Safety Valve Leak + (ML18054A442)
- PNO-III-88-101, on 881207,util & Bechtel Announced Signing of Agreements for Jointly Owned Company to Acquire Facility & to Resolve Outstanding Claims Associated W/Midland Nuclear Plant Const Project.State of Mi Will Be Informed + (ML18054A443)
- ML18054A444 + (ML18054A444)
- ML18054A447 + (ML18054A447)
- ML18054A448 + (ML18054A448)
- ML18054A449 + (ML18054A449)