ML18054A422

From kanterella
Jump to navigation Jump to search
Forwards Palisades Nuclear Plant 1988 Steam Generator Inservice Insp Rept. Total of thirty-four Steam Generator Tubes Plugged During 1988 Refueling & Maint Outage
ML18054A422
Person / Time
Site: Palisades 
Issue date: 11/15/1988
From: Frisch R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML18054A423 List:
References
NUDOCS 8811210180
Download: ML18054A422 (2)


Text

---..

consumers Power POWERING JllllCHIGAN'S PROGRESS General Offices: 1945 West Parnell Road, Jackson, Ml 49201 * (517) 788-0550 November 15, 1988 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT -

1988 STEAM GENERATOR INSERVICE INSPECTION REPORT The enclosed Steam Generator Inservice Inspection Report is submitted in accordance with Technical Specification 4.14.5.

The inspection began subsequent to a steam generator tube leak which resulted in an orderly plant shutdown on August 8, 1988.

A total of thirty-four steam generator tubes were plugged during the 1988 Refueling and maintenance outage.

In addition, eleven plugs were replaced as a corrective measure and one additional tube end was plugged to correct a previous mistake.

rl<1~Qf~

Ralph R Frisch Senior Licensing Analyst CC Administrator, Region III, NRC NRC Resident Inspector - Palisades Attachment OC1188-0203-NL02

=:s 1121 o 1 ::rc>s-s-n:T5

~DR ADOCK 05000255

~

PDC

t OC1188-0203-NL02 ATTACHMENT Consumers Power Company Palisades Plant Docket 50-255 1988 STEAM GENERATOR INSERVICE INSPECTION REPORT November 15, 1988 464 Pages